FN-54-0.doc

海南三亚太阳湾柏悦酒店样板房CAD图纸.rar

收藏

资源目录
跳过导航链接。
海南三亚太阳湾柏悦酒店样板房CAD图纸.rar
海南三亚太阳湾柏悦酒店样板房CAD图纸
太阳湾柏悦酒店样板
PH-GR OMS 整合版
1. FN(FIN) - Finishes _ 饰面材料
2. FF(FIN) - Furniture Finishes _ 家具材料
3. FB(FAB) - Fabric _ 布艺
Readme-说明.htm
施工图纸
酒店客房图纸目录.pdf---(点击预览)
A1图框zz.dwg---(点击预览)
DETAIL - 400 & LOOSE
ELEVATION - 300
PLAN - 200
压缩包内文档预览:
预览图 预览图
编号:53864343    类型:共享资源    大小:63.13MB    格式:RAR    上传时间:2020-03-05 上传人:活*** IP属地:宁夏
12
积分
关 键 词:
海南三亚 太阳 湾柏悦 酒店 样板房 CAD 图纸
资源描述:
海南三亚太阳湾柏悦酒店样板房cad图纸.rar,海南三亚,太阳,湾柏悦,酒店,样板房,cad,图纸
内容简介:
outline material specification (oms) 项目名称 project namefirst issuedate :首版日期revision number :修订编号revision date :修订日期10093000物料编码 oms no.sunny bay, hainanpark hyatt海南太阳湾-柏悦酒店fin-01(fn-05(h)description物料说明:grey granite 灰花岗岩finish: honed 哑亚光thickness: 20mm 厚度manufacturer/supplier生产商/供应商:wi: the contractor co., ltd665 changhua roadjingan district, shanghai200041 chinat: + 8621 6276 5442f :+ 8621 6277 1421contact person: mr. daliemail: project manufacturer/ suppliers product name:- sesame grey granite 芝麻灰花岗岩补充说明 attached information:* the control sample is obtained from the manufacturer/ supplier mentioned above.contractor may bid out to qualified suppliers. 上述材料生产商/供应商需提供实物样板。施工单位可以分包给合适的材料供应商。wall & floor finishes granite installationsurfaces to receive granite include: cement plastered surfaces. concrete surfaces. cement fibreboards. existing tiled surfaces.the background must be clean, dry, firm and in position for at least 4 weeks prior to commencing of granite works.granite shall be installed in accordance to the manufacturers recommendation and in the pattern as laid out in the architectural and/or interior design drawings, or otherwise as instructed by the site architect.spread adhesive to small areas of approximately 1m at a time, to prevent surface drying or skin-over of adhesive bed. ensure solid-bed-fixing.bed granite (do not soak) firmly into the wet adhesive with a twisting motion to ensure full contact between the background, tiles and adhesive. granite should be well tapped home with a rubber mallet or the wooden handle of a trowel. ensure at least 75% of the granite back is in contact with the adhesive. installation of granite shall begin from the bottom upwards.expansion joints in the granite works are to be achieved through the use of flexible polyurethane grouting (colour to match) to be applied every 3 metres.clean off any surplus adhesive remaining on the face of the granite and between the joints with a damp sponge before the adhesive dries.for all wc area, waterproofing coating for the floor shall continue up to at least 800mm from the finished floor level.for all shower area, waterproofing coating for the floor shall continue up to at least 1500mm from the finished floor level.product available:1.“belcem” cement-based adhesive product.2.“belcem” admix 1.visit .my for further information on “belle” product.note:the contractor is to provide a manufacturers guarantee on the performance of the product.wall & floor finishes grouting surfaces to receive grouting include: granite tile installation. marble tile installation. stone tile installation. tile installation.grouting shall not be carried out until sufficient bonding has developed between the bedding mix and the tiles to preclude disturbance of the tiles during the grouting operation.grouting should therefore not be carried out for 1 3 days after completion of laying, depending on atmospheric conditions and different tiling solutions. note: tiles applied in dense substrates with very low rates of moisture absorption may require longer periods.in all areas, an epoxy grouting (colour to match) is to be applied to the tiles. movement joints in the tile are to be achieved through the use of a flexible polyurethane grouting (colour to match).after completion of grouting, the installation should not be subject to service conditions for at least 48 hours.particular care must be taken to clean the grout off the tile face before it hardens completely. this is especially important where a latex additive has been used.a sample of the tiles to be used should be tested beforehand to ensure that no grout is absorbed through the glaze, or into the tile body, causing permanent staining of the tiles.product available:1.