版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、1,Module und Variations_E,Modules and variations New graphics guidelinesDesign proposalsRoland Berger Hamburg, November 2001,2,Module und Variations_E,ContentsPage,A.Standard slides3 B.Lists (1) Factors, no specific number7 C.Lists (2) Factors, specific number13 D.Matrix Factors, comparisons24 E.Pro
2、cess (1) Factors, steps35 F.Process (2) Factors, impact49 G.Process (3) Factors, interlinked67 Annex: Nine key changes compared to the old standards73,3,Module und Variations_E,A. Standard slides,4,Module und Variations_E,Methodological competence,Key projects,Industry competence,Professional experi
3、ence,Languages,Education,Consultant profile: first name, last name,xxxx-xxxx,xxxxxxxxxxxxxxxxxxxxxxxxxxx,Position: xxxxxxxxxxxxxxxxxxxxxxxx,German xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx,xxxx-xxxx,xxxxxxxxxxxxxxxxxxxxxxxxxxx,Born: xxxx,xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx,xxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
4、xxxxxxx,xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx,Nationality: xxxxxxxxxxxxxxxxxxxxx,Updated: mm/year,5,Module und Variations_E,Organizational chart,6,Module und Variations_E,Organizational chart (including headcount,7,Module und Variations_E,B. Lists (1) Factors, no specific number,8,Module und Variati
5、ons_E,Lists horizontal (variations,Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,Heading,Details,1,2,3,4,9,Module und Variations_E,Lists vertical (variations,1,2,3,4,10,M
6、odule und Variations_E,Schedule,1,2,3,4,5,6,7,8,9,10,11,12,Month 1,Month 2,Month 3,Activities,A,B,C,1,2,3,4,5,6,7,8,9,10,11,12,Month 1,Month 2,Month 3,Activities,A,B,C,1,2,11,Module und Variations_E,Sets of guidelines,2,3,4,5,Guidelines 1,Guidelines 2,Guidelines 3,Guidelines 4,Guidelines 5,Comments
7、1,Comments 2,Comments 3,Comments 4,Comments 5,1,12,Module und Variations_E,13,Module und Variations_E,C.Lists (2) Factors, specific number,14,Module und Variations_E,Pyramid (3 or 4 levels,15,Module und Variations_E,Pyramid (5 levels/centered,16,Module und Variations_E,3 factors (interwoven,1,2,3,17
8、,Module und Variations_E,Common ground,18,Module und Variations_E,4 factors (1,19,Module und Variations_E,4 factors (2,20,Module und Variations_E,4 factors (3,1,2,3,4,Factor 1,Factor 2,Factor 3,Factor 4,21,Module und Variations_E,4 factors (3a weighted,2,3,4,Factor 1,Factor 2,Factor 3,Factor 4,22,Mo
9、dule und Variations_E,4 factors (3b dynamic,1,2,3,4,Factor 1,Factor 2,Factor 3,Factor 4,Four dynamic factors,23,Module und Variations_E,6 factors (variation,24,Module und Variations_E,D.Matrix Factors, comparisons,25,Module und Variations_E,Matrix/table (Horizontal/vertical comparison of data variat
10、ions,1,2,3,4,26,Module und Variations_E,Special types of matrix opportunities/threats,Opportunities,Threats,Opportunities,Threats,Opportunities,Threats,Opportunities,Threats,1,2,3,4,27,Module und Variations_E,Special types of matrix pros and cons,1,2,3,28,Module und Variations_E,Special types of mat
11、rix controversy,1,2,3,4,29,Module und Variations_E,Special types of matrix conflict/tension (1,30,Module und Variations_E,Special types of matrix conflict/tension (2,31,Module und Variations_E,Special types of matrix bottom up/top down (1,BOTTOM UP,TOP DOWN,32,Module und Variations_E,Special types o
12、f matrix bottom up/top down (2,BOTTOM,UP,TOP,DOWN,1,2,33,Module und Variations_E,Special types of matrix equilibrium,34,Module und Variations_E,Special types of matrix imbalance,35,Module und Variations_E,E.Process (1) Factors, steps,36,Module und Variations_E,Processes,1,2,3,37,Module und Variation
