英文版.doc

【机械类毕业论文中英文对照文献翻译】PLC安装须知【word英文2378字5页word中文翻译1789字7页】

收藏

压缩包内文档预览:
预览图 预览图 预览图 预览图 预览图 预览图 预览图
编号:77686757    类型:共享资源    大小:29.76KB    格式:RAR    上传时间:2020-05-07 上传人:柒哥 IP属地:湖南
6
积分
关 键 词:
机械类毕业论文中英文对照文献翻译 word英文2378字5页,word中文翻译1789字7页 机械类 毕业论文 中英文 对照 文献 翻译 PLC 安装 须知 word 英文 2378 中文翻译 1789
资源描述:
【机械类毕业论文中英文对照文献翻译】PLC安装须知【word英文2378字5页word中文翻译1789字7页】,机械类毕业论文中英文对照文献翻译,word英文2378字5页,word中文翻译1789字7页,机械类,毕业论文,中英文,对照,文献,翻译,PLC,安装,须知,word,英文,2378,中文翻译,1789
内容简介:
外文资料翻译The PLC gearing beard knowsOne prefaceThe programmable controller(PLC) is a kind of new in general use automation control to equip, it traditional of melt after the electric appliances control technique,the calculator technique and the communication techniqueHave the control function for the integral whole strong, can*sex is high, using vivid convenience, being easy to expand etc. advantage but apply more and more extensively.But while use because the industry livingProduce the work environment of the spot bad, the interference source is numerous, using an electricity an equipments to start or stopping the motion of cause the charged barbed wire net electric voltage formation low frequency interference such as the big power, electric weldingThe machine,the electricity spark processes the electricity of the tool machine,electrical engineering brush etc. passes the electromagnetism match the output work interference etc., would influence a PLC normal work.Though the PLC is the control that uses exclusively and on the spot to equip, having already adopted much measure while design manufacturing, making it compare an orientation to the industrial environment, but for the sake of indeedProtect the whole system stability can*, still should make the PLC have a good work environment condition as far as possible, and adopt the anti- interference measure of the necessity.2 PLC while installing with the maintenance should notice of problem2.1 PLC gearingThe PLC is applicable to mostly industrial spot, but it still has a certain request to the usage situation,the environment temperature.etc.Control a PLC work environment, can raise availablyIts work efficiency and the life span.Avert from while install PLC following place:(1) The environment temperature more than 050 scope of the s;(2) Relative humidity more than 85% exists dew to coagulate perhaps;(from what the temperature mutation or other factors cause)(3) The sun light projects light upon directly;(4) Decay and combustible air, for example hydrogen chloride,hydrogen sulfide.etc.;(5) Conjectured the iron scraps and dust;(6) Multifarious or continuous vibration, the vibration frequency is a 1055 Hzs,range is a 0.5 mms();(7) Over the impact with 10 gs(the gravity acceleration).All have already installed bore on 4 Capes of the small scaled and programmable controller outer shell.There are two kinds of gearing methods, one is fix with the bolt, the different unit has a different gearing Chinese foot Inch;Another a kind of is the DIN(German republican standard) orbit to fix.The gearing clipboard of the DIN orbit kit usage, or so one rightness for each.On the orbit pack first very or so Clipboard, pack up the PLC, then tight bolt.For the sake of making the control system work can*, usually install programmable controller in have the control cabinet of protect the outer shell, with Keep dust,greasy dirt,water from splash.For promising programmable controller Be work the appearance descend its temperature to keep in the provision the environment temperature scope, install the machine should have foot Sufficient well ventilated space, the basic unit has to have the 30 mms above partition with expanding of the unit.If the surroundings environment over 55 Cs, install electric fan, force airiness.The electricity interference of the other peripherals in order not to, the programmable controller should keep off the high voltage line and the high pressure equipments, programmable controller and the high pressure equipmentses possibly with Of the power cable distance that should stay at least a 200 mms.When the programmable controller perpendicularity install, take strict precautions against to lead line head,the iron scraps.etc. to drop to go into programmable controller inner part from the well ventilated window, make PC board short-circuit, make it Cant work normally to even damage permanently.2.2 The power supply connects line The PLC power supply power supply is a 50 Hzs,the 220 V is 10% alternate currents.The FX series the programmable controller have the direct current 24 V exportation to connect line to carry.Should connect line to carry can spread feeling(if the light electricity switch or near to a switch) to provide the direct current 24 V power supply for the importation.If the power supply occurrence break down, break off time little in 10 mses, PLC work uninfluenced.If the power supply break off to descend to exceed to allow a value over the 10 mses or the power supply, the PLC then stops Work, all exportations order all to break to open in the meantime.When the power supply recover, if the RUN importation connect, then operating an au to carry on.Interference come to the power cable, the PLC has to boycott an ability enough.If the power supply interference is specially serious, can install 1 change to compare to 1:1 of the insulation change to press Machine with reduce the interference of of the equipments and ground.2.3 Connect ground Connecting ground goodly is to promise PLC can*the important condition of the work, can avoid the electric voltage of the accidental occurrence pounding at bane.Connect a ground of line and machine connects ground to carry to