“belcem” adhesive grout product.2.“belcem” epoxy grout product.visit .my for further information on “belle” product.note:the contractor is to provide a manufacturers guarantee on the performance of the product.impregnator applicationfloor surfaces to receive impregnator include: grouting terrazzo and pebble-wash. granite, travertine and marble limestone, sandstone, slates, terracotta, brickwork and concreteall surfaces to be applied shall be free of dirt, dust, coatings, efflorescence, grease, oil, contaminants, etc. use eliminator to remove any existing water-based waxes or finishes.surfaces shall be capable of absorbing impregnator. apply impregnator evenly onto surfaces with brush, roller or spray. if impregnator does not absorb immediately or within a few seconds, or surfaces appear oily, surfaces shall be cleaned as per manufacturers instruction.important note:contractor to apply impregnator in accordance to manufacturers instruction. remove all excess material using a clean towel, clean lambswood, cloth or lint free mop. do not allow impregnator to dry before removing excess.apply minimum 2 coats of impregnator, but allow 5-10 minutes between each application for penetration. for more absorbent surfaces, repeat the process again.perform testing on a sample tile and actual installation to determine number of coats necessary to protect particular stone, visual appearance of tile after application and stain protection against water and dirt infiltration.product available:1.stopur uv stable polyurethane coating.product bt sto sea sdn. bhd. / sto ag2.stone seal.product by perma, usa. ()note:the contractor is to provide a manufacturers guarantee on the performance of the product.墙身和地面饰面 - 花岗岩铺装 花岗岩基层包括: 水泥粉刷表面。 混凝土表面。 水泥纤维板。 原有瓷砖表面。 背板必须清洁,干燥和牢固,并在铺装前,就位至少4个星期。 应该按照制造商的说明铺装花岗岩,和按照建筑布局和/或室内设计图纸拼贴图案,或按照现场设计指示的方式铺装。 每次应该在约1平米的小范围涂抹粘结剂,以防止表面过干或避免表面不平滑,确保基层充实。 应该用扭动的方式牢固地粘贴于基层(切勿浸泡),以确保基层和粘结剂完全接触。花岗岩应该利用橡皮槌或抹子把手轻敲到位。确保至少75的花岗岩背面与胶粘剂接触。花岗岩墙面应该从底部向上铺装,地面则应按照墙体对位关系或图纸所示起铺点铺装,并每3米应该有伸缩缝,使用带伸缩性的聚氨酯勾缝剂(颜色须要匹配)。在粘结剂干透之前,应该使用湿海绵清理任何残留在花岗岩表面和接缝之间的多余粘结剂。 所有洗手间范围内,地面的防水涂料需要延续到墙面距地完成面至少800毫米的高度。 所有淋浴区范围内,地面的防水涂料需要延续到墙面距地完成面至少1500毫米的高度。 产品推荐: 1. “belcem”水泥基粘结剂。 2. “belcem”admix 1。 请到.my进一步了解关于“belle” 的产品资料。 备注:施工单位需要提供有关制造商的保证书,以保证产品的质量。 墙身和地面饰面 - 勾缝需要勾缝的地方包括: .花岗岩铺装。 .大理石铺装。 .石材铺装.瓷砖铺装。 在板材与基层之间粘接牢固之前不应该进行勾缝,以避免勾缝工作影响铺装,因此,勾缝应该在铺装1 - 3天之后进行,并根据天气条件和铺装粘结剂的不同而定。(备注:高密度基质的铺装粘结剂吸湿率非常低,可能需要较长时间才会干透。) 在所有地方,应该使用环氧勾缝剂(颜色须要匹配)。单独的伸缩缝部分,应该使用聚氨酯勾缝剂(颜色须要匹配)。勾缝工作结束后48小时以内勾缝剂尚未发挥其应有功效,应该予以保护。勾缝工作后,在勾缝剂完全变硬前必须擦去表面的多余勾缝剂,尤其在使用带乳胶添加剂的情况下。 在使用勾缝剂前,应该利用一块材料样品进行测试,以确保勾缝剂没有深入材料本身及/材料保护层内,以避免造成永久性的污染。产品推荐: 1. “belcem”聚氨酯勾缝剂。 2. “belcem”环氧勾缝剂。 请到.my进一步了解关于“belle” 的产品资料。 备注:施工单位需要提供有关制造商的保证书,以保证产品的质量。 打蜡处理打蜡处理的地方包括: .勾缝 .水磨石,卵石地铺 .花岗岩,大理石和石灰华 .石灰石,砂岩,板岩, .红陶,砖和混凝土 所有表面在打蜡处理前应该清理好污垢、灰尘、涂料、泛碱、油脂等污染物。使用清洁剂清除所有水性蜡或表面处理剂。 打蜡表面应该具有吸收蜡剂的能力。利用刷子,滚筒或喷涂手法均匀地打蜡。如果蜡剂不能在数秒钟内吸收,或表面出现油渍,表面应该按制造商的说明进行清洁。 重要提示:施工单位需要按照制造商的说明打蜡。使用干净的毛巾,干净的羊毛擦,布或不起毛的拖把去清理多余的蜡剂。切勿在蜡剂干了以后才清理多余的蜡剂。 应该最少打2层蜡,2次打蜡工作之间应该间隔5-10分钟,让蜡剂渗透。如果遇上吸收性强的表面,打蜡工作应该重复。 应在材料上进行实际的操作测试,以确定实际需要保护的涂层数,以确保打蜡处理能提供足够的防水、防尘和防污保护及视觉效果。 产品推荐: 1. stopur - uv stable polyurethane coating。 生产商: sto seas sdn. bhd. / sto.ag 2.石蜡。 生产商:perma,usa. () 备注:施工单位需要提供有关制造商的保证书,以保证产品的质量。 注意note: 施工单位必须依据生产商提供的安装说明施工。 施工单位按生产商/供应商的建议安装所有组件及配件。 图片只作为参考,不能作为实际颜色标准。 可提出同质量/外观的替代材料。并提供样板供设计单位确认。(不适用于样板间) 生产商/供应商需要按设计单位的要求提供所需样板。 