




已阅读5页,还剩28页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
UMM WU AL PHOSPHATE PROJECT Beneficiation Plant Crusher an air purifier and filter for removal of oil water and any other organic matter contaminant that might be discharged from the compressor a pressure regulator with an attached gauge if the pressure in the compressor exceeds 25 psi or equivalent a pressure relief valve if the pressure regulator should fail an air line hose of not more than three hundred 300 feet 90 meters for each person hood view ports made of impact resistant safety glass or plastic covered by a metal screen gauntlet type leather gloves hard leather work shoes safety toes steel shanks recommended Adequate hearing protection devices 10 3 2 INSPECTION AND CARE OF PERSONAL PROTECTIVE EQUIPMENT PPE UMM WU AL PHOSPHATE PROJECT Beneficiation Plant Crusher Overland Conveyor Contract No 14 KB 004 13 1786 KB 034 Rev Date 06 Dec2015 Doc No MD 511 21MB CN GE MST 3001 Method statement ofpiping and non Standard e quipment sand blastingand Coating Rev No A02 Method statement ofpiping and non Standard equipment sand blastingand Coatin g HQC6 s scope of Package Doc No MD 511 21MB CN GE MST 3001 Page26of33 Interiors of masks shall be cleaned daily If a mask is worn by other than one person the mask will be sterilized All valves and regulators must be checked before each use The condensate valve at the bottom of the purifier should be opened daily to remove excess water 10 3 3 AIR SUPPLY BLASTING EQUIPMENT The airline hose will be a non electrical conductor Hose lengths will be joined by metal couplings secured to the outside of the hose to avoid erosion and weakening of the couplings Nozzles will be attached to the hose by fittings that will prevent the nozzle from becoming disengaged Dead man controls will be provided at the nozzle and on the hose Cable at least one fourth 1 4 inch 6 millimetres in diameter or safety chains will be provided for and used on each hose connection to prevent the hose from whipping or thrashing around in case a coupling becomes disconnected Sand blasting areas will be barricaded with Sandblasting Area Keep Out signs UMM WU AL PHOSPHATE PROJECT Beneficiation Plant Crusher Overland Conveyor Contract No 14 KB 004 13 1786 KB 034 Rev Date 06 Dec2015 Doc No MD 511 21MB CN GE MST 3001 Method statement ofpiping and non Standard e quipment sand blastingand Coating Rev No A02 Method statement ofpiping and non Standard equipment sand blastingand Coatin g HQC6 s scope of Package Doc No MD 511 21MB CN GE MST 3001 Page27of33 Before each job check hose to hose connections hose to nozzle connections and hose to mixing chamber NOTENOTE Review Material Safety Data Sheets MSDS for hazards associated with the blasting material being used 10 4 PAINTING 10 4 1 STORAGE OF PAINT MATERIALS Store flammable liquid in a secure well ventilated area away from heat flames and hot work areas Provide warning signboard such as No Smoking and MSDS in place Materials that have exceeded the coating manufacturer s recommended shelf life shall not be used The coating manufacturer s recommended pot life shall not be exceeded When this limit is reached the spray pot shall be emptied and cleaned and new material shall be mixed 10 4 2 PAINT MIXING Control the source of ignition sources in the paint mixing UMM WU AL PHOSPHATE PROJECT Beneficiation Plant Crusher Overland Conveyor Contract No 14 KB 004 13 1786 KB 034 Rev Date 06 Dec2015 Doc No MD 511 21MB CN GE MST 3001 Method statement ofpiping and non Standard e quipment sand blastingand Coating Rev No A02 Method statement ofpiping and non Standard equipment sand blastingand Coatin g HQC6 s scope of Package Doc No MD 511 21MB CN GE MST 3001 Page28of33 Prevent contact of paint and solvents with eyes and skin All waste paint cleaning solvents etc must be properly disposed of at an approved disposal area Personnel involve shall wear respirator type mask or cartridge type 10 4 3 PAINTING WORK Control the source of ignition sources in the paint mixing Prevent contact of