全文预览已结束
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
2019年6月大学英语四级阅读练习题:核能发电的发展 2019年6月大学英语四级阅读200篇汇总 英语四级阅读练习题:核能发电的发展 In the early days of nuclear power, the United States make money on it. But today opponents (反对者 ) have so complicated its development that no nuclear plants have been ordered or built here in 12 years. The greatest fear of nuclear power opponents has always been a reactor meltdown. Today, the chances of a meltdown that would threaten U. S. public health are very little. But to even further reduce the possibility, engineers are testing new reactors that rely not on human judgment to shut them down but on the laws of nature. Now General Electric is already building two advanced reactors in Japan. But dont expect them even on U. S. shores unless things change in Washington. The procedure for licensing nuclear power plants is a bad dream. Any time during, or even after, construction, an objection by any group or individual can bring everything to a halt while the matter is investigated or taken to court. Meanwhile, the builder must add nice-but-not-necessary improvements, some of which force him to knock down walls and start over. In every case when a plant has been opposed, the Nuclear Regulation Commission has ultimately granted a license to construct or operate. But the victory often costs so much that the utility ends up abandoning the plant anyway. A case in point is the Shoreham plant on New Yorks Long Island. Shoreham was a virtual twin to the Millstone plant in Connecticut, both ordered in the mid-60s. Millstone, completed for $ 101 million, has been generating electricity for two decades. Shoreham, however, was singled out by antinuclear activists who, by sending in endless protests, drove the cost over $ 5 billion and delayed its use for many years. Shoreham finally won its operation license. But the plant has never produced a watt power. Governor Mario Cuomo, an opponent of a Shoreham start up, used his power to force New Yorks public-utilities commission to accept the following settlement: the power company could pass the cost of Shoreham along to its consumers only if it agreed not to operate the plant. Ioday, a perfectly good facility, capable of servicing hundreds of thousands of homes, sits rusting. 21.The authors attitude toward the development of nuclear power is_. A. negative B. neutral C. positive D. questioning 22.What has made the procedure for licensing nuclear power plants a bad dream? A. The inefficiency of the Nuclear Regulation Commission. B. The enormous cost of construction and operation. C. The length of time it takes to make investigations. D. The objection of the opponents of nuclear power. 23.It can be inferred from Paragraph 2 that_. A. there are not enough safety measures in the U. S. for running new nuclear power plants B. it is not technical difficulties that prevent the building of nuclear power plants in the U. S. C. there are already more nuclear power plants than necessary in the U. S. D. the American government will not allow Japanese nuclear reactors to be installed in the U. S. 24. Governor Mario Cuomos chief intention in proposing the settlement was to_. A. stop the Shoreham plant from going into operation B. urge the power company to further increase its power supply C. permit the Shoreham plant to operate under certain conditions D. help the
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年考研计算机专业人工智能练习(含答案)
- 专升本会计学专业2025年财务报表分析试卷(含答案)
- 2025年高中一年级政治上学期测试分析试卷
- 2025年前期投资分析师招聘面试参考题库及答案
- 2025年运动项目经理招聘面试题库及参考答案
- 消防值班员考试题库及答案
- 曹县医院招聘试题题库及答案
- 2025年渠道销售专员招聘面试题库及参考答案
- 2025年清洁工招聘面试参考题库及答案
- 铁路竞聘笔试题库及答案
- 财务监管协议书范本
- 辽宁机场集团招聘笔试真题2024
- 人教版高中物理精讲精练-必修1专题强化一:受力分析和整体法与隔离法专题 (原卷版)
- GB/T 12643-2025机器人词汇
- 《认知行为疗法》课件
- 15个小测试-测测您家孩子注意力是否达标
- 《阴极保护原理》课件
- 西南大学《模拟电路》2023-2024学年第一学期期末试卷
- 边缘计算与云计算
- 汉语拼音默写表及拼读专练
- 风电项目审批、开发、建设、运营所需手续全流程
评论
0/150
提交评论