文档包括:
说明书一份,21页,12500字左右。
任务书一份。
开题报告一份。
外文翻译一份。
实习报告一份。
课题申报表一份。
图纸共7张,如下所示
A0-喷淋层部装图.dwg
A0-脱硫吸收塔总装图.dwg
A0-除雾器部装图.dwg
A3-冲洗管支撑块.dwg
A3-喷淋管1.dwg
A3-喷淋管2.dwg
A4-加劲板.dwg
目 录
1 绪论 1
2 总体方案论证 2
3.脱硫塔总体设计 3
3.1 脱硫塔结构组成 4
3.2 脱硫塔主要结构参数确定 4
3.2.1 浆液高(a) 4
3.2.2烟气进口底部至浆液面距离(c) 5
3.2.3 烟气进出口高度 5
3.2.4 烟气进口中心至第二层喷浆管距离(b) 5
3.2.5 最上层喷浆管至第一段除雾器高差(d) 5
3.2.6 除雾器冲洗水喷头距除雾器间距( f ) 5
3.2.7 搅拌器设置高度(h) 5
4 喷浆部分设计 7
4.1 喷浆管的设计 7
4.2 喷头的选择 7
4.3 喷浆管的支承 8
5 除雾部分 9
5.1 除雾器 9
5.2 对除雾器的要求 9
5.3 除雾器的形式 8
6 防腐 11
7 制作 12
7.1 底板的预制 12
7.2 壁板的预制 13
7.3 顶板预制 14
7.4 构件预制 14
8 安装 15
8.1 大型机组吸收塔概况 15
8.2 安装工序 15
8.3 基础划线、底板梁及底板安装 15
8.4 吸收塔壁板及加强筋的安装 15
8.5 变径段的安装 17
结论 18
参考文献 19
致 谢 20
附 录 21
脱硫塔设计
摘 要:考虑到对煤种及锅炉负荷的适应性、运行与维修的方便性、吸收剂的廉价性和来源广范性、副产品具有的综合利用价值性 (即使抛弃搁置也无二次污染),在比较了几种不同工艺的特性以及它们中国的实际应用情况之后,本文选择了顺应吸收塔发展潮流的喷淋塔作为设计对象来实现石灰石-石膏湿法烟气脱硫。这套工艺采用了脱硫、除尘和就地强制氧化同时完成的高性能化组合塔型。设计塔内烟气的流速为3 m/s ,液气比为18 L/m3,钙硫比为1.04。喷淋塔主体、除雾器和再喷淋层依次垂直布置,这样塔的整体布局将会更加紧凑,占地面积较小。对于脱硫产物石膏,则采取了回收与抛弃兼容的处理方法。塔内脱硫工作流程为:经释热降温后的烟气自下而上的进入吸收塔的逆流段,与依靠重力降落的高密度循环喷淋液滴进行高效接触,气液两相在空间完成传质和吸收的过程。然后洁净的烟气经过除雾器的除雾和再热器的加热后从烟囱中被释放到大气当中去。吸收浆液在塔下部的氧化槽中被氧化成石膏浆液,然后进入石膏浓缩脱水系统。
关键词:湿法烟气脱硫,脱硫塔,石灰石-石膏法
Design of desulfurize tower
Abstract:Considering the adaptability to coal type and loads, the convenience of operation and maintenance, the relatively cheap and easy-obtaining absorbent,the comprehensive utilization of by-product (no secondary pollution, even abandoned gypsum), after comparing different technical process features and the application situation in China, the spray scrubber, which is the developing trend of absorption tower, is designed for CaCO3-CaCO4 wet flue gas desulfurization in this paper. The technology uses the high-performance integral spray scrubber, in which the function of desulfurization, dedusting, and forced oxidation on the spot are possessed simultaneously. The designed velocity of flue gas in countercurrent section is 3m/s. The liquid/gas ratio is 18L/m3 and Ca/S ratio is 1.04.Spray tower, mist eliminator, reheater are arranged one on top of another vertically, therefore the tower area layout of it is more compact and the occupied land area is smaller. For the desulfurization products,gypsum, the treatment of part being recovered and part being abandoned was adopt. Working principle of it is that the flue gas flows upwards into the scrubber countercurrent section after heat being released and temperature being lowered, reacts with high-density circulating slurry drops downwards fallen by gravity, gas and slurry two phases finish the process mass transferring and absorption reaction. Then the clean flue gas passed through mist eliminator and reheater, and discharges to the lower oxidation sump, and then enters gypsum concentration and dehydration system.
KEY WORDS: wet flue gas desulfurization(WFGD), desulfurize tower, limestone-gypsum technology
一、设计内容
脱硫吸收塔的整套详图设计
主要内容有:
1. 吸收塔进出口烟道以及喷淋层的详图设计
2. 吸收塔各部件的加工工艺
3. 吸收塔总体装配图的绘制
二、设计依据
1. 课题来源:江苏宇杰钢级有限公司
2. 产品名称:脱硫吸收塔
3. 部件制件:进出口烟道以及喷淋层
4. 制件材料:Q235 Q345E
5. 生产纲领:大批大量
6. 批量:本设计制造一座
7.加工内容:制作满足图纸要求的工件
三、设计要求
1.气液间扰动强烈,吸收阻力小,对SO2的吸收效率高;
2.结构简单,制造及维修方便,造价低廉,使用寿命长;
3.不结垢,不堵塞,耐磨损,耐腐蚀;
4.气液间有较大的接触面积和一定的接触时间;
5.设计图样总量:折合成A0幅面在2张以上;工具要求:应用计算机软件绘图。过
程要求:装配图需提供手工草图;
6.毕业设计说明书按照学校规定的格式规范统一编排、打印,字数不少于1万字。
7.查阅文献资料10篇以上,并有不少于3000汉字的外文资料翻译;
8.到相关单位进行毕业实习,撰写不少于3000字实习报告;
9.撰写开题报告。
四、毕业设计物化成果的具体内容及要求
1.设计成果要求
1)毕业设计说明书 1 份
2)吸收塔总装配图 1 张
3)喷淋层部装图 1 张
4)除雾部装图 1 张
5) 其他零件图 不少于7 张
2.外文资料翻译(英译中)要求
1)外文翻译材料中文字不少于3000字。
2)内容必须与毕业设计课题相关;
3)所选外文资料应是近10年的文章,并标明文章出处。






