资源目录
压缩包内文档预览:(预览前5页/共9页)
编号:53864497
类型:共享资源
大小:76.47MB
格式:RAR
上传时间:2020-03-05
上传人:活***
认证信息
机构认证
宁夏凯米世纪网络科技有限公司
宁夏
统一社会信用代码/组织机构代码
91640100MA774ECW4K
IP属地:宁夏
12
积分
- 关 键 词:
-
海南三亚
太阳
湾柏悦
酒店
样板房
图纸
- 资源描述:
-
海南三亚太阳湾柏悦酒店样板房图纸.rar,海南三亚,太阳,湾柏悦,酒店,样板房,图纸
- 内容简介:
-
outline material specification (oms) 项目名称 project namefirst issuedate :首版日期revision number :修订编号revision date :修订日期11032500物料编码 oms no.sunny bay, hainanpark hyatt海南太阳湾-柏悦酒店fn-05(b)description物料说明:granite sesame greyfinish: bush hammered (b)thickness: 20mmjoinery: butt joint 芝麻灰花岗岩凿毛面厚度: 20mm平碰manufacturer/supplier生产商/供应商:wi: the contractor co., ltd665 changhua roadjingan district, shanghai200041 chinat + 8621 6276 5442f + 8621 6277 1421contact person: mr. david email: project or local contractor to supply for denniston approval或施工单位需要提供所需样板供设计单位确认。补充说明 attached information:*colour may vary due to printing quality. please refer to material sample.wall & floor finishes granite installationsurfaces to receive granite include: cement plastered surfaces. concrete surfaces. cement fibreboards. existing tiled surfaces.the background must be clean, dry, firm and in position for at least 4 weeks prior to commencing of granite works.granite shall be installed in accordance to the manufacturers recommendation and in the pattern as laid out in the architectural and/or interior design drawings, or otherwise as instructed by the site architect.spread adhesive to small areas of approximately 1m at a time, to prevent surface drying or skin-over of adhesive bed. ensure solid-bed-fixing.bed granite (do not soak) firmly into the wet adhesive with a twisting motion to ensure full contact between the background, tiles and adhesive. granite should be well tapped home with a rubber mallet or the wooden handle of a trowel. ensure at least 75% of the granite back is in contact with the adhesive. installation of granite shall begin from the bottom upwards.expansion joints in the granite works are to be achieved through the use of flexible polyurethane grouting (colour to match) to be applied every 3 metres.clean off any surplus adhesive remaining on the face of the granite and between the joints with a damp sponge before the adhesive dries.for all wc area, waterproofing coating for the floor shall continue up to at least 800mm from the finished floor level.for all shower area, waterproofing coating for the floor shall continue up to at least 1500mm from the finished floor level.product available:1.“belcem” cement-based adhesive product.2.“belcem” admix 1.visit .my for further information on “belle” product.note:the contractor is to provide a manufacturers guarantee on the performance of the product.wall & floor finishes grouting surfaces to receive grouting include: granite tile installation. marble tile installation. stone tile installation. tile installation.grouting shall not be carried out until sufficient bonding has developed between the bedding mix and the tiles to preclude disturbance of the tiles during the grouting operation.grouting should therefore not be carried out for 1 3 days after completion of laying, depending on atmospheric conditions and different tiling solutions. note: tiles applied in dense substrates with very low rates of moisture absorption may require longer periods.in all areas, an epoxy grouting (colour to match) is to be applied to the tiles. movement joints in the tile are to be achieved through the use of a flexible polyurethane grouting (colour to match).after completion of grouting, the installation should not be subject to service conditions for at least 48 hours.particular care must be taken to clean the grout off the tile face before it hardens completely. this is especially important where a latex additive has been used.a sample of the tiles to be used should be tested beforehand to ensure that no grout is absorbed through the glaze, or into the tile body, causing permanent staining of the tiles.product available:1.