connect, basic The unit connects ground.If want to use to expand unit, its connecting a location should connect a location with basic unit to connect together.For repressing to impose the power supply and importation to carry,output something to carry Interference, should mount the appropriation ground line for programmable controller, connect the location should connect a location with the motive equipments(such as electrical engineering) to separate.If could not reach this kind of request, also necessarily The beard attain is public with other equipmentses to connect ground, forbid to establish with other equipmentses to connect ground.Connect the location should possibly*near PLC.2.4 The direct current 24 Vs connects line to carryWhen usage had no importation spare part that the source touches to order, the PLC internal 24 V power supply passes the electric current that the importation spare part carries to provide to order a 7 mAs each time toward the importation.The PLC 24 Vs connects line to carry son, can also outwardly the department spread the feeling machine(if near to the switch or the light electricity switch) to provide electric current.When 24 Vs carried son to make to spread the feeling machine power supply, the COM carry Son is the direct current 24 V ground carry.If the adoption expands seaman, then should basic unit with expand the 24 Vs of the unit to carry to link.Moreover, any exterior power supply cant connect Arrive this carries son.If took place to carry phenomenon, the electric voltage will drop into automatically, that importation has no effect to the programmable controller.Each the importation amount of point of PLC of model number is to have provision of.Order to each importation that havent yet use, it doesnt consume an electricity, so in this kind of case, the 24 V power supply carry Son outwardly the power supply flow of the ability can increase.The empty of the FX series PLC carries son, cant use under all circumstances.2.5 The importation connects lineThe PLC accepts a route of travel switch generally,the limit switch etc. the switch of the importation quantity signal.Importations connecting line to carry son is the port that the PLC and exterior spread the feeling machine load conversion signal.Lose Go in to connect line, general the exterior spread the feeling machine and input a port to connect line.Input the spare part can be any NPN tube that have no source to touch to order or gather electrode to open a new road.Input When the spare part connect, input to carry to connect, input circuit to shut to match, input in the meantimeThe give out light of designation diode is bright.An electric circuit that the importation carry with of two electric circuits, the adoption light electricity matches insulation.Two electric circuits take the RC filter, in order to prevent touch to order to tremble to move because of the importation or from the importationThe circuit string the electricity voice for go into cause PLC mistake action.If Be inputting to touch some electric circuit to establish diode, should be small at establishing the electric voltage of the diode in the 4 Vs.If use to take the tongue switch of give out light the diode, establish diode Number cant more than twos. Moreover, importations connecting line should also notice specially the following what time:(1) The importation connects line and want generally over the 30 ms.But if the environment interference is smaller, when the electric voltage doesnt greatly decline, the importation connects line appropriate grow some.(2) Importation,output line and cant use the same root of electric cable, input,output line to want separate.(3) The width of the pulse signal that the programmable controller can accept, should be big in scan time of the period.2.6 The exportation connects line(1) The programmable controller outputted after the electric appliances,the tube output,the transistor output 3 kinds of forms.(2) The exportation carries to connect line to is divided into independence to output with the public exportation.When the PLC exportation acts after the electric appliances or the tube, same two exportations of number carry to connect.At Can adopt the exportation electric voltage of different type and the electric voltage grade in the different set.But can use same type at same exportation in the set,same power supply of electric voltage grade.(3) Because the PLC exportation component is seal to pack in printing to make circuit board, and links to carry the son plank, if output conjunction the load short circuit of the component, will destroy by fire to print to make Circuit board, therefore apply the fuse protection to output a component.(4) Adoption after When the electric appliances output, bear of the electricity sensitive faculty load the size influence to after th
温馨提示:
1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
2: 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
3.本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
提示  人人文库网所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。
关于本文
本文标题:【机械类毕业论文中英文对照文献翻译】PLC安装须知【word英文2378字5页word中文翻译1789字7页】
链接地址:https://www.renrendoc.com/p-77686757.html

官方联系方式

2:不支持迅雷下载,请使用浏览器下载   
3:不支持QQ浏览器下载,请用其他浏览器   
4:下载后的文档和图纸-无水印   
5:文档经过压缩,下载后原文更清晰   
关于我们 - 网站声明 - 网站地图 - 资源地图 - 友情链接 - 网站客服 - 联系我们

网站客服QQ:2881952447     

copyright@ 2020-2025  renrendoc.com 人人文库版权所有   联系电话:400-852-1180

备案号:蜀ICP备2022000484号-2       经营许可证: 川B2-20220663       公网安备川公网安备: 51019002004831号

本站为文档C2C交易模式,即用户上传的文档直接被用户下载,本站只是中间服务平台,本站所有文档下载所得的收益归上传人(含作者)所有。人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对上载内容本身不做任何修改或编辑。若文档所含内容侵犯了您的版权或隐私,请立即通知人人文库网,我们立即给予删除!