




已阅读5页,还剩10页未读, 继续免费阅读
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
Hong Kong Airlines Limited香港航空03110-01Hong Kong Airlines MEDHong Kong Airlines LimitedWO NO/工作指令号SEQ NO/序列号WOHA331146_322_4DIC 11464TitleImprovement of A330 Feeder Routing Attachment in wing/pylonMcd&Rev/厂家工卡&修订日期标题改进A330大翼/吊架馈电线路径的连接A/C/飞机号/组别EO JC No./EO工卡EO JC Rev/工卡版本Workarea/工作区域Skill/工种Man Hour/工时BLNV/1EOA33-92-0017R01电气/ElectricEINP12:00Baseline/依据Operator EO/营运人EOEO Rev/EO版本Work Type/工作类别Threshold/首检Interval/重复检SB A330-92-3132R01EOA33-HKG92-0011R01Written/编写Reviewed/审核Approved/批准2015-06-302015-07-012015-07-01Accomplished完工签署Complete Date完工日期Station维修站PVGREASON & DESCRIPTION/原因及描述由于振动,左右大翼内侧吊架后面的导线绝缘套管7701 VB和7702 VB的安装支架出现裂纹和固定的金属卡箍丢失,导致绝缘套管受磨损。本改装是安装一个新的接地金属支架,在左右大翼每一内侧吊架后面的第一个接合点上使用加强型的卡箍和夹带代替现有的部件。执行完成该EO可以改进大翼/吊架区域的线路安装, 防止线缆磨损、短路和系统损坏。下发此EO进行改装。The G-route wiring looms 7701VB and 7702VB are fixed with plastic brackets and metallic clamps at the first attachment point in the wing after each pylon in the LH and RH wings. Due to vibration, cracks have been found to occur in the bracket and the metallic strap has been found to be missing. This can cause chafing of the wiring loom on the aircraft structure.This modification installs a new metallic bracket with electrical bonding, reinforced clamp and strap to replace the existing parts at the first attachment point in the wing after each inboard pylon in the LH and RH wings.Accomplishment of this EO will improve the wiring installation in the wing/pylon area to prevent chafing, possible short circuits and damage to systems.Issued this EO to be modified.R01 增加支架安装孔视情处理等步骤,更正Figure A-GBAAA等。R01 add work steps to rework the holes in bracket, correct Figure A-GBAAA.TOOLS/工具TOOLS NECESSARY/必须工具ITEM项目P/N件号DESCRIPTION名称EQTP类型QTY数量APP适用性Conditions note互换信息及备注TOOLS IF NECESSARY/视情工具ITEM项目P/N件号DESCRIPTION名称EQTP类型QTY数量APP适用性Conditions note互换信息及备注PARTS AND MATERIAL/航材NOTE:OPERATOR MUST GET AND INSTALL THE PARTS THAT CORRESPOND TO THE RELATIVE WORKORDER NO.注释:请工作者严格按照工作指令号领取预定的航材装机PARTS AND MATERIAL NECESSARY/必须航材ITEM项目P/N件号DESCRIPTION名称EQTP类型QTY数量APP适用性Conditions note互换信息及备注1CML19-003CLEANING ABSORCH1ALL按需2CML11-016CLEANING SOLVENTCH1ALL按需/08BPA13CML09-007BRUSHABLE FUEL RESISTANT COATINGCH1ALL按需4CML07-001BELECTRICAL BOND VARNISHCH1ALL按需5923132D01R01KITAS1ALLN/APARTS AND MATERIALIF NECESSARY/视情航材ITEM项目P/N件号DESCRIPTION名称EQTP类型QTY数量APP适用性Conditions note互换信息及备注IMPORTANT NOTE:In the event of any discrepancies between the Chinese instruction and the English instruction, the English procedure should prevail.Record Additional Work/Findings(If Applicable) Reference No. Certificate of Release to Service (* Tick as appropriate # Different crews should perform the work on each of the systems)Certifies that the work specified, except as otherwise specified, was carried out in accordance with HKAR-145and in respect to that work, The aircraft / aircraft