已阅读5页,还剩20页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1/5/2018 2:53 AM,John H. Hook - Phone: (813) 928-1440 - Email: ,Page: 1 of 25,Resume of:,Objective: My objective is to assist organizations with technical writing, website development, ISO 9000, training and/or various engineering challenges.,1/5/2018 2:53 AM,John H. Hook - Phone: (813) 928-1440 - Email: ,Page: 1 of 25,John H. Hook,Contact Info: 7028 West Waters Avenue, Ste. 101, Tampa, FL 33634Telephone: (813) 928-1440 Email: ,1/5/2018 2:53 AM,John H. Hook - Phone: (813) 928-1440 - Email: ,Page: 2 of 25,PERSONAL INFORMATION,Technical Writer/Editor - Website Developer - ISO 9000 Specialist - Engineer - Trainer and AuthorHTML Writers Guild - Macintosh and Windows DeskTop Publishing (DTP) Systems, Owner-OperatorSenior Member: Instrument Society of America (ISA), ISA General Board of ReviewISA Scientific Instrumentation & Research Division, ISA Aerospace Industries DivisionMember: American Institute of Aeronautics and Astronautics (AIAA)Author of: Conversion Factors for Scientists, Engineers and Students (Prentice-Hall),1/5/2018 2:53 AM,John H. Hook - Phone: (813) 928-1440 - Email: ,Page: 3 of 25,SUMMARY,Experience includes over twenty-five years in R computer hardware and software, Computer Aided Design (CAD), and board work, integrated circuit, discrete component, electric, electronic, mechanical, pneumatic, and hydraulic components, interfaces, standards, and systems. Knowledge of ANS, ANSI, ASME, ASTM, DOD, DOE, FDA, GMP, HTML, IEEE, INPO, ISA, ISO 9000, MIL, NQA-1, NRC and SEI requirements, etc. Experienced technical writer/editor, website developer, ISO 9000 specialist, engineer, trainer, and author. Nuclear, integrated circuit (IC) wafer manufacturing, aerospace, pharmaceutical, R&D, refinery, utility, educational institution, commercial and industrial positions worked on both contract and direct basis. Specialized in short to medium-term projects.,1/5/2018 2:53 AM,John H. Hook - Phone: (813) 928-1440 - Email: ,Page: 4 of 25,ABILITIES,Ability to supervise personnel and get along very well with others, even in difficult situationsAbility to operate a wide variety of computer platforms using a broad spectrum of softwareAbility to successfully design, produce and control various types of documentation and systemsAbility to draw on vast experiences to produce cost-effective, quality solutions to client needs,1/5/2018 2:53 AM,John H. Hook - Phone: (813) 928-1440 - Email: ,Page: 5 of 25,ACHIEVEMENTS,Worked various positions with some of the most prestigious organizations in the countryDOE Conduct of Operations (CONOPS) Outstanding National Achievement AwardDOE Significant Achievement Award for work on Annunciator Response Procedures (ARPs)Author of: Conversion Factors for Scientists, Engineers and Students (Prentice-Hall),1/5/2018 2:53 AM,John H. Hook - Phone: (813) 928-1440 - Email: ,Page: 6 of 25,Work History,The projects Ive worked, my titles and tasks are chronologically ordered and will appear following this slide. Enjoy, and please feel free to contact me to discuss your needs and opportunities.Thank you,John Hook,1/5/2018 2:53 AM,John H. Hook - Phone: (813) 928-1440 - Email: ,Page: 7 of 25,PROJECT: Bayer Pharmaceuticals Fractionation Products Facility, Facility Engineering Standards Policy and Program Plan, Clayton, NC (09/00 - 12/00)TITLE:SENIOR TECHNICAL WRITING CONSULTANTTASK:Determined the requirements for, designed, tested and implemented the Facility Engineering Standards Policy and Program Plan. Determined the appropriate basis standards and wrote and/or edited standards and procedures to implement the