ITP-comment.doc_第1页
ITP-comment.doc_第2页
ITP-comment.doc_第3页
ITP-comment.doc_第4页
ITP-comment.doc_第5页
已阅读5页,还剩11页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

N262 Octabuoy Project Inspection and Testing PlanNODESCRIPTIONS & NOTESBYDATELIST OF ALTERATION1 N/A INSPECTION AND TEST PLAN (ITP)ITEMDWG NODRAWING NAME OR DOCUMENTS TITLELIST OF REFERENCE DRAWING AND DOCUMENTS2008.9.18Issued for Approval2008.8.181Issued for Approval2008.5.100Issued for ApprovalDATEREV.DESCRIPTIONPRE.CHK.APPD.BUILDERCOSCO (NANTONG) SHIPYARD CO. LTDHULL No.N262CLASSABSOWNERATP OIL & GAS (UK) LTDVictoria House, London Square,Cross Lane, Guildford, Surrey GU1 1UJ, U.K.Tel: +44(0)1483.307200 Fax: +44(0)1483.307222 Website: PROJECTN262-OCTABUOY PROJECTINSPECTION AND TEST PLAN (ITP)DOC. NO.N262-QA/QC-02SFI NO.N/ACOSCO SHIPYARD GROUP CO. LTDNo. 1 Zhongyuan Road Nantong, Jiangsu 226005, ChinaTel: +86 21 5860 0111 Fax: +86 21 5860 8207 Website: This drawing or document is the intellectual property of COSCO shipyard group Co,.Ltd and may not be reproduced,sold or used in whole or in parts for any propurse without the written approval of COSCO shipyard group Co. Ltd.PAGE1/16OwnerClassHullMachPipingOutfittgHVACE&IShopPJMQA/QCHSETC-NTTC-SHTotalTable OF Content1.0 General2.0 Changes to Previous Revisions3.0 Notification for Inspections4.0 Definitions & Abbreviations5.0 Referenced Documents6.0 QA/QC Organization Chart7.0 Document Processing8.0 Main Hull (Including Spud Can & Superstructure)9.0 Piping1.0 GENERAL 1.1 This ITP covers the inspection and testing described in the Project Quality Plan for the N262 Project. The main objective of this ITP is to control the work with applicable procedures and to apply Hold, Witness, Review and Monitor points during the different stages of fabrication, erection, and installation for equipment. This ITP may be revised as required to suit the needs of the project during the Construction and the Test phases.1.2 For designated inspection points, notice shall be given to Owner and ABS. Work may not proceed past a designated “HOLD POINT”, unless authorized in writing by the Owner and ABS Site Representative.1.3 None of the requirements listed in this ITP shall relieve COSCO of their responsibility to establish and implement procedures and techniques that ensure the integrity and workmanship of the construction.1.4 In addition to these methods and sequences, supplementary line items and applicable procedures shall be generated from time to time during the execution stages, so as to ensure full implementation of the Contract requirements, referenced Codes, Standards and Specifications. If workmanship is found to be unsatisfactory then the Owner reserves the right to change the inspection category (e.g. “Monitor” to “Witness” category).2.0 CHANGES TO PREVIOUS REVISIONSRevisionChange IDDescription of change0NA, First issue for approval3.0 NOTIFICATION FOR INSPECTIONS3.1 Daily inspection schedule will be submitted to Owner and ABS by e-mail or other method. Except that “Hold” point for Owner and ABS, other inspection activity can be deemed acceptable without comments from Owner or ABS if they do not present at the shop half hour after scheduled inspection time.3.2 Owner and ABS shall sign inspection report prepared by QC after the inspection is completed. If rejection happened, COSCO shall take immediate corrective actions on deficiencies commented and then re-submit to owner and ABS for verification.3.3 For off-yard inspection in Nantong and out-of Nantong, notification shall be submitted at least 24 and 48 hours in advance, respectively,for inspection to be carried out on a Monday, inspection notification shall be submitted at least 72 hours in advance.3.4: All inspection notification shall be issued by Cosco Project Team. All inspection trip arrangement shall be aranged by Cosco Project Team and not to be arranged thru any of Coscos sub-contractor or sub-contractors agent.3.5 If for any reason, the scheduled inspection is cancelled or postponed, COSCOs QAQC shall inform Owner and ABS in advance.4.0 DEFINITIONS 4.1 Hold Point (H)l An identified inspection point in the fabrication which work shall not proceed without the specified activity, work or function being witnessed or verified as acceptable by inspector. .l A minimum notification (in writing) of 24 hours shall be given to the Owner or ABS. 4. 