components are considered ready for Release to Service. HKA Approval No: AI / 135 / 706 * HNAT Approval No.: JMM 076, D3039 * HNAT Approval No.: JMM 047, D101115* HNAT Approval No.: JMM 049, D500023 * CASL Approval No: AI / 101 / 798 * TAECO Approval No.: DAI / 89 / 1295 * HAECO Approval No: DAI / 1 / 853 * SIAEC Approval No: AWI / 01 * STARCO Approval No.: JMM 039, D.200078 * SMECO Approval No: JMM 081, D.400009 * AMECO Approval No.: JMM001,D101131* Other: * Signature:_ Authorization No.:_ Date:_工卡Job card:EOA33-92-0017TITLEImprovement of A330 Feeder Routing Attachment in wing/pylonPerfInsp标题改进A330大翼/吊架馈电线路径的连接工作者检查者警 告:确保遵守相关手册中所有的警告和注意事项。WARNING: MAKE SURE THAT YOU OBEY ALL THE WARNINGS AND ALL THE CAUTIONS INCLUDED IN THE REFERENCED PROCEDURES.注 意: 始终遵守以下防护措施以保持导线处于良好状态(电气和机械可用)。当执行维护、修理、改装等工作时,始终保持导线、部件和工作区域尽可能的清洁。执行以下工作:- 按需在导线和部件上放置保护物如塑料片、布等。- 定期将金属碎屑、不需要的材料和其他污染物清除干净。执行这些防护措施可以减少电气线路布局和安装被污染和损坏的风险。如果发现污染,参考ESPM 20-55-00处理。CAUTION: ALWAYS OBEY THE PRECAUTIONS THAT FOLLOW TO KEEP ELECTRICAL WIRING IN A SATISFACTORY CONDITION (ELECTRICALLY AND MECHANICALLY SERVICEABLE). WHEN YOU DO MAINTENANCE WORK, REPAIRS OR MODIFICATIONS, ALWAYS KEEP ELECTRICAL WIRING, COMPONENTS AND THE WORK AREA AS CLEAN AS POSSIBLE. TO DO THIS:- PUT PROTECTION, SUCH AS PLASTIC SHEETING, CLOTHS, ETC; AS NECESSARY ON WIRING AND COMPONENTS.- REGULARLY REMOVE ALL SHAVINGS, UNWANTED MATERIAL AND OTHER CONTAMINATION.THESE PRECAUTIONS WILL DECREASE THE RISK OF CONTAMINATION AND DAMAGE TO THE ELECTRICAL WIRING INSTALLATION. IF THERE IS CONTAMINATION, REFER TO ESPM 20-55-00.A. 概述/ GENERAL(1) 标准施工/ Standard Practices(a) 对于隔框识别,参考AMM 06-31-53, Page Block 001。For the Frame (FR) identification, refer to AMM 06-31-53, Page Block 001.(b) 对于区域识别,参考AMM 06-20-00, Page Block 001。For the identification of zones, refer to AMM 06-20-00, Page Block 001.(c) 对于接近盖板识别,参考AMM 06-41-53, Page Block 001。For the identification of access panels, refer to AMM 06-41-53, Page Block 001.(d) 紧固件的拆装,参照SRM 51-42-00。Remove and install fasteners in accordance with SRM 51-42-00.(e) 对于标准螺纹紧固件的紧固力矩,参考AMM Task 20-21-11-911-801。To torque tighten the standard threaded fasteners, refer to AMM Task 20-21-11-911-801. (f) 如果必须使用备用和替代紧固件,参照SRM 51-40-00“配装件”列表,必须确保相关螺帽/垫片的兼容性。If alternative and substitute fasteners have to be used, you must make sure that the associated nut/collar are compatible in accordance with SRM 51-40-00 “Mating Part” column.(g) 如果在本SB中指定任何紧固件的长度不符合SRM 51章给出的安装标准,那么可以使用SRM 51章中给出长度符合安装标准的相同规格的紧固件或一个批准的替代品。另外,垫片安装可以参照SRM51章紧固件的紧固长度。If the length of any fastener specified in this Service Bulletin does not meet installation standards given in SRM Chapter 51, then a fastener of the same specification, or an approved substitute, with a length which meets the installation standards given in SRM Chapter 51 may be used. In addition, washers may be installed for fastener grip length in accordance with SRM Chapter 51.