the installation of this product must be carried out strictly in accordance with the manufacturers / suppliers instructions the contractor is responsible for the complete installation including all necessary fittings as recommended by the manufacturer(s). this product image is provided as a guide only and shall not be used to establish true colour representation. alternative material of equal quality and appearance may be proposed, with a sample of each, to be submitted to designer for approval. (this does not apply to the construction of a mock-up ) selected material samples from contracted suppliers are to be submitted to designer on request.page 9 of 9outline material specification (oms) 项目名称 project namefirst issuedate :首版日期revision number :修订编号revision date :修订日期1009301101229物料编码 oms no.sunny bay, hainanpark hyatt海南太阳湾-柏悦酒店fin-02(fn-05(c)description物料说明:granite sesame grey芝麻灰花岗岩finish: cleft (c) 斧劈manufacturer/supplier生产商/供应商:wi: the contractor co., ltd665 changhua roadjingan district, shanghai200041 chinat + 8621 6276 5442f + 8621 6277 1421contact person: mr. david email: project or local contractor to supply for denniston approval或施工单位需要提供所需样板供设计单位确认。补充说明 attached information:*colour may vary due to printing quality. please refer to material sample.wall & floor finishes granite installationsurfaces to receive granite include: cement plastered surfaces. concrete surfaces. cement fibreboards. existing tiled surfaces.the background must be clean, dry, firm and in position for at least 4 weeks prior to commencing of granite works.granite shall be installed in accordance to the manufacturers recommendation and in the pattern as laid out in the architectural and/or interior design drawings, or otherwise as instructed by the site architect.spread adhesive to small areas of approximately 1m at a time, to prevent surface drying or skin-over of adhesive bed. ensure solid-bed-fixing.bed granite (do not soak) firmly into the wet adhesive with a twisting motion to ensure full contact between the background, tiles and adhesive. granite should be well tapped home with a rubber mallet or the wooden handle of a trowel. ensure at least 75% of the granite back is in contact with the adhesive. installation of granite shall begin from the bottom upwards.expansion joints in the granite works are to be achieved through the use of flexible polyurethane grouting (colour to match) to be applied every 3 metres.clean off any surplus adhesive remaining on the face of the granite and between the joints with a damp sponge before the adhesive dries.for all wc area, waterproofing coating for the floor shall continue up to at least 800mm from the finished floor level.for all shower area, waterproofing coating for the floor shall continue up to at least 1500mm from the finished floor level.product available:1.“belcem” cement-based adhesive product.2.“belcem” admix 1.visit .my for further information on “belle” product.note:the contractor is to provide a manufacturers guarantee on the performance of the product.wall & floor finishes grouting surfaces to receive grouting include: granite tile installation. marble tile installation. stone tile installation. tile installation.grouting shall not be carried out until sufficient bonding has developed between the bedding mix and the tiles to preclude disturbance of the tiles during the grouting operation.grouting should therefore not be carried out for 1 3 days after completion of laying, depending on atmospheric conditions and different tiling solutions. note: tiles applied in dense substrates with very low rates of moisture absorption may require longer periods.in all areas, an epoxy grouting (colour to match) is to be applied to the tiles. movement joints in the tile are to be achieved through the use of a flexible polyurethane grouting (colour to match).after completion of grouting, the installation should not be subject to service conditions for at least 48 hours.particular care must be taken to clean the grout off the tile face before it hardens completely. this is especially important where a latex additive has been used.a sample of the tiles to be used should be tested beforehand to ensure that no grout is absorbed through the glaze, or into the tile body, causing permanent staining of the tiles.product available:1.