paint and solvents with eyes and skin All waste paint cleaning solvents etc must be properly disposed of at an approved disposal area Personnel involve shall wear respirator type mask or cartridge type Paint on work at height shall have safe working platform and wear full body harness 11 JOB SAFETY ANALYSIS See the attachment Attached table UMM WU AL PHOSPHATE PROJECT Beneficiation Plant Crusher Overland Conveyor Contract No 14 KB 004 13 1786 KB 034 Rev Date 06 Dec2015 Doc No MD 511 21MB CN GE MST 3001 Method statement ofpiping and non Standard e quipment sand blastingand Coating Rev No A02 Method statement ofpiping and non Standard equipment sand blastingand Coatin g HQC6 s scope of Package Doc No MD 511 21MB CN GE MST 3001 Page29of33 PipePipe TopTop ColorColor ofof PackagePackage 3A3A MARK NoNo FluidFluid ServicServic e e CodeCode FluidFluid ServiceService DeDe scriptionscription PipingPiping L L ineine ClasClas s s PipingPiping MatMat erialerial categorcategor y y BackgroundBackground ColorColor 1APC Phosphoric Acid Concentrated AG16 GRP Vinyl ester DNA Phosphate Rock S lurry Coarse Unground AA20 CS Abrasio n Resistan t D Safety Orange R AL 2004 2APS Phosphate Rock S lurry Finely gr ound Froth Wast e AA05CS D Safety Orange R AL 2004 3ATAAtmospheric AirAA03CSD Safety Blue RAL 5017 4BSLBrine SolutionAG13 GRP Epoxy DNA 5COL Collector Fatty Acid AA02CSD Safety Orange R AL 2004 6COMCollector AmineAA02CSD Safety Orange R AL 2004 7CPLSoda AshAA02CSD Safety Orange R UMM WU AL PHOSPHATE PROJECT Beneficiation Plant Crusher Overland Conveyor Contract No 14 KB 004 13 1786 KB 034 Rev Date 06 Dec2015 Doc No MD 511 21MB CN GE MST 3001 Method statement ofpiping and non Standard e quipment sand blastingand Coating Rev No A02 Method statement ofpiping and non Standard equipment sand blastingand Coatin g HQC6 s scope of Package Doc No MD 511 21MB CN GE MST 3001 Page30of33 AL 2004 8CWR Cooling Water Re turn AA02CSD Safety Green RAL 6024 9CWS Cooling Water Re turn AA02CSD Safety Green RAL 6024 10FLTFlocculantAP11SS 304L DNA AP10SS 304L DNA 11IASInstrument Air BQ02 SS 316 31 6L DNA 12PASPlant AirAZ02 CS Galvan ized DNA 13SNSSanitary SewerAT10CPVCDNA 14VACVaccumAQ15SS 316L DNA 15WDSRO PermeateWaterAG13 GRP Epoxy DNA AG15 GRP Epoxy DNA AZ01 CS Galvani zed D Safety Red RAL 3 020 16WFF Water Fire Figh ting AA22CSD Safety Red RAL 3 UMM WU AL PHOSPHATE PROJECT Beneficiation Plant Crusher Overland Conveyor Contract No 14 KB 004 13 1786 KB 034 Rev Date 06 Dec2015 Doc No MD 511 21MB CN GE MST 3001 Method statement ofpiping and non Standard e quipment sand blastingand Coating Rev No A02 Method statement ofpiping and non Standard equipment sand blastingand Coatin g HQC6 s scope of Package Doc No MD 511 21MB CN GE MST 3001 Page31of33 020 AG14 GRP Epoxy DNA 17WPDPotable Water AP12SS 304L DNA 18WPRProcess Water AG13 GRP Epox y DNA AG13 GRP Epoxy DNA 19WRSRaw Water AA02CSD Safety Green RAL 6024 AA02CS A G D Safety Green RAL 6024 20WRW Recirculating Wa ter AG13 GRP Epoxy U G DNA 21WSWSeal WaterAQ15SS 316L DNA 22TSS Combined fine ta iling and slime CR09 CS HDPE Li ned D Safety White RAL 9016 23 Piping suppor t Safety Gray RAL 7040 UMM WU AL PHOSPHATE PROJECT Beneficiation Plant Crusher Overland Conveyor Contract No 14 KB 004 13 1786 KB 034 Rev Date 06 Dec2015 Doc No MD 511 21MB CN GE MST 3001 Method statement ofpiping and non Standard e quipment sand blastingand Coating Rev No A02 Method statement ofpiping and non Sta
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年摩科瑞油码头工程融资投资立项项目可行性研究报告(咨询)
- 2025年螺杆真空泵项目可行性研究报告申请报告
- 皮革化学品项目立项可行性报告
- 2025年中国危化品项目投资计划书
- 2025年中国碳粉项目创业投资方案
- 中国二氧化钛陶瓷膜项目经营分析报告
- 2025年中国铜铟镓硒薄膜太阳能电池项目创业计划书
- 2025年外汇、黄金等交易服务项目可行性研究报告
- 2025年长沙食品包装容器项目可行性研究报告模板范文
- 中国纺织工业用酶项目经营分析报告
- 2025年共青团入团积极分子结业考试题库及答案
- 2025年绩效管理自考试题和答案
- GB 16663-2025醇基液体燃料
- 高三试卷:山东省名校考试联盟2024-2025学年高三上学期期中考试化学+答案
- 广东上进联考2025-2026学年领航高中联盟2026届高三10月一轮复习阶段检测化学(含答案)
- 2024年全国统计师之初级统计基础理论及相关知识考试快速提分卷(附答案)
- 土地法律知识培训内容课件
- 2025年湖北省荆门市辅警考试题库(附答案)
- 2025西南证券股份有限公司校园招聘300人笔试历年参考题库附带答案详解
- 气象科研课题申报书
- 新视野第三版第一册unit2
评论
0/150
提交评论