(h) 对于普通线束的安装,参考ESPM 20-33-00。For the general installation of electrical harnesses, refer to ESPM 20-33-00.(i) 对于电气连接,参考ESPM 20-51-20和AMM Task20-28-00-912-802。For the electrical bonding, refer to ESPM 20-51-20 and AMM Task20-28-00-912-802.(j) 对于标牌的安装,参考AMM 11-00-00, Page Block 201。For the installation of placards, refer to AMM 11-00-00, Page Block 201.(k) 按照SRM 51-21-00进行防护处理。 Apply protective treatment in accordance with SRM 51-21-00.(l) 按照SRM 51-23-11进行漆层处理。 Apply paint coatings in accordance with SRM 51-23-11.(m) 按照SRM 51-44-00进行紧固件开孔、钻孔和去毛刺处理。 Obtain fastener hole diameters and drill and de-burr data in accordance with SRM 51-44-00.B. 准备/ PREPARATION(1)准备工作/Job Set-up 备注:在此备注中给出的项目为执行维护工作时需确保的基本飞机构型:NOTE: The items given in this note shall be considered as the basic Aircraft configuration beforeyou start a maintenance task: - 飞机在地面没有顶升(插好起落架安全销并挡好轮挡)。Aircraft on the ground resting on landing gear (the ground safety locks and the wheel chocks are in position on the landing gear).- 发动机已关车,反推收上并锁好。Engine shut down, thrust reversers closed and locked.- 飞机外表干净、清洁。Aircraft in clean configuration.- 停留刹车已设置。Parking brake applied.- 飞机已整机断电。Aircraft electrical network de-energized.- 液压系统已释压。Hydraulic systems depressurized.- 可以接近驾驶舱和客舱。Access to the cockpit and cabin is available.- 所有跳开关处于闭合状态。All circuit breakers are in closed position.- 所有控制处于正常、自动或关闭位。 All controls in NORM, AUTO or OFF position.(a) 确保飞机接地,参考AMM Task 12-34-24-860-802。Make sure that the aircraft is electrically grounded, refer to AMM Task 12-34-24-860-802.(b) 接近左大翼:To get access for the LH Wing:1 参考AMM Task 57-41-37-000-801和AMM Task 57-42-37-000-801拆下前缘固定接近盖板522AB和522BB。Remove the fixed leading edge access panels 522AB and 522BB, refer to AMM Task 57-41-37-000-801 and AMM Task 57-42-37-000-801.2 参考AMM Task 54-52-11-000-809拆下吊架接近盖板452CL和452CR。Remove the pylon access panels 452CL and 452CR, refer to AMM Task 54-52-11-000-809.(c) 接近右大翼:To get access for the RH Wing:1 参考AMM Task 57-41-37-000-801 and AMM Task 57-42-37-000-801拆下固定前缘接近盖板622AB和622BB。Remove the fixed leading edge access panels 622AB and 622BB, refer to AMM Task 57-41-37-000-801 and AMM Task 57-42-37-000-801.2 参考AMM Task 54-52-11-000-809拆下吊架接近盖板462CL和462CR。Remove the pylon access panels 462CL and 462CR, refer to AMM Task 54-52-11-000-809.C. 步骤/PROCEDURE(1)改装左侧7701VB G路径的电缆绝缘套管支撑托架。 Modify the Cable Loom Support Bracket of the G-route 7701VB LH. (a) 在左大翼吊架后部的连接点,从导线绝缘套管7701VB拆下支撑托架,项目(7),参考Fig. A-GBAAA Sheet 01,图示C:At the attachment point in the LH wing after the pylon, remove the support bracket from the wiring loom 7701VB, Item (7), refer to Fig. A-GBAAA Sheet 01, View C: QTY 数量DESCRIPTION名称P/N件号ITEM项目NOTE备注2NutMS21042L3Item (1)报废/Discard2ScrewNAS1096-3-8Item (5)报废/Dicard4WasherNAS1149D0316HItem (2)报废/Discard1BracketABS0679-01Item (3)报废/Discard1ClampASNA0033-060Item (4)报废/Discard1Tie-CableNSA935401-03Item (11)报废/Discard2SupportABS0678B01Item (6)报废/Discard 备注:Item (6)是拆除两部分 NOTE: Item (6) is removed as 2 parts. (b) 参考Fig. A-GBAAA Sheet 01,图示D,在左大翼吊架后部的支架连接点,用化工品清洁表面连接结合点。