“belcem” adhesive grout product.2.“belcem” epoxy grout product.visit .my for further information on “belle” product.note:the contractor is to provide a manufacturers guarantee on the performance of the product.impregnator applicationfloor surfaces to receive impregnator include: grouting terrazzo and pebble-wash. granite, travertine and marble limestone, sandstone, slates, terracotta, brickwork and concreteall surfaces to be applied shall be free of dirt, dust, coatings, efflorescence, grease, oil, contaminants, etc. use eliminator to remove any existing water-based waxes or finishes.surfaces shall be capable of absorbing impregnator. apply impregnator evenly onto surfaces with brush, roller or spray. if impregnator does not absorb immediately or within a few seconds, or surfaces appear oily, surfaces shall be cleaned as per manufacturers instruction.important note:contractor to apply impregnator in accordance to manufacturers instruction. remove all excess material using a clean towel, clean lambswood, cloth or lint free mop. do not allow impregnator to dry before removing excess.apply minimum 2 coats of impregnator, but allow 5-10 minutes between each application for penetration. for more absorbent surfaces, repeat the process again.perform testing on a sample tile and actual installation to determine number of coats necessary to protect particular stone, visual appearance of tile after application and stain protection against water and dirt infiltration.product available:1.stopur uv stable polyurethane coating.product bt sto sea sdn. bhd. / sto ag2.stone seal.product by perma, usa. ()note:the contractor is to provide a manufacturers guarantee on the performance of the product. 施工单位必须依据生产商提供的安装说明施工。 施工单位按生产商/供应商的建议安装所有组件及配件。 图片只作为参考,不能作为实际颜色标准。 可提出同质量/外观的替代材料。并提供样板供设计单位确认。(不适用于样板间) 生产商/供应商需要按设计单位的要求提供所需样板。 the installation of this product must be carried out strictly in accordance with the manufacturers / suppliers instructions the contractor is responsible for the complete installation including all necessary fittings as recommended by the manufacturer(s). this product image is provided as a guide only and shall not be used to establish true colour representation. alternative material of equal quality and appearance may be proposed, with a sample of each, to be submitted to designer for approval. (this does not apply to the construction of a mock-up ) selected material samples from contracted suppliers are to be submitted to designer on request.page 6 of 6outline material specification (oms) 项目名称 project namefirst issuedate :首版日期revision number :修订编号revision date :修订日期10093000物料编码 oms no.sunny bay, hainanpark hyatt海南太阳湾-柏悦酒店fin-04(ff-06(h)description物料说明:absolute black granite纯黑色花岗岩finish: honed (h) 哑光面manufacturer/supplier生产商/供应商:sunway creative stones sdn bhdlot3798 jalan 3d subang new village40150 shah alamselangor, malaysiat:+60378467662 f:+60378467708 m:+6016-3987807contact person: ms vivien seowemail: viviensmm.my or local contractor supply for denniston approval或施工单位需要提供所需样板供设计单位确认。补充说明 attached information: * the control sample is obtained from the manufacturer/ supplier mentioned above.contractor may bid out to qualified suppliers. 上述材料生产商/供应商需提供实物样板。施工单位可以分包给合适的材料供应商。