program plan. Consulted with executive and senior management as needed to develop and implement the program plan, including the logistic and operational infrastructure.,1/5/2018 2:53 AM,John H. Hook - Phone: (813) 928-1440 - Email: ,Page: 8 of 25,PROJECT: City, County and State Department of Public Safety, Combined Emergency Operations Center, Austin, TX (05/00 - 8/00)TITLE:SYSTEMS INTEGRATION ENGINEERTASK:Developed and maintained the program level master plan and schedule. Developed and implemented the program level document management plan including the support infrastructure. Developed and implemented the program level risk management plan including the support infrastructure. Assisted in the development of the emergency operations center layout with city, county and state management personnel and the architect. Advised client on infrastructure design, network architecture and planning.,1/5/2018 2:53 AM,John H. Hook - Phone: (813) 928-1440 - Email: ,Page: 9 of 25,PROJECT: Customer Service Website - United States Automobile Association (USAA) (Insurance Company), San Antonio, TX (06/99 - 10/99)TITLE:SENIOR TECHNICAL WRITER (WEB DEVELOPER)TASK:Developed customer service internet website e-commerce materials and templates. Produced research materials for software coding standards and wrote said standards to meet the homogenized client, American National Standards Institute (ANSI), Institute of Electrical and Electronics Engineers (IEEE), International Standards Organization (ISO), and Software Engineering Institute (SEI), Capability Maturity Model (CMM) Level II software requirements. Developed customer service, release two user guides, etc., for use by approximately 40 infrastructure and software developers and software test personnel on the intranet website. Advised client on infrastructure design and planning.,1/5/2018 2:53 AM,John H. Hook - Phone: (813) 928-1440 - Email: ,Page: 10 of 25,PROJECT: Baxter Healthcare Renal Products (Medical Devices), Largo, FL (10/97 - 09/98)TITLE:SENIOR ENGINEER AND TECHNICAL WRITERTASK:Engineered the Research and Development (R&D) department documentation system to support (and minimize audit findings) the Design History File (DHF) in preparation for the 510(k) Submission to the FDA. Participated in the R&D of medical devices from the perspective of Food and Drug Administration (FDA) compliance requirements. Advised client management on a daily basis. Developed various systems and supporting documentation including the Project Plan (PP), Product Launch Plan (PLP), Product Requirements Document (PRD), Software Requirements Specification (SRS), Hardware Requirements Specification (HRS), and Materials Specifications (MS), etc.,1/5/2018 2:53 AM,John H. Hook - Phone: (813) 928-1440 - Email: ,Page: 11 of 25,PROJECT: Semitool Corporation, Kalispell, MT (04/97 - 08/97)TITLE:SENIOR TECHNICAL WRITERTASK:Researched task and job skill requirements for the removal, repair and/or replacement of components in integrated circuit (IC) manufacturing equipment. Developed procedures for the repair and replacement of components. Field validated procedures.PROJECT: Department of Energy (DOE), Fluor-Daniel Corporation, Tank Farm Operations, Hanford Nuclear Energy Reservation, Hanford, WA (11/96 - 02/97)TITLE:SENIOR TECHNICAL WRITERTASK:Reviewed Tank Farm operating procedures for accuracy, usability and compliance with Basis for Interim Operation (BIO) requirements and incorporated appropriate changes.,1/5/2018 2:53 AM,John H. Hook - Phone: (813) 928-1440 - Email: ,Page: 12 of 25,PROJECT: UnoVen Refinery, Babcock and Wilcox, Lamont, IL (09/96 - 11/96)TITLE:TRAINING