




免费预览已结束,剩余3页可下载查看
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
EPCIC OF WELLHEAD PLATFORMS, ASSOCIATEDPIPELINES AND TIE-INSOFZAWTIKA DEVELOPMENT PROJECT PHASE 1BHAZID Terms of ReferenceDOCUMENT CLASS: 1A121-jun-14Issued for ReviewREVDATEBYDESCRIPTIONCHECKAPPR.CHECKAPPR.ENGINEERING APPROVALCOMPANY APPROVALREVISION CODE: A = Issued for Review B = Issued for Approval C = Approved for Design or Approved for Construction or Issued for Implementation or Issued for Purchase or Issued for Purchase SpecificationTOTAL OR PARTIAL AND / OR UTILIZATION OF THIS DOCUMENT ARE FORBIDDEN WITHOUT PRIOR WRITTEN AUTHORIZATION OF THE OWNERPTTEP INTERNATIONAL LIMITEDEPCIC OF ZAWTIKA DEVELOPMENT PROJECT PHASE 1BREVA11 项目概述1.1 GeneralThe Zawtika Project is a gas field development project located in the Gulf of Martaban, Myanmar. The development area covers Block M9 and small portion of Block M11, owned by Myanmar Oil & Gas Enterprise (MOGE). The field lies approximately 300 km south of Yangon and 290 km west of Tavoy on the Myanmar coast and the average water depth is approximately 140-150 meters.Figure 1.1: Zawtika Field LocationZawtika field development is planned in three phases 1A (existing facilities), 1B and 1C as per Figure 1.2 Zawtika Field Layout. Phase 1A development consisting of Zawtika Processing integrated with living quarter platform (ZPQ), WP1, WP2, and WP3 is currently being developed. Commercial production is expected to commence in the first quarter of 2014. Phase 1B and 1C (remote wellhead platforms) will be developed in order to sustain production plateau through the field life.Figure 1.2:Zawtika Field Layout1.2 ObjectivesThe intent of the HAZOP review is to systematically review the design and operations of the WP4/5/7 and WP4 facilities and Brown Field modifications of existing platforms ZPQ, WP2, and WP3 to identify any safety and operability problems associated with the processes.The risk management objectives of the HAZOP Review are to: Identify safety related hazards and operability concerns related to the process; Determine the consequences for the identified hazards and operability concerns; Identify engineering safeguards and future procedural controls already incorporated into the design that will reduce the likelihood, or associated consequence, of the identified problems; Evaluate the adequacy of existing engineering safeguards and future procedural controls in place for the facilities; and Recommend additional engineering safeguards and/ or future procedural controls, where necessary.Note that risk ranking will not be conducted for this HAZOP Study.1.3 Scope of studyThe scope of the HAZOP study includes review of topsides design associated with the following facilities: Four new remote wellhead platforms (WHP) named WP 4, 5, 6, and 7 with pre-installed risers. WP4, WP5, and WP7 are 20-well slot type platform. WP6 is 12-well slot type platform. Four associated pipelines (IP4, IP5, IP6, and IP7) with their dog leg tie-in. The telecommunication and control systems integration WORK into existing facilities in ZAWTIKA field. Brown Field modifications of existing platforms ZPQ, WP2, and