dupont stonetech professional enhancer pro sealerfeatures and benefits enriches color heavy duty protection againstmost stains solvent-based, interior & exterior applicationswhere to usenatural stone such aslimestone, slate, travertine, sandstone, flagstone, tumbled stone, flamed stone & textured stone. masonry & concrete.directionsread entire label before using. use only as directed. always test in a small inconspicuous area with a 24-hour cure time to determine ease of application and desired results. allow new grout installations to cure for a minimum of 72 hours prior to application. make sure surface is clean, free of waxes, coatings, and previous sealers, and is dry for 2472 hours. surface temperature should be between 50f and 80f. ensure that the area is well-ventilated during application and until the surface is dry. keep children and pets out of the area until foot traffic resumes.1. mask off any surfaces not intended to be treated.2. liberally apply an even coat using a paint pad, roller, brush, or pump-up garden sprayer. do not use a power sprayer, towel, or sponge for application. do not thin before using. see method of application for more instructions.3. allow sealer to penetrate surface for 1520 minutes. denser material may require more time to penetrate. do not allow excess sealer to dry on surface. failure to remove excess sealer from surface may result in residue that may need to be mechanically removed.4. thoroughly wipe surface with multiple dry cloths to remove all excess sealer.5. a second coat may be needed for more absorbent surfaces. if darker appearance is required, sealer should be applied one hour after initial application, as directed in steps 24.6. full cure is achieved after 2472 hours. avoid foot traffic for 68 hours after application. if foot traffic must resume sooner, cover the floor with red rosin paper to protect it until full cure has been achieved. red rosin paper is not needed to apply second coat.7. clean equipment with mineral spirits. rags and equipment that are wet with product may be flammable. clean up promptly after job is complete. clean equipment with mineral spirits and allow to dry in a well-ventilated area. allow rags to dry in a well-ventilated area out of reach of children and pets. when dry, dispose of in accordance with local waste disposal regulations.method of application:for small jobs, use a paint pad, roller, or brush. for larger jobs, use a pump-up garden sprayer available at your local garden center, hardware store, or home improvement center. do not use a power sprayer. power sprayers create a significant amount of overspray, resulting in wasted product and the need for additional clean-up. a pump-up garden sprayer will reduce the potential for over-exposure to vapors and produce better results.ensure that the area is well-ventilated during application and until the surface is dry to the touch. keep children and pets out of the area until foot traffic resumes.available sizes (and coverage)pint: 20-55 sq. ft.quart: 40-115 sq. ft.gallon*: 150-450 sq. ft.5 gallon*: 750-2,250 sq. ft.55 gallon* : 8,250-24,750 sq. ft.expected wear: 3-5 years./stone_tech_professional/en_us/products
温馨提示:
1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
2: 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
3.本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
提示  人人文库网所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。
关于本文
本文标题:海南三亚太阳湾柏悦酒店样板房CAD图纸.rar
链接地址:https://www.renrendoc.com/p-53864343.html

官方联系方式

2:不支持迅雷下载,请使用浏览器下载   
3:不支持QQ浏览器下载,请用其他浏览器   
4:下载后的文档和图纸-无水印   
5:文档经过压缩,下载后原文更清晰   
关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

网站客服QQ:2881952447     

copyright@ 2020-2025  renrendoc.com 人人文库版权所有   联系电话:400-852-1180

备案号:蜀ICP备2022000484号-2       经营许可证: 川B2-20220663       公网安备川公网安备: 51019002004831号

本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知人人文库网,我们立即给予删除!