全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Once stretched to lead to flow hole import, this was subjected to restriction on the geography, as a result not adoption.But the concrete gravity type round an embankment,Have a stability, anti- to hurtle an etc. advantage, so round embankment choice the concrete gravity type structure in this upper stream that leads to flow engineering.7.3.2Round an embankment design1.the upper stream concrete round embankment embankment body Gao Chengs draw-upThe design of rounding the embankment blocks amount of water current Q=2120 ms 3| ses, correspond the water level as EL96.5 m, choose concrete to round an embankment embankment crestGao Cheng is an EL96.5 m, another take over to visit a side to use a hemp pack a heap to build a high 1 m in the embankment of defend a wave wall.2.round embankment design parameter choiceThe geology data that provides according to the tender document, the embankment address area is a biotite to spend a Gang stone, reference relevant data, first stepDrafting the physical mechanics property index sign of radicle rock is:The concrete is:f=0.95 C=12kg|cm2The concrete spends the anti- of Gang stone with weak morals and custom biotite to shear parameter for:f=0.65 C=0Concrete density =2.35 ts|m2Design discharge:The design of rounding the embankment blocks amount of water current Q=the 2120 ms is 3| ses, namely 103 month P=20%;The school checks discharge forQ=the 6950 ms is 3| ses, namely P=5%.3.round an embankment calculation formula and correspond safe coefficientRound an embankment design stable safe coefficient according to water conservancy water electricity construction organization design norm Article 2.2.27 with2.4.9Takes a value, anti- clipping safe coefficient K2 3, allow to pull in response to the dint: =-0.1-0.15 MPas.While designing dischargeThe anti- slips a stability: K=f W+CA| P=8.43 safetyBase in response to the dint: =N|B(1 6 es|B)=5.1 kgs|cm 20.5kg|cm2When school checked dischargeThe anti- slips a stability: K=f W+CA| P=133 safetyBase in response to the dint: =N|B(1 6 es|B)=6.9 kgs|cm 2-0.5kg|cm2BE allowing scope inside.The school checks discharge Q=6950 ms 3| ses, embankment crest over flow Tai complicated, draw up at in the mark juniors go model experiment, againCarry on checking to calculate.4.round embankment decoration and structureUpper streams rounding an embankment decoration is on-line to visit about the 60 m in the dam stalk, its position BE:dam ascend 0+76, dam right 0+110 go to damAscend 0+60, dam right 0+198.The embankment body presses concrete structure for the gravity type Nian, embankment crest EL96.5, tingle a pack to defend a wave wall crest EL97.5 m.Embankment crest breadth5 ms, the embankment crest is long about the 90 ms, the biggest embankment high 28.5 ms, the biggest bottom breadth 20.125 ms.Face surface perpendicular, back surface is one 0.55, the embankment body radicle rock noodles goes to EL77 the ms sprinkle to build abnormal concrete and connect place with cross-straits hillside to spread to build 1 m or so normalConcrete.The foundation requests to be located the noodles is at the weak morals and custom rock up.The concrete engineering measures for the 15017 ms 3, among them EL77 mFollowing normal concrete 3310 ms 3.5.top and bottom the traveller round an embankment designEmbankment crest Gao Chengs draw-up:Analyze a calculation according to a period of 10 days average discharge data, each a period of 10 days getting for 89 months flows on the averageMeasure frequency to see table 7-3.Table 7-3 eight, in September a period of 10 days average discharge formAugust time SeptemberDischargeIn the frequency bottom top medium bottomP=20% 308 310 325 236According to starting construction total progress arrangement, the piece flows and corresponds piece to flow the discharge as Q on September 10, 1998=the 325 ms is 3| ses,Correspond the water level as EL76.5 m, the choice cuts to flow the Chuang dike as EL77 ms.In consideration of October three years a meet flood dischargeQ=the 620 ms is 3| ses, making selection a traveller to round an embankment Gao Cheng is an EL80.5 m.The Jian dike engineering is a 2168 ms 3.The green river reservoir of the cotton pool dam address downstream normal water level is an EL73.6 m, making selection the downstream son embankment embankment a crest Gao Cheng BEEL74 m.6.the structure form of the top and bottom travellers embankmentUp, downstream son the embankment all adopt a ground to round an embankment and face a surface to use to glue an inclined wall of soil to defend to ooze, the slope is one 2, back surfaceFor one 1.5.Last the traveller round an embankment embankment crest Gao Cheng is an EL80.5 m, crest the breadth 6 ms, embankment crest length about 40 ms.Descend a traveller to round an embankment embankment crest Gao Cheng is an EL74 m, crest the breadth 6 ms, embankment crest length about 38 ms.Up and down the traveller the embankment stalk line position sees table 7-4.Table 7-4 top and bottom traveller the embankment stalk line position formC D E FDam ascend 0+1160+s 106Dam right 0+1500+s 1880+s 1160+s 162Dam descend 0+3040+s 300Last the traveller round an embankment ground the engineering measure for the 5153 ms 3, descend a traveller to round an embankment ground the engineering measure for the 1387 ms 3.7.4Round an embankment constructionUp and down visit to round the embankment amount of engineering:the concrete 17385 ms 3, the ground square fills to build engineering to measure a 6540 ms 3, op
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 新闻选题试题及答案
- 2026年贵州住院医师-贵州住院医师核医学科历年参考题库含答案解析
- 2026年营销师资格考试-助理营销师(三级)历年参考题库含答案解析
- 2026年税务考试-金税工程三期考试历年参考题库含答案解析
- 2026年礼仪风俗传统文化知识竞赛-范蠡知识竞赛历年参考题库含答案解析
- 2026年石油石化技能考试-塑料编织生产操作工历年参考题库含答案解析
- 2026年环保知识生态建设知识竞赛-节水型社会知识竞赛历年参考题库含答案解析
- 2026年煤炭矿山职业技能鉴定考试-造气操作工历年参考题库含答案解析
- 2026年煤炭矿山职业技能鉴定考试-打眼工历年参考题库含答案解析
- 2026年火电电力职业技能鉴定考试-电网调度安规考试历年参考题库含答案解析
- 2026年意识形态测试题及答案
- 新版部编人教版六年级上册语文全册新优教学设计(2026年秋改版教材)
- 2025-2026年网络安全法律法规与标准知识点巩固习题
- 变电土建设计培训
- 新版2026秋统编版(新版)小学道德与法治四年级上册(全册)知识点清单梳理
- 2026年部编版新教材道德与法治四年级上册全册教案设计(共4个单元含教学计划)
- 2025 成人失禁性皮炎护理指南(中文版)+预防与处理规范
- 定向钻专项施工方案
- 水利水电工程岩土渗透性原位试验规程 第2部分:注水试验
- 2026年出版专业技术人员职业资格考试(中级)基础知识试题与答案
- 2026年高考英语全国I卷真题试卷+解析及答案
评论
0/150
提交评论