heterosexual异性的(heterosexual性别的)_第1页
heterosexual异性的(heterosexual性别的)_第2页
heterosexual异性的(heterosexual性别的)_第3页
heterosexual异性的(heterosexual性别的)_第4页
全文预览已结束

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

shape novel and unique 5 The window set window sill line that outside signs noodles 945 aluminum metal alloy windows adopts the whole piece of flower Gang stone creation each Piece adoption top and bottom 6 piece for each stainless steel hang a piece to fix All lines Dou capes put together to answer aluminum metal alloy window four peripheries The frame beats gum even and full 6 Outside sign noodles about 30 000 ms 2 of flower Gang stone the cent piece is bigger attain whole outside wall noodles color Is even consistent construction difficulty more big at under construction adopted to press the color bad the way for choosing connect color The near flower Gang stone puts together and puts on big noodles while installing The color that is under construction to pass a plank material is bad of to Ratio and carry on to the plank material of serial number combination availably avoided the creation of the wall noodles hair flower phenomenon have already promised The whole adornment effect of the outside wall noodles 7 Outside wall plank the material and lines style all Be put kind by computer put solid kind on the scene through design set up 71 Establish the superintendency approve rear quasi incise The fire burns plank horizontal sew the Shu sew all for the 8 mms the pillar dubs out plank and lines For actually sew gearing Joint neat degree and perpendicular degree of strict control plank material while installing attain a plank material to connect Sewing is straight and even the blind side is even The whole wall noodles after completing work in response to surface neat consistent color and luster the lines is clear to flow Chang put together to sew tidy beauty whole high perpendicular degree deviation control at 6 mms Seven Install an engineering construction organization design draw up alone 72 Six the construction start construction with the electricity organization design A Engineering general situation Mansion in administration center in Yungkang City that will soon build always constructs the area 37570 ms 2 the building covers area for 6424 ms 2 is all frame structure the lord building is a 9 F four vice buildings with connect a gallery connect with each other are 4 F perspectively Because this engineering each building area is bigger the work expects to be tight again so the devotion of personnel machine equipments is also Is more use electricity s measuring more big tallest measure for the 537 52 kws with the electric capacity use electric capacity on the average of quantity for 231 133 kws Is detailed to see construction machine equipment plan reckon a construction transformer to choose from here 600 kvas A set of capacity Two The spot water electric wire road flat surface sets out It is detailed to see attach diagram Three Go together with to give or get an electric shock system decoration and operation Start The decoration is apart from 100 ms 30 ms 3 0 ms Figure 6 1 go together with to give or get an electric shock a system decoration and hold a request The substation outputs the low pressure The substation outputs the low pressure The substation outputs the low pressure The substation outputs the low pressure The substation outputs the low pressure 73 Four Relevant rules that uses to give or get an electric shock a safe technique at the time 1 Draw up a basis The JGJ46 88 starts construction to use to give or get an electric shock a safe technical specification at the time on the scene 2 Need to be changed to start construction with the electricity at the time organization design contents have to from electrical engineering technique person The member draws up the technique representative director examines is granted rear to carry out by supervisor section and add concerning the diagram paper Data backup 3 The establishment uses to give or get an electric shock a safe technique file at the time its contents BE Organize a design with the electricity construction at the time The modification organizes to design data with the electricity construction at the time The technique hands over bottom data Use electrician the distance check acceptance form at the time The electricity equipments tries examination certificate with adjust to try a record Connect a ground of electric resistance measurement record The periodical check reply checks form The construction is on the scene monthly once grass roots company every quarter once and reexamine Connect a ground of electric resistance value The electrician maintains a work record Can specify a specially assigned electrician management and in dismantle with electrician s distance at the time In addition to unify to return back to file behind 4 Construction scaffold mobile driveway rise heavy the safety of equipments and dispatches from foreign news agency circuit request to see form 6 1 74 Table 6 1 construction scaffold mobile driveway rise heavy equipments and dispatches from foreign news agency circuit of safety request Dispatches from foreign news agency circuit Electric voltage Scaffold edge and electricity The of empty circuit edge is most The small safety is apart from Construction the spot mobile driveway Hand over with dispatches from foreign news agency ray road Fork minimum perpendicular distance Tower s mourning any part is mourned Thing edge and dispatches from foreign news agency build on stilts Circuit side line s minimum level Be apart from Open to dig a non thermodynamic energy tube on the scene Ditch groove ed

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论