2 Witness Point (W)l An identified inspection point in the fabrication which will be witnessed or verified by inspector. If inspector is not available at notified schedule, fabrication process can be proceeding.l A minimum notification(in writing) of 24 hours shall be given to the Owner or ABS. 4. 3 Monitoring (M)l An identified point during fabrication as an activity, work or function is observed by inspector. Normal notice is not required to be given to the Owner or ABS.4. 4 Review (R)l The quality report/certificate applicable to the specified inspection and test activity shall be physically reviewed by inspector.4. 5 Perform Work (PW)l An identified point during fabrication as an activity, work or function is performed by inspector or relevant personnel.4. 6 Approve (A)l Approval by endorsement of verifying document.5.0 REFERENCED DOCUMENTS5.1 All referenced documents as identified within the Contract Specifications shall be the latest revision/edition at the time of Contract signing, unless noted otherwise.5.2 All construction shall comply with design drawing general notes and the latest revision of the following:l Contract Specifications and referenced Codes, Standards and rules, therein.l ABS MODU Rulesl Approved COSCO Quality and Construction Proceduresl Approved drawingsl Approved COSCO Yard Standards and Practice Rev.1 Page 16 of 166.0 DOCUMENT PROCESSINGNO.ITEMPROCESS DESCRIPTIONRECORDCOSCO(NT)OWNABSREMARK6.1Reviewing Specificcontract RequirementContract ReviewSpecification Clarification,Exceptions & DeviationsRRR6.2Planning ProjectQuality SystemPreparation & Issuance of Quality DocumentProject Quality Plan & Approved ProceduresHAA6.3Document Control & RegistrationDocument ControlMaster Document RegisterRMM6.4Design & EngineeringDesign & Engineering ReviewProject Specification & DrawingHR(A)R(A)6.5Drawing ReviewReviewDrawingsHAA6.6ConstructionEngineeringDocumentsPreparation & Issuance of Construction Procedures/Shop DrawingApproved Construction ProcedureHR/AR/A6.7As-Built DrawingReviewAs-Built DrawingHAA6.8Final Documentation/Construction PortfolioReviewFinal DocumentationHRR7.0 MAIN HULL (INCLUDING LOWER PONTOON,COLUMN & SUPERSTRUCTURE)NO.ITEMPROCESS DESCRIPTIONVERIFYINGDOCUMENTRECORDCOSCO(NT)OWNABSREMARK7.1Structure DrawingsReviewApprovalContract Specs.Approved DrawingsHR/AR/A7.2Preparation ofWPS,&PQR testingReview WPS PQR TestingABS-MODU-Part2-Chapter4Approved WPS/PQR testingHR/W/AR/W/A7.3Welder/Tack WelderQualificationQualificationABS-MODU-Part2-Chapter4-Sec.3Welder /Tack Welder CertificatesWelder /Tack Welder ListHAA7 .4Welding ConsumableReviewABS-MODU-Part2-App.2, 3Welding Consumable CertificatesM/RA/RA/R7.5NDTNDT InspectorsQualificationABS-MODU-Part2-App.1ABS-MODU-Part2-Chapter4-Sec.3NDT Inspectors QualificationCertificatesNDT Inspectors ListPWAAApplicable NDTAcceptance CriteriaApproved NDT PlanHAANDT MethodsApproved RT ProcedureApproved UT ProcedureApproved PT ProcedureApproved MT ProcedureNDT ReportsRA/WART Films ReviewApproved RT ProcedureRT ReportRR/AR/A7.6Receipt & PreservationOf MaterialsVisual InspectionContract Specs.Approved DrawingsABS-MODU-Part2-Chapter1Materials CertificatesMaterials ListPreservation FormHM/R/WM/RInitial approval and monitoringMeasurement7.7Materials PretreatmentVisual InspectionContract Specs.FDMA/MM7.8Materials CuttingVisual InspectionApproved DrawingsABS-MODU-Part2-Chapter4-Sec.1Cutting File with Traceability Information PWMM7.9Block BuildingEdge PreparationApproved WPSApproved DrawingsApproved ProcedureABS-MODU-Part2-Chapter4-Sec.1Material Traceability RecordWelding Traceability RecordMeasurement RecordBlock Inspection