At the bracket attachment point in the LH wing after the pylon, clean the bonding point contact surface, refer to Fig. A-GBAAA Sheet 01, View D, with: DESCRIPTION名称P/N件号QTY数量LINT-FREE COTTON CLOTHCML19-003As requiredNon Aqueous Cleaner Non Structural UseCML11-016As required (c) 如果有需要,按照SRM 51-44-00和参考Fig. A-GBAAA Sheet 01和Fig. A-GBAAA Sheet 02的View D, View E, View F 修改支架上的孔。 If necessary, rework the holes in the bracket, Item 3 in accordance with SRM 51-44-00 and refer to Fig. A-GBAAA Sheet 01 and Fig. A-GBAAA Sheet 02, View D, View E and View F. 注 释:如果孔进行了修改,按需进行防护处理。 NOTE: If holes are reworked apply protective treatment as necessary.(d) 参考Fig. A-GBAAA Sheet 01和Fig. A-GBAAA Sheet 02的View D, View E, View F,安装新的电缆绝缘套管支撑托架和紧固件:Install the new cable loom support bracket and fasteners, refer to Fig. A-GBAAA Sheet 01, and Fig. A-GBAAA Sheet 02, View D, View E and View F:QTY数量DESCRIPTION名称P/N件号ITEM项目1BracketF9249296220000Item 32ScrewNAS1801-3-12Item 54WasherNAS1149D0363HItem 22NutMS21042L3Item 1 注 释:Item 3的支架安装在线路内侧,参考Appendix 02 - Post SB Installation Details。NOTE: The bracket, Item 3, is installed inside the wing, refer to Appendix 02 - Post SB Installation Details .(e) 涂上一层:Apply a layer of:DESCRIPTION名称P/N件号QTY数量BRUSHABLE FUEL RESISTANT COATINGCML09-007As requiredELECTRICAL BONDING LACQUERCML07-001BAs required 按照ESPM 20-51-22和参考AMM Task20-28-00-912-802,在螺帽上,Item 1。over the nut, Item 1, in accordance with ESPM 20-51-22 and refer to AMM Task20-28-00-912-802. (f) 参考ESPM 20-33-11和Fig. A-GBAAA Sheet 01,图示D,安装:Install, refer to ESPM 20-33-11 and Fig. A-GBAAA Sheet 01, View D:DESCRIPTION名称P/N件号ITEM项目0.289GrommetNSA939510CNItem 8 (g) 参考ESPM 20-33-11、ESPM 20-33-41和Fig. A-GBAAA Sheet 01,图示D,安装导线绝缘套管7701VB, Item (7),在:Install the wiring loom 7701VB, Item (7), refer to ESPM 20-33-11, ESPM 20-33-41 and Fig. A-GBAAA Sheet 01, View D, on:QTY数量DESCRIPTION名称P/N件号ITEM项目1SupportABS0678B02Item 6 用易拉得将E-路径电缆 Item (10) 附到支架 Item 6 上: Attach the E-route cables, Item (10), to the support, Item 6, with:QTY数量DESCRIPTION名称P/N件号ITEM项目1Tie-CableNSA935401-03Item 11 在新的托架 Item 3 上,安装: On the new bracket, Item 3, install:QTY数量DESCRIPTION名称P/N件号ITEM项目1ClampASNA0032-060Item 4 (h) 参考AMM 11-00-00, Page Block 001和Fig. A-GBAAA Sheet 01,图示D,安装标牌:Install, refer to AMM 11-00-00, Page Block 001 and Fig. A-GBAAA Sheet 01, View D:QTY数量DESCRIPTION名称P/N件号ITEM项目1PlacardF9239026810000Item 9 (2) 改装右侧7702VB G路径的电缆绝缘套管支撑托架。 Modify the Cable Loom Support Bracket of the G-route 7702VB RH. (a) 在右大翼吊架后部的连接点,从导线绝缘套管7702VB拆下支撑托架,Item (7),参考Fig. A-GBAAA Sheet 01,图示C:At the attachment point in the RH wing after the pylon, remove the support bracket from the wiring loom 7702VB, Item (7), refer to Fig. A-GBAAA Sheet 01, View C:QTY 数量DESCRIPTION名称P/N件号ITEM项目NOTE备注2NutMS21042L3Item (1)报废/Discard2ScrewNAS1096-3-8Item (5)报废/Discard4WasherNAS1149D0316HItem (2)报废/Discard1BracketABS0679-01Item (3)报废/Discard1ClampASNA0033-060Item (4)报废/Discard1Tie-CableNSA935401-03Item (11)报废/Discard2SupportABS0678B01Item (6)报废/Discard 备注:Item (6)是拆除两部分。 