钢雨棚施工方案- 英文_第1页
钢雨棚施工方案- 英文_第2页
钢雨棚施工方案- 英文_第3页
钢雨棚施工方案- 英文_第4页
钢雨棚施工方案- 英文_第5页
已阅读5页,还剩2页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

第 1 页 共 7 页 Bayah 1 000T D clinker production line Construction Scheme for Steel Rain proof Shelter of Non standard Fabricating Yard Sinoma Bayah Project Department November 8th 2013 第 2 页 共 7 页 Editor Auditor Approver 第 3 页 共 7 页 Construction Scheme for Steel Rain proof Shelter 1 General The rainy season lasts very long time every year in Indonesia maxim 6 months In order to ensure project quality and duration two rainproof shelters by lightweight steel structure are to be added on two non standard fabricating yards with dimension of 24 160m and 24 120m respectively 2 Installation procedure of rainproof shelter 3 Construction Preparation and Equipment Inspection Construction Preparation It is to review the construction drawings disclose technical issues and to Foundation inspection otherwise rainproof shelter cannot be started b Construction drawing and inspection procedure requirement shall be conformed in outline dimension and mutual alignment among center line elevation and anchor bolt hole c Litter and water inside the earthquake proof groove shall be cleaned up while soil around foundation shall be compacted 5 Sizing Block Iron Gasket Installation In accordance with drawing requirement between foundation pedestal and rain proof shelter landing leg shall be shimmed with 30cm bearing plate 6 Crane Selection As the steel rainproof shelter is of large span and long length and it is high latitude hoisting operation the heavy duty 100T truck crane with high performance shall be selected as hoisting tool 7 Steel Roof Girder Assembling To reduce high altitude operation procedure assure operator of safety and improve construction quality all steel roof girder and upright column will be assembled on the ground with high strength bolt to connect it together then the span to be inspected and then the safety string to be tied on the upper part of steel column The last step is integral hoisting The figure illustrates as below 第 5 页 共 7 页 As there are deviations in spans between foundation anchor bolts the bolt holes of upright columns of rainproof shelter shall be kept in proper distance during assembling Reassembling is necessary in case of relatively larger deviation Hawser cable flax rope ladder and PPE such as safety belt shall be available before hoisting of integral structure Also rigger and crane driver shall follow the instruction of hoisting controller during hoisting process so as to ensure personnel and equipment safety Hawser cable shall be immediately drawn to fasten the frame formed by girder and landing leg after hoisting is finished and the same procedure is repeated on hoisting of next span 8 The Supports between Purlins and Columns and the Installation of Drawbar After steel roof beams and upright column are finished in erection the purlins between steel roof beams and the inclined struts and drawbars between columns could be installed accordingly a Technical safety disclosure shall be once again carried out to high climbers before this process b When hoisting purlins and the supporting parts between columns specialized persons shall be assigned to hold the hawser cable preventing operators and goods encountering damages during hoisting c It is inappropriate to do installation if the wind is too strong or fast d During hoisting operation the operators shall hang his safety belt on safety life wire tightened on roof beams 第 6 页 共 7 页 9 Color Steel Tile Fabrication and Installation a Color steel tile is to be produced on site with color coated roll being pressed by color plate forming machine according to drawing requirement b Safety techniques alone shall be disclosed once again to high climbers before color steel tile and purlin installation c Two sides of steel rain proof shelter shall be vertical and hollow and vertical ladder shall be used for workers climbing up and down d Steel roof girder is sloping before purlin and color steel tile installation the safety life wire shall be drawn to hang the falling protector and the safety rope e Purlin and color steel tile builder shall step on rope ladder for movement and hang falling protector in the middle of safety life wire when working on sloping surface and shall hang the safety belt on falling protector to ensure height operation safety 10 Rope Ladder Usage a To be fixed to increase the contacting area of fixture as much as possible b To wear shoes and move slowly while climbing up and down c To stabilize the rope ladder and hold it still if it is swaying d Rope ladder shall not to be too long certain protection measure shall be taken for rope ladder exceeding 3m e To check and maintain the rope ladder regularly f To purchase the qualified rope ladder with certified brand g Not to use it during working outdoors in severe weather condition 11 Safety Attentions a Before hoisting operation Safety technical disclosure shall be held to professional rigger driver and personnel involved in hoisting operation b Antiskid soft sole shall be worn by high climbers in wet rainy days c The passageway from top down for emergency shall be available during sudden heavy rain d When fastening high strength bolt at high altitude workers shall bring small bucket to contain the sheared high strength bolt for prevention of falling objects wounding e Workers shall inspect whether safety belt falling protector and antiskid shoes are complete and proper or not before working at height 第 7 页 共 7 页 f Roof girders shall have safety life wires dividing into one longitudinal and one horizontal strip g When pulled from ground to high altitudes color steel tile shall be tied with hawser cable in preventing s

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论