ReportNDT ReportPWMMFitting upAlignmentPWM/A/WM/A/WSpecial areaTack WeldingMMMSpecial areaPreheat(If necessary)MM/AM/ASpecial areaWeldingApproved WPSABS-MODU-Part2-Chapter4-Sec.1MMMWelding Visual InspectionABS-MODU-Part2-Chapter4-Sec.1HWWNDTGuide for nondestructive inspection of hull welds 2002(ABS)HM/R/WM/RMeasurementApproved DrawingsHM/RM/RFinal visual inspectionABS-MODU-Part2-Chapter4-Sec.1HH/AH/ATightness TestApproved DrawingsApproved Tightness Test ProcedureABS-MODU-Part3-Chapter1HH/W/AH/W/A7.10Block Lifting PadeyeFitting upWeldingApproved WPSApproved WPSHM/WMNDTSame to Structure NDTNDT RecordHM/WM7.11Block Erection(Butt Joint)Edge PreparationApproved WPSApproved DrawingsABS-MODU-Part2-Chapter4-Sec.1Material Traceability RecordWelding Traceability RecordMeasurement RecordBlock Inspection ReportNDT ReportHMMFitting upAlignmentHHHHold for primary and special areasTack WeldingMMMPreheat(If necessary)MM/WM/WFor temperature over 50WeldingMMMWelding Visual InspectionABS-MODU-Part2-Chapter4HHHNDTGuide for nondestructive inspection of hull welds 2002(ABS)HM/R/WM/RMeasurementApproved DrawingsPWM/R/WM/RTankTightness TestApproved Tightness Test ProcedureABS-MODU-Part3-Chapter1HH/AH/A7.12Welding RepairGrinding/GougingRepair WPSABS-MODU-Part2-Chapter4-Sec.1Repair Welding Traceability RecordMM/AM/ARewelding7.13Temporary HoleOpening/ClosingApproved Temporary HolePlanApproved WPSTemporary Hole ClosingWelding Traceability RecordHAA7.14Main HullMeasurementVisual Hull Principal DimensionApproved DrawingHull Principal Dimension RecordHW/RW/R7.15Release check before coatingRelease check for structureQuality assurance planMaterial/welding/NDT stateHHHSurface preparation7.16CoatingInspection of D.F.TCoating specificationCoating reportPWM/WMFinal visual inspectionHHMInspection report sign by paint manufactory7.17Foundation & Seating& SupportsLayout CheckingApproved DrawingMaterial Traceability RecordWelding Traceability RecordHRRFitting upAlignment (Frab.)Approved WPSPWM/WMW for Primary WeldingMMMWelding VisualApproved Visual ProcedureHA/WA/WNDTApproved NDT PlanNDT ReportHA/WAMeasurement(Including Alignment)Approved DrawingMeasurement RecordHA/WA7.18Vessels Markings(Including Vessels Name,Loadline, Draft Mark,Tank Mark etc)VisualApproved DrawingInternational RulesInspection RecordWA/WA/W8.0 PIPING NO.ITEMPROCESS DESCRIPTIONVERIFYINGDOCUMENTRECORDCOSCO(NT)OWNABSREMARK8.1Piping DrawingsReviewApprovalContract Specs.Approved DrawingsHAA8.2Preparation ofWPS&PQR testingReview QualificationTestingABS-MODU-Part2-Chapter4-Sec2 Approved WPS/PQR testingHA/WA8.3Welder/Tack WelderQualificationQualificationABS-MODU-Part2-Chapter4-Sec.3Welder /Tack Welder CertificatesWelder /Tack Welder ListHA/WA8 .4Welding ConsumableReviewApprovalABS-MODU-Part2-APP.-SEC.1Welding Consumable CertificatesM/RM/RM/R8.5NDTNDT InspectorsQualificationABS-MODU-Part2-Chapter4-Sec.3NDT Inspectors QualificationCertificatesNDT Inspectors ListHA/WAApplicable NDTAcceptance CriteriaApproved NDT PlanHAANDT MethodsApproved RT ProcedureApproved UT ProcedureApproved PT ProcedureApproved MT ProcedureNDT ReportsRR/AART Films ReviewApproved RT ProcedureRT ReportHR/AR/A8.6Receipt & PreservationOf Materials(Including piping fittings valves)Visual InspectionContract Specs.Approved DrawingsMaterials CertificatesMaterials ListPreservation FormRH/RRMeasurementMaterials Traceability8.7Fabrication & InstallationFitting upApprovedDrawingsApproved WPSApprovedProcedureABS-MODU-Part2-Chapter-Sec.2Piping Welding Traceability RecordInspection RecordPWM/WMClass 1 (W)Preheat(If necessary)PWMMTack WeldingMMMWeldingMMMWelding VisualHAAMeasurementOrientationApproved DrawingMeasurement RecordPWR/MR/M8.8Piping SupportsVisualApproved DrawingPiping Support ListHAAInstallation inspectionApprovedProcedureInspection RecordHWW8.9Hydrostatic TestsBefore InstallationApproved ProcedureABS-MODU-Part2-Chapter-Sec.2Hydrostatic Test RecordHHHAfter InstallationHydrostatic Test

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论