MATERIALS DEVELOPER (TECH WRITER)TASK:Researched work and job skill requirements for unionized workers and developed materials for the production of Task Qualification Cards (TQCs). Wrote various TQCs.PROJECT:Entergy Integrated Solutions Inc., Memphis, TN (01/96 - 07/96)TITLE:CONSULTANT AND SENIOR TECHNICAL WRITERTASK:Wrote process documentation and presentation materials for deregulated activities. Advised client on the ISO 9000 certification process and acquired appropriate software.,1/5/2018 2:53 AM,John H. Hook - Phone: (813) 928-1440 - Email: ,Page: 13 of 25,PROJECT: Department of Energy (DOE), Kaiser Engineers Hanford/ Westinghouse, Operations Engineering, Hanford Nuclear Energy Reservation, Hanford, WA (03/94 - 05/95)TITLE:SENIOR TECHNICAL WRITER (Conduct of Operations (CONOPS) Consultant)TASK:Wrote Annunciator Response, Emergency Operating, Environmental Monitoring and Normal Operating Procedures (ARPs, EOPs, EMPs and NOPs), per DOE Order 5480.19, CONOPS Reqts for DOE Facilities.PROJECT:Bussman ISO 9000 Certification Project, Ballwin, MO (10/93 - 12/93)TITLE:ISO 9000 PROCEDURE WRITERTASK:Reviewed ISO 9000 certification plans, policies and procedures. Wrote procedures per ISO 9000 certification reqts for manufacturing, customer services and delivery.,1/5/2018 2:53 AM,John H. Hook - Phone: (813) 928-1440 - Email: ,Page: 14 of 25,PROJECT: DOE, (MK-Ferguson Co.), Weldon Springs Site Remedial Action Project (WSSRAP, an EPA and CERCLA Superfund Site) St. Charles, MO (01/93 - 08/93)TITLE:SENIOR TECHNICAL WRITER (CONOPS Consultant)TASK:Wrote wastewater plant NOPs and ARPs per DOE Order 5480.19, CONOPS Requirements for DOE Facilities. Wrote Lockout/Tagout Lesson Plans.PROJECT:DOE, Pinellas Plant (General Electric/Martin-Marietta), Largo, FL (07/90 - 01/93)TITLE:SENIOR TECHNICAL WRITER (CONOPS Consultant)TASK:Developed the NOP format. Wrote procedures per DOE Order 5480.19, CONOPS Reqts for DOE Facilities. CONOPS Outstanding National Achievement Award. Developed the PMI format per DOE Order 4330.4A, Conduct of Maintenance.,1/5/2018 2:53 AM,John H. Hook - Phone: (813) 928-1440 - Email: ,Page: 15 of 25,PROJECT: DOE, Westinghouse Savannah River Plant (SRP), Aiken, SC (03/90 - 07/90)TITLE:SENIOR PROCEDURE WRITERTASK:Wrote I&C PM, calibration and functional testing procedures for components, loops, and systems, to satisfy safety program efforts. Produced loop diagrams and drawings.PROJECT:Comanche Peak Nuclear Power Station, Glenrose, TX (10/89 - 12/89)TITLE:INSTRUMENTATION AND CONTROL (I&C) SYSTEM ENGINEERTASK:Performed I&C system scaling calculations including, process variables, process control signals, instrument data, head/tail corrections and error value methodologies, etc.,1/5/2018 2:53 AM,John H. Hook - Phone: (813) 928-1440 - Email: ,Page: 16 of 25,PROJECT: Nine Mile Point Nuclear Station, Lycoming, NY (03/89 - 10/89)TITLE 2:BALANCE OF PLANT (BOP) I&C COORDINATORTASK 2:Scheduled and tracked calibrations and frequencies. Calculated & assigned setpoints.TITLE 1:IN-SERVICE-INSPECTION (ISI) ENGINEERTASK 1:Reviewed ISI data for final acceptance and return-to-service. Validated ISI results.PROJECT:DOE, SRP, K Reactor Restart, Aiken, SC (11/88 - 12/88)TITLE:RESTART ENGINEERTASK:Wrote procedures to support DOE requirements for the inception of a new position: Area Representative (AR). The AR has overall responsibility for reactor area activities.,1/5/2018 2:53 AM,John H. Hook - Phone: (813) 928-1440 - Email: ,Page: 17 of 25,PROJECT: PROJECTDOE, E.I. duPont, SRP, Aiken, SC (06/88 - 11/88)TITLE:TECHNICAL WRITERTASK:Wrote administrative, calibration and maintenance procedures for