WP3.The HAZOP review will mainly address normal operating conditions.SIMOPS activities are not included in the scope of work.Vendor packages are excluded from the scope of the study.HAZOP will be conducted based on WP6 and WP4/5/7 Piping and Instrument Diagrams (P&IDs), Issued for Approval Revision, provided by COOEC.Future facilities such as the Booster Compressors on WPX are excluded from the scope of this HAZOP review as the information available for these facilities are still at the preliminary stage.2 执行计划、参与人员及流程介绍2.1 时间和地点HAZID计划执行2天,将于2014年X月XX日开始,2014年X月XX日完成。审查时间是每日9:00至17:30,其中包括1小时的午休时间。表2.1 HAZID会议执行计划表(第一天)Time Activity9.00 am HAZID组成员自我介绍9.15 am 推选HAZID组长9.30 am 工程方案分析10.30 am 休息10.45 am 制定HAZID引导词12.00 am 午餐2.00 pm 逐项细化风险识别与记录(1)3.45 pm 休息4.00 pm 逐项细化风险识别与记录(2)5.30 pm 结束当天会议Table 2.2 HAZID会议执行计划表(第二天)Time Activity9.00 am 昨日成果回顾9.15 am 逐项细化风险识别与记录(3)10.30 am 休息10.45 am 逐项细化风险识别与记录(3)12.00 am 午餐2.00 pm 主要风险HAZID汇总3.45 pm 休息4.00 pm 防控措施与安全建议总结5.30 pm 结束当天会议2.2 资料准备根据本次HAZID分析目的的需要,本次HAZID分析所需准备的基础资料包括了以下内容:可行性研究报告、工程方案、海域环境资料、类似工程项目资料以及其他可用的资料(如建设地气象水文地理地质数据、建设地社会环境分析、项目描述(项目各项备选方案、拟设计的生命周期和生产弹性等)、本项目适用的法律法规、关键设计原则或要求等、工艺流程图(PFD)、物料平衡图(表)、总图布置、工艺描述(包括各种可能操作工况)、安全设计原则和初步的操作原则)。2.2 成立项目组1、HAZID小组组织机构:HAZID组长:1人HAZID组成员:4-6人2、HAZID组长的要求:本次HAZID分析需要在一位组长的引导下完成。为了保证组长能全身心的投入分析引导工作,建议指定专门人员负责分析讨论的记录工作。HAZID组长应具备丰富的安全评价经验,以保持整个分析能在公平、公正和客观的氛围下进行。同时,主席应熟悉HAZID分析技术,具有较高的沟通技巧、会议进度控制能力和会场控制能力,可以在规定时间内,引领、激发分析小组所有成员投入HAZID分析过程,开展积极讨论,并带领分析小组取得卓有成效的分析成果。ISO310003、HAZID组员要求:所有参加HAZID分析的人员,可从事不同专业,包括但不限于项目管理、工艺、生产调度、操作、安全等。高级管理人员不仅要参与全局性、共性和项目执行问题的讨论,也要全程参与整个HAZID分析过程。分析小组其他成员,应根据HAZID分析的对象和目的予以确定,所选择的人员应熟悉项目的背景、建设地的情况、并了解各种备选方案,具有丰富的类似项目经验的人员将是分析成员的最佳候选人,这在本项目的HAZID分析中发挥出显著优势。沟通范围,业主2.3 内容及过程本次HAZID执行分析过程,包括危险源辨识(HAZARD IDENTIFICATION)、风险评估(RISK ASSESSMENT)、和风险管理(RISK MANAGE MENT)三个部分。危险源辨识作为风险分析的第一个步骤,不仅限于狭义的识别危险源,而是给予了更为宽泛的内涵,包括识别危险源、分析其原因和可能导致的后果,在此基础上进而分析是否需要开展有针对性的定量风险评估,藉此提出相应的建议或改进措施。3 技术要求及执行要点3.1 研究准备本次研究,在研究准备阶段,需要组建分析小组、收集基础资料、明确分析范围、确定分析引导词等活动。本次HAZID分析应关注工程方案本身的技术问题,还将讨论全局性、共性和项目执行过程中的问题时,则除专业技术负责人外,还应该考虑邀请来自投资方、承包商和运营商等相关方的项目高级管理HAZID分析资料的种类和详细程度决定了HAZID分析程度的深浅。如本项目可根据已有的工程方案,同时收集项目建设地的资料和项目立项资料,对项目共性问题和在项目执行过程中可能遇到的问题进行初步的HAZID分析,尽量针对项目中潜在的危险源开展较为详尽的HAZID分析。3.2 开展分析在进行本次分析时,可参考下面的分析引导词进行HAZID分析,分析结果记录在表1的分析清单例表中。常用的HAZID分析引导词如下。需要说明的是,下面所列出的引导词供HAZID分析参考。根据本项目特点,关注的问题应尽量全面。建议借鉴已有类似项目的引导词进行补充或筛减。本次HAZID分析鼓励头脑风暴,在进行分析时不能拘泥于此处所列举的引导词,在分析准备阶段、开始正式分析前,分析小组应根据本项目的具体特点,确定适用于本项目、大家共同关心的引导词或危险源。(1)共性危险源:有外部和环境危险源(自然灾害、人为制造的危险、周边设施中可能存在的危险源、环境问题)和健康危险源。(2)项目执行过程中的问题:项目合同签订策略、项目风险管理策略、项目应急计划。(3)设施危险源:物料危险源、活动危险源(超压、开停车、施工、维修等)、控制方式和原则、泄漏、火灾和爆炸、公用工程。本项目的HAZID分析,可以只
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 外事办公室翻译招聘面试(日语)经典题及答案
- 外事办公室翻译招聘面试(阿拉伯语)经典题及答案
- 2025跨国技术合作合同
- 2025年法制宣传日法律基础知识竞赛题库及参考答案
- 地理知识培训感受课件
- 大宗土石方运输协议
- 科技研发合作协议
- 地球队清洁工课件
- 2025年高热的护理试题及答案
- 跨部门协作的标准化工作流程
- 福建省福州市联盟校2023-2024学年高一下学期期末考试英语试题(解析版)
- 2025文化和旅游部直属事业单位招聘社会人员29人模拟试卷附答案详解
- 2024-2025学年重庆市万州区八年级(下)期末语文试卷
- 2025年乒乓球二级裁判考试题及答案
- 血标本采集考试试题附有答案
- 2025年公共安全生产试题及答案
- 员工工资及考勤管理制度
- 浙江省温州市龙湾区2024-2025学年七年级下学期学业水平期末检测数学试题
- 废料出售管理办法
- 2025年江苏省苏豪控股集团有限公司校园招聘笔试备考试题及答案详解(必刷)
- (完整)中小学“学宪法、讲宪法”知识竞赛题库及答案
评论
0/150
提交评论