




已阅读5页,还剩2页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Fixed spacing: horizontal tube shall not be greater than 2 meters, the riser shall not be greater than 3 m. Less than 4 meters high, the riser can be Ann a fixed thing. Bend at the bottom of the parts should be set piers. (8) ventilation tube shall not be connected to the air duct or stack. Higher level shall not be less than 300 mm. (9) to the outdoor drainage pipe, through the wall or the infrastructure must return, application of tee and elbow connection 45 degrees, 45 degrees and should be set on the top of the vertical section to clean mouth. From indoor to outdoor check well the drainage pipe, well within the introduction of pipe should be higher than the discharge or two top tube is flat, and there are not less than 90 degrees of flow Angle, such as poor fell more than 300 mm is not restricted by Angle. (10) equipped with hidden or buried pipes, must be done before the hidden water test, the water height should be not less than the height of the underlying. 2, sanitary ware installation When installing sanitary ware (11), not because of the construction and the intensity of the structure of the building, should not be due to the use of sanitary equipment construction quality decline. (12) if some pipes must be through the structure of the column, beam and aseismic walls, and other important components, should be reserved perforation position in civil engineering design and construction phase. Decoration construction not casual knock when the chisel structures. (13) in the chisel cut operation, it is prohibited to use hammer percussion, lest cause the vibration of the whole structure caused by the separation of steel and concrete. (14) shall ensure that the horizontal and vertical installation, and grassroots anchor safe and solid. 3, lavatory installation (1) along the basin along the mouth should be placed on mesa, skull basin along the mouth should be close to the end of mesa. Mesa height in general are 800 mm. (2) the basin is made of steel mesa component bracket, detection of mesa structure before install lavatory sinks the beam height, install lavatory pelvic floor can add rubber gasket leveling, skull basin should limit fixed. (3) a joint along the lavatory and mesa, anointed with seal seam, shall not be leakage around the mouth. 4, wash basin water supply accessories installation (1) the match type faucet installation 1) long neck the faucets directly on dry feed water pipe threaded pipe fittings, ordinary faucet available external thread spools and the coupling connection. 2) single cold water faucet located in the center line of the basin wall, above the basin along the 200 mm (1000 mm) above the ground. 3) the cold, hot water tap center distance 150. Ming pipe installation, the hot water faucet is higher than the cold water tap 100 mm (1100 mm) above the ground. 4) dark pipe installation, cold and hot water faucet flush, cold water horizontal tube is 925 mm high, hot water supply high horizontal tube is 1075 mm. 5) fitted with type lavatory faucet, water tap hole using magnetic cap on the wall. (2) the match type feed Angle width of installation 1) the Angle valve installation height of 450 mm, high horizontal pipe 350 mm cold water, hot water horizontal pipe installation must be between 525 mm high diagonal vertical metope, Angle valve position and lavatory faucet hole position on a vertical line. 2) metope reserved feed pipe mouth position slightly higher deviation, Angle valve and the connection between the faucet copper tube can be bent into a curved, b word but Angle valve with metope nozzle must be positive. 3) the Angle valve with metope between nozzle connection pipe, with galvanized welded steel pipe connection, external thread on both ends of the connecting pipe, one end of the installation Angle valve, the other end of the screw thread into the wall pipe fittings. 4) use galvanized copper pipe connection, has galvanized copper tube end and Angle valve welding as a body, the other end of the feed pipe mouth flat metope place for inside and outside of inner grooved tubes or nipple, copper pipe position flax hoop (or aprons) and packing gland, and after chrome plated brass insert pipe joint, into the flax hoop, mix on gland, make the pipe gap seal, no leakage. 5) use a metal hose connection Angle valves and taps, fill in the aprons inside the lock nut, lock nut and make joint without leakage. 6) metope to take over the connection of the roots and cover with decorative cover, should be clingy metope adornment cover. (3) the match type bright piping installation 1) horizontal pipe installation height is 250 mm cold water, hot water horizontal branch height is 350 mm, the branch pipe connected to the lavatory faucet, 450 mm high cut-off valve installation. 2) bright piping required horizontal tube good levelness, connect the faucet with a vertical riser requirements for good. (4) the lavatory drainage accessories installation 1) the lavatory drain plug, the installation of trap. 2) type P trap outlet height is 400 mm, and wall body have a drain connection. 3) S type of trap outlet connected to the ground the reserved drainpipe, reserved drainpipe center is 70 mm from the wall. 4) reserved drainpipe, wall, ground is DN32 external thread tube, wall, ground 20 mm higher trap pipe inserted into the drain outlet (insert depth of about 40 mm), after the gland nut and tighten with aprons on pipes, exterior decorative cap, wall, ground. 5) under the lavatory drain plug is not install trap lavatory, drain installation. A, cross drainage tube is 450 mm high, diameter should not less than (, and should be a drain minimum slope. B, drainage tube head should install tee and plug. C, trap outlet connected to the wall, ground nozzle roots without decoration cover. D, the common lavatory trap and with the drain pipe connection, the trap outlet pipe can be directly inserted into the pipe inner 40 to 60 mm, with fine linen collar or aprons filling embedded tube gap, sealed with putty. 5, seated toilets installed (1) implement fixed 1) implement drainage reserve nozzle position deviation, implement location should be reserved a drain mouth, implement the centerline should be vertical metope, implement after find is flat, row screw hole position, fixed as stipulated in the specification. 2) implement in the mouth of the outlet and a drain connection S implement interface for the ground, the ground reserved DN100 drain mouth should be 10 mm above the ground (allowable deviation - 5 mm), drainpipe is apart from the back wall size, according to the different models of imple
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 目视化管理与产品开发考核试卷
- 锑冶炼生产数据分析与应用技巧考核试卷
- 管道工程法律法规政策深度研究与探讨考核试卷
- 铁路轨道电路调试技术考核试卷
- 航空航天器材料与工艺考核试卷
- 新生儿黄疸检测的临床意义
- 肺部真菌感染诊断与治疗进展
- 转运呼吸机操作规范
- 防呼吸道传染病科普讲座
- 视网膜动脉阻塞性疾病
- 2025年湖北省技能高考(建筑技术类)《建筑工程测量》模拟练习试题库(含答案)
- SCR脱硝催化剂体积及反应器尺寸计算表
- 光伏电站小EPC规定合同范本
- 现代艺术教育理念探析-洞察分析
- 2025年合肥市公安局第二批招考聘用警务辅助人员678人高频重点提升(共500题)附带答案详解
- 工程交验后服务措施
- 2024年重庆公务员考试试题及答案
- 小学生玩手机危害课件
- 2025年教师招聘教师资格面试逐字稿初中体育教师招聘面试《蹲踞式跳远》试讲稿(逐字稿)
- 2025年中国石油集团招聘笔试参考题库含答案解析
- 数字金融发展与跨境贸易人民币结算
评论
0/150
提交评论