“belcem” adhesive grout product.2.“belcem” epoxy grout product.visit .my for further information on “belle” product.note:the contractor is to provide a manufacturers guarantee on the performance of the product.impregnator applicationfloor surfaces to receive impregnator include: grouting terrazzo and pebble-wash. granite, travertine and marble limestone, sandstone, slates, terracotta, brickwork and concreteall surfaces to be applied shall be free of dirt, dust, coatings, efflorescence, grease, oil, contaminants, etc. use eliminator to remove any existing water-based waxes or finishes.surfaces shall be capable of absorbing impregnator. apply impregnator evenly onto surfaces with brush, roller or spray. if impregnator does not absorb immediately or within a few seconds, or surfaces appear oily, surfaces shall be cleaned as per manufacturers instruction.important note:contractor to apply impregnator in accordance to manufacturers instruction. remove all excess material using a clean towel, clean lambswood, cloth or lint free mop. do not allow impregnator to dry before removing excess.apply minimum 2 coats of impregnator, but allow 5-10 minutes between each application for penetration. for more absorbent surfaces, repeat the process again.perform testing on a sample tile and actual installation to determine number of coats necessary to protect particular stone, visual appearance of tile after application and stain protection against water and dirt infiltration.product available:1.stopur uv stable polyurethane coating.product bt sto sea sdn. bhd. / sto ag2.stone seal.product by perma, usa. ()note:the contractor is to provide a manufacturers guarantee on the performance of the product.石材铺装石材铺装基层包括: 水泥粉刷表面。 混凝土表面。 水泥纤维板。 原有瓷砖表面。 背板必须清洁,干燥和牢固,并在铺装前,就位至少4个星期。 应该按照制造商的说明铺装石材,和按照建筑布局和/或室内设计图纸拼贴图案,或按照现场设计指示的方式铺装。 每次应该在约1平米的小范围涂抹粘结剂,以防止表面过干或避免表面不平滑,确保基层充实。 应该用扭动的方式牢固地粘贴于基层(切勿浸泡),以确保基层和粘结剂完全接触。石材应该利用橡皮槌或抹子把手轻敲到位。确保至少75的石材背面与胶粘剂接触。石材墙面应该从底部向上铺装,地面则应按照墙体对位关系或图纸所示起铺点铺装,并每3米应该有伸缩缝,使用带伸缩性的聚氨酯勾缝剂(颜色须要匹配)。在粘结剂干透之前,应该使用湿海绵清理任何残留在石材表面和接缝之间的多余粘结剂。确保石材与石材之间由2毫米留缝。 所有洗手间范围内,地面的防水涂料需要延续到墙面距地完成面至少800毫米的高度。 所有淋浴区范围内,地面的防水涂料需要延续到墙面距地完成面至少1800毫米的高度。各石材水平往地漏找坡。产品推荐: 1。 “belcem”水泥基粘结剂。 2。 “belcem”admix 1。 请到.my进一步了解关于“belle” 的产品资料。墙身和地面饰面 - 勾缝需要勾缝的地方包括: .花岗岩铺装。 .大理石铺装。 .石材铺装.瓷砖铺装。 在板材与基层之间粘接牢固之前不应该进行勾缝,以避免勾缝工作影响铺装,因此,勾缝应该在铺装1 - 3天之后进行,并根据天气条件和铺装粘结剂的不同而定。(备注:高密度基质的铺装粘结剂吸湿率非常低,可能需要较长时间才会干透。) 在所有地方,应该使用环氧勾缝剂(颜色须要匹配)。单独的伸缩缝部分,应该使用聚氨酯勾缝剂(颜色须要匹配)。勾缝工作结束后48小时以内勾缝剂尚未发挥其应有功效,应该予以保护。勾缝工作后,在勾缝剂完全变硬前必须擦去表面的多余勾缝剂,尤其在使用带乳胶添加剂的情况下。 在使用勾缝剂前,应该利用一块材料样品进行测试,以确保勾缝剂没有深入材料本身及/材料保护层内,以避免造成永久性的污染。产品推荐: 1. “belcem”聚氨酯勾缝剂。 2. “belcem”环氧勾缝剂。 请到.my进一步了解关于“belle” 的产品资料。 备注:施工单位需要提供有关制造商的保证书,以保证产品的质量。 打蜡处理打蜡处理的地方包括: .勾缝.水磨石,卵石地铺 .花岗岩,大理石和石灰华 .石灰石,砂岩,板岩, .红陶,砖和混凝土 所有表面在打蜡处理前应该清理好污垢、灰尘、涂料、泛碱、油脂等污染物。使用清洁剂清除所有水性蜡或表面处理剂。 打蜡表面应该具有吸收蜡剂的能力。利用刷子,滚筒或喷涂手法均匀地打蜡。如果蜡剂不能在数秒钟内吸收,或表面出现油渍,表面应该按制造商的说明进行清洁。 重要提示:施工单位需要按照制造商的说明打蜡。使用干净的毛巾,干净的羊毛擦,布或不起毛的拖把去清理多余的蜡剂。切勿在蜡剂干了以后才清理多余的蜡剂。 应该最少打2层蜡,2次打蜡工作之间应该间隔5-10分钟,让蜡剂渗透。如果遇上吸收性强的表面,打蜡工作应该重复。 应在材料上进行实际的操作测试,以确定实际需要保护的涂层数,以确保打蜡处理能提供足够的防水、防尘和防污保护及视觉效果。 产品推荐: 1. stopur - uv stable polyurethane coating。 生产商: sto seas sdn. bhd. / sto.ag 2.石蜡。 生产商:perma,usa. () 备注:施工单位需要提供有关制造商的保证书,以保证产品的质量。 注意note: 施工单位必须依据生产商提供的安装说明施工。 施工
- 温馨提示:
1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
2: 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
3.本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

人人文库网所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。