NOTE: Item (6) is removed as 2 parts. (b) 参考Fig. A-GBAAA Sheet 01,图示D,在右大翼吊架后部的支架连接点,用化工品清洁表面连接结合点。At the bracket attachment point in the RH wing after the pylon, clean the bonding point contact surface, refer to Fig. A-GBAAA Sheet 01, View D, with: DESCRIPTION名称P/N件号QTY数量LINT-FREE COTTON CLOTHCML19-003As requiredNon Aqueous Cleaner Non Structural UseCML11-016As required (c) 如果有需要,按照SRM 51-44-00和参考Fig. A-GBAAA Sheet 01和Fig. A-GBAAA Sheet 02的View D, View E, 修改支架上的孔。 If necessary, rework the holes in the bracket, Item 3 in accordance with SRM 51-44-00 and refer to Fig. A-GBAAA Sheet 01 and Fig. A-GBAAA Sheet 02, View D and View E.注 释:如果孔进行了修改,按需进行防护处理。 NOTE: If holes are reworked apply protective treatment as necessary.(d) 参考Fig. A-GBAAASheet 01和Fig. A-GBAAA Sheet 02的View D, View E, View F,安装新的电缆绝缘套管支撑托架和紧固件:Install the new cable loom support bracket and fasteners, refer to Fig. A-GBAAASheet 01, and Fig. A-GBAAA Sheet 02, View D, View E and View F:QTY数量DESCRIPTION名称P/N件号ITEM项目1BracketF9249296220000Item 32ScrewNAS1801-3-12Item 54WasherNAS1149D0363HItem 22NutMS21042L3Item 1 注 释:Item 3的支架安装在线路内侧,参考Appendix 02 - Post SB Installation Details。NOTE: The bracket, Item 3, is installed inside the wing, refer to Appendix 02 - Post SB Installation Details .(e) 涂上一层:Apply a layer of: DESCRIPTION名称P/N件号QTY数量BRUSHABLE FUEL RESISTANT COATINGCML09-007As requiredELECTRICAL BONDING LACQUERCML07-001BAs required按照ESPM 20-51-22和参考AMM Task20-28-00-912-802,在螺帽上,Item 1。 over the nut, Item 1, in accordance with ESPM 20-51-22 and refer to AMM Task 20-28-00-912-802. (f) 参考Fig. A-GBAAA Sheet 01,图示D,安装:Install, refer to Fig. A-GBAAA Sheet 01, View D: DESCRIPTION名称P/N件号ITEM项目0.289 GrommetNSA939510CNItem 8 参考ESPM 20-33-11。 Refer to ESPM 20-33-11. (g) 参考ESPM 20-33-11, ESPM 20-33-41 和 Fig. A-GBAAA Sheet 01, 图示D,安装导线绝缘套管7702VB, Item (7),在:Install the wiring loom 7702VB, Item (7), refer to ESPM 20-33-11, ESPM 20-33-41 and Fig. A-GBAAA Sheet 01, View D, on: QTY数量DESCRIPTION名称P/N件号ITEM项目1SupportABS0678B02Item 6 用易拉得将E-路径电缆 Item (10) 附到支架Item 6上: Attach
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 浙江长征职业技术学院《事故调查处理与事故分析》2023-2024学年第二学期期末试卷
- 黄山职业技术学院《动画表演与运动规律》2023-2024学年第二学期期末试卷
- 阜阳幼儿师范高等专科学校《工程经济与可行性分析》2023-2024学年第二学期期末试卷
- 漳州科技职业学院《高级会计》2023-2024学年第二学期期末试卷
- XX横向课题研究与成果转化
- 新疆司法警官职业学院《智能时代下的创新创业实践》2023-2024学年第二学期期末试卷
- 邯郸应用技术职业学院《儿童文学选》2023-2024学年第二学期期末试卷
- 广东工商职业技术大学《地理学与生活》2023-2024学年第二学期期末试卷
- 自我介绍大班课件
- 西宁城市职业技术学院《中医经典金匮要略》2023-2024学年第二学期期末试卷
- 景区保洁服务方案
- JJF 2109-2024标准物质定值技术要求有机同位素稀释质谱法
- 强基计划个人陈述范文南京大学
- 国家讲解员培训课件
- 滴滴出行营销策略分析报告总结
- 死因监测工作规范
- 国际贸易风险管理与进出口业务培训资料
- 数独4宫练习题(全)
- 14000t级散货船船体生产设计报告书船舶
- 【基于价值链的企业成本管理分析国内外文献综述4100字】
- 我问你答问题100个三年级
评论
0/150
提交评论