13、s_E,Process/phases,1,2,3,4,5,Phase 1,Phase 2,Phase 3,Phase 1,Phase 2,Phase 3,Phase 1,Phase 2,Phase 3,1,2,3,4,38,Module und Variations_E,Cycles (1) (color presentation,39,Module und Variations_E,Cycles (2,40,Module und Variations_E,Spirals (orthogonal,1,2,41,Module und Variations_E,Hurdles,42,Module
14、und Variations_E,Resistance/obstacles,1,2,5,7,3,4,6,43,Module und Variations_E,Filters,1,2,4,5,3,6,44,Module und Variations_E,Change of mindset/direction,1,2,3,4,45,Module und Variations_E,Nodes/interfaces,1,4,3,7,5,6,8,9,2,46,Module und Variations_E,Pressure,1,2,47,Module und Variations_E,Increase/
15、decrease,1,2,3,4,5,6,7,8,48,Module und Variations_E,Various types of brackets (to be used instead of block arrows,1,2,3,4,5,6,7,8,9,10,11,49,Module und Variations_E,F.Process 2 Factors, impact,50,Module und Variations_E,Consequences (1,51,Module und Variations_E,Consequences (1a,52,Module und Variat
16、ions_E,Consequences (2,53,Module und Variations_E,Consequences (3,54,Module und Variations_E,Consequences (4,1,2,55,Module und Variations_E,Impact (3 factors,QUALITY,TIME,COST,56,Module und Variations_E,Impact (4 and 6 factors,57,Module und Variations_E,Impact (4 factors,Factor 3,Factor 2,Factor 4,F
17、actor 1,Generic description of the 4 factors,58,Module und Variations_E,Impact (5 factors,Factor 3,Factor 2,Factor 4,Factor 5,Generic description of the 5 factors,Factor 1,59,Module und Variations_E,Impact (6 factors,Factor 2,Generic description of the 6 factors,Factor 3,Factor 1,Factor 5,Factor 4,F
18、actor 6,60,Module und Variations_E,Impact (7 factors,Factor 3,Generic description of the 7 factors,Factor 2,Factor 6,Factor 4,Factor 5,Factor 7,Factor 1,61,Module und Variations_E,Impact (8 factors,Factor 3,Generic description of the 8 factors,Factor 2,Factor 6,Factor 7,Factor 4,Factor 5,Factor 1,Fa
19、ctor 8,62,Module und Variations_E,6 success factors,Impact and result (1,63,Module und Variations_E,Impact and result (2,5 success factors,64,Module und Variations_E,Vision,Vision,65,Module und Variations_E,Action/reaction,66,Module und Variations_E,Value chain,Customer,Supplier,Development,Producti
20、on,Sales,Distribution,Company,67,Module und Variations_E,G.Process 3 Factors, interlinked,68,Module und Variations_E,Action/reaction (1,69,Module und Variations_E,Action/reaction (2) (transparent color presentation,70,Module und Variations_E,Interaction,1,2,3,71,Module und Variations_E,Jigsaw puzzle
21、,72,Module und Variations_E,Spiral,73,Module und Variations_E,Annex: Nine key changes compared to the old standards,74,Module und Variations_E,Do not use block arrows,Use variations instead,1,2,3,4,1,2,3,4,BACKUP,New Content design Key changes regarding lean, linear, literal,Do not use shading or bo
22、rders,Instead, use unframed colored shapes in shades of key blue, for emphasis only,Do not use ovals,Instead, use AutoShapes with corners completely rounded off,Do not use stickers with lines,Instead, use upper case stickers (13 point), (key blue shade 1), positioned in the header area,Do not put numbers in circles,Instead, put them in s
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026文成事业面试题及答案
- 2026五条对策面试题及答案详解
- 2026县委法院面试题目及答案
- 2026消防应急应变面试题目及答案
- 2026初级产品面试题及答案
- 职业健康检查机构职业健康监护制度
- 资料员聘用合同书
- 2026年基于AI的质检异常模式识别系统:发现潜在质量风险
- 上半年乡政府工作总结
- 2026年智慧戒毒数据访问审计日志
- 2026年湖南有色黄沙坪矿业有限公司招聘80人笔试参考题库及答案详解
- 《养生保健》课件-5.上肢部保健按摩
- 建设电工劳务分包合同
- 2026年城乡规划设计院招聘试题(含答案)
- 小额贷款消费者权益保护制度
- 带货主播规范管理制度
- 白纸签过的协议书
- 跳高教学课件
- 2025防水工(技师)职业技能鉴定试卷
- 山西中医师承合同协议
- 针刺伤预防与处理(中华护理学会团体标准)
评论
0/150
提交评论