lb液压马达技术协议1.doc_第1页
lb液压马达技术协议1.doc_第2页
lb液压马达技术协议1.doc_第3页
lb液压马达技术协议1.doc_第4页
全文预览已结束

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

附件I 技术协议APPENDIX I Technical Agreement双方通过商榷,对*有限公司的1000x2000榨机双辊喂料器液压马达驱动系统在技术参数,供货范围,检验,安装,调试,培训,操作达成如下协议。Both parties had discussed thoroughly the technical aspects regarding the supply of hydraulic drives equipment for Guangxi Laibin Yongxin Sugar Co., Ltd 1000x2000 sugar mills pressure feeder drive, and agreed to sign this agreement as the reference for technical specification, scope of supply, inspection, installation, commissioning, training and operation of the hydraulic drives equipment.1榨机参数a). 4座1000x2000榨机。榨机由直流电机经减速器通过联轴器驱动b). 现有装机功率:700Kw; c). 实际转速:0 6.5Rpm.d). 动力电:3相 380 Volt, 50 Hz.e). 控制电压:220VACf). 冷却水温度;30g). 榨季环境温度:030h). 榨季湿度:85%Sugar mill specificationa). 4 sets of 1000x2000 sugar mills. The mill is drive by DC motor, roll drive by gear box via tail bar.b). Installation power at present is: 700Kw;c). The actual speed is between: 0 6.5Rpmd). Electric grid: 3-ph 380 Volt, 50 Hz.e). Control voltage: 220VACf). Cooling water temperature: 30 C g). Ambient temperature in sugar season:0 30 Ch). Relative Humidity in sugar season:85%2. 双辊喂料器驱动参数用赫格隆驱动系统驱动双辊喂料器,且它的速度依附于主榨机速度的速度,并由PLC控制系统控制。a). 装机功率:400Kwb). 运行速度:09.6Rpmc). 液压马达:MB1600-CNd). 工作油压:160200bare). 工作扭矩:29Tm f). 最大扭矩:39Tm Pressure feeder drive specificationUse Hagglunds Drives system to drive pressure feeder, and the pressure feeders relates to the mill, and controlled by PLC.a). Power installation is 400Kwb). The speed is 09.6rpmc). Hydraulic motor: MB1600-CNd). Normal work pressure:160200bare). Work torque:29Tmf). Max torque:39Tm3. 供货范围 序号名称型号数量1液压马达MB1600-CN2台2扭力臂TMA80-22台3编码器SPLL85D-10004台4 编码器安装架SMMM-14台5安装工具 MTMM-11套6动力站PEC 603-355/355-200/2002台7spider 控制器2台8PLC 控制系统(包括通信总线,为2座榨机配置)1台9加油泵1台10滤芯备件9件11工具1套12控制电缆 2套13 现场调试 (人天)10 天14管路系统(国内供应)2套 Scope of Supply: Itemdescriptionmodel no.quantity1hydraulic motorMB1600-CN2 pcs2torque armTMA80-22 pcs3speed encoderSPLL85D-10004 pcs4 mounting set for encoderSMMM-14pcs5mounting tools MTMM-11 pc6power unitPEC 603-355/355-200/2002 sets7spider control system2 pcs8PLC drive control system(with Profibus I/O for 2 sets mills control)1 sets9oil filling pump1 set10spare parts filter cartridge9 pcs11hands tool kit1 set12control cable set, form mill to PLC 2 sets13 supervision on site (man days)10 days14piping hardware (purchase in China)2 sets4. 技术服务1. 设备到糖厂后,供货方免费派专业人员到现场调试:管路安装,指导糖厂技术工安装液压马达和动力站,安装检查,运行调试。同时对糖厂有关人员操作维护培训。2. *厂为调试人员提供当地交通,膳食及住宿(在*区)。3. *厂负责设备安装,并提供技术工及所需普通工具设备等。4. 喂料器速度依附于主榨机的转速自动调节,也可根据高位槽料位的高低自动调速。Technical service1. After arrival of the equipment at sugar mill, the seller will send professional service personnel for on-site commissioning: installation piping, instruct sugar mills workers installation hydraulic motor and power unit, check, startup. And also provide training to the maintenance staff in order to have a smooth running operation.2. Sugar mill will provide local transport, meal and accommodation at commissioning site.3. Sugar mill to be responsible for the installation work and provide skilled labour, tools and equipment as required.4. The speed of pressure feeder automatic following the mills speed, and also has chute control function.5. 技术资料1. 合同签定4周,买方提供设备所需接口图纸给供货方。2. 合同签定6周,供货方提供设备所需接口初期图纸,电控初期图纸给买方。3. 液压马达与榨辊的过度轴图由双方确认,并在图纸上签字。4. 液压马达安装在榨机的哪一侧,由双方确认。Technical documents1 The buyer will supply interface drawing to the seller 4 weeks after signing contract.2 The seller will supply preliminary interface drawing, electric drawings to the buyer 6 weeks after signing contract.3 The adaptor between the roller and hydraulic motor will be approved by the buyer and the seller, and both parties shall sign on the drawing.4Hydraulic motor to be installed on which side of the mill will be approved by the buyer and the seller.6. 保修期及售后服务卖方保证所提供产品的质量保证期为设备投入生产后12个月或到货后18个月,以先到为准。在质量保证期内,由于设备本身所产生的问题,卖方负责免费解决。对买方的问题,卖方应给于协助。出现重大故障,卖方48小时赶到现场。Garantee and after sales:The guarantee period shall be 18(eighteen) months counting from the date of arrival at China Port of Contract Equipment, or 12(twelve) months counting from the date on which the goods is installed and operation, whichever is earlier will count. In guarantee, if itself of the Sellers equipments problem, the Seller should be free in charge solve the problem, if the problem is come from the Buyer, the Seller should be h

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论