Measurement and Test Equipment (M&TE) and process instruments. Made walkdowns with procedures.PROJECT:Baxter Healthcare, Marion, NC (02/88 - 05/88)TITLE:TECHNICAL WRITERTASK:Wrote sequence and theory of operation manuals for various equipment and processes. Helped develop a Total Productive Maintenance (TPM) program. Made presentations.,1/5/2018 2:53 AM,John H. Hook - Phone: (813) 928-1440 - Email: ,Page: 18 of 25,PROJECT: RJR Mechanical Inc., Spartanburg, SC (11/87 - 02/88)TITLE:CONTROL SYSTEM ENGINEERTASK:Specified, designed and started-up industrial processes I&C systems. Specified, purchased and started-up CAD system. Negotiated with clients and contractors.PROJECT:Strandberg Engineering, Taylors, SC (8/87 - 11/87)TITLE:FIELD SERVICE ENGINEERTASK:Installed, calibrated, and maintained textile industry equipment, at all client facilities.PROJECT:Fluor-Daniel Intl, Greenville, SC (05/87 - 08/87)TITLE:SENIOR TECHNICAL WRITERTASK:Developed Training The Instructor materials. Developed various system manuals.,1/5/2018 2:53 AM,John H. Hook - Phone: (813) 928-1440 - Email: ,Page: 19 of 25,PROJECT: Mallinckrodt Pharmaceuticals, Raleigh, NC (01/87 - 04/87)TITLE:TECHNOLOGISTTASK:Developed Computerized Instrument Maintenance System (CIMS), (FDA validation).PROJECT:Pigeon Point Power, New Castle, DE (08/86 - 11/86)TITLE:I&C STARTUP ENGINEERTASK:Responsible for I&C systems startup including the Distributive Control System (DCS).PROJECT:Comanche Peak Nuclear, Glenrose, TX (06/86 - 08/86)TITLE:DESIGN VERIFICATION ENGINEERTASK:Checked drawings against actual As-Built configurations to verify design compliance.,1/5/2018 2:53 AM,John H. Hook - Phone: (813) 928-1440 - Email: ,Page: 20 of 25,PROJECT: Instrument Society of America (ISA), International Training Facility, Raleigh, NC (03/86 - 04/86)TITLE:LABORATORY ASSISTANT/INSTRUCTORTASK:Helped present Process Instrumentation Theory, Operation, and Maintenance course.PROJECT:United States Steel Corp., Gary, IN (12/85 - 02/86)TITLE:PROJECT ENGINEERTASK:Developed Computerized Instrument Maintenance System (CIMS), (process systems).PROJECT:Arnold Air Force Station, Missile and Rocket Testing Facility, Tullahoma, TN (03/85 - 09/85)TITLE:TECHNICAL WRITER/EDITOR (PROCEDURE REVIEW)TASK:Developed I&C procedures for various testing facilities.,1/5/2018 2:53 AM,John H. Hook - Phone: (813) 928-1440 - Email: ,Page: 21 of 25,PROJECT: PROJECTD.C. Cook Nuclear, Bridgeman, MI (12/84 - 02/85)TITLE:LEAD I&C ENGINEERTASK:Directed contractors. Performed a ten-year review and update of I&C procedures.PROJECT:Shearon Harris Nuclear, New Hill, NC (08/84 - 11/84)TITLE:TECHNICAL WRITERTASK:Wrote I&C procedures for Safety Related and other systems in support of plant startup.PROJECT:Clinton Nuclear, Clinton, IL (06/84 - 08/84)TITLE:ASSO. I&C ENGINEER/STARTUP TEST ENGINEERTASK:Wrote I&C procedures for FSAR, Tech. Spec. and Setpoint Document requirements.,1/5/2018 2:53 AM,John H. Hook - Phone: (813) 928-1440 - Email: ,Page: 22 of 25,PROJECT: Waterford III Nuclear, Taft, LA (07/83 - 03/84)TITLE:TECHNICAL WRITERTASK:Wrote I&C procedures f
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 熟食店卫生检查记录表
- 地铁车厢火灾应急演练脚本
- 剧毒品管理制度
- 特种设备维护保养检查记录表(泄压装置)
- 消毒产品卫生制度
- 中医时辰养生指导规范
- 工程项目极端天气应急预案
- 消毒产品卫生安全备案管理
- 科技创新成果转化与知识产权保护制度
- 物流行业运输安全监控制度
- 北京市人民大附属中学2026届中考数学全真模拟试卷含解析
- 浙江省湖州、衢州、丽水三地市2026届高三下学期4月二模数学试题 含答案
- 2026中国宠物冻干零食行业市场发展趋势与前景展望战略研究报告
- 2026中煤锡林郭勒芒来发电有限公司第一批招聘23人笔试参考题库及答案解析
- 2026校招:陕西投资集团笔试题及答案
- 2024-2025学年河南省南阳市高一下学期期中考试生物试卷(解析版)
- 雨课堂学堂在线学堂云民族学导论专题中央民族大学单元测试考核答案
- 2025年洗衣师技能理论考试题(附答案)
- 淘宝客服合同协议书
- 2025年深圳市网格员笔试试题及答案解析
- 2024-2025学年宁夏银川市唐徕中学南校区九年级下学期期中考试历史试卷
评论
0/150
提交评论