1、冬季施工方案 - lnlh2003的日志 - 网易博客(Winter construction program - lnlh2003s log - NetEase blog)Winter construction program - lnlh2003s Journal - NetEase blog, NetEase newsmicro-blogmailboxLightning mailAlbumadhere to principles of truth and rightMobile mailAn iconFantasyMore blogs, blogs, home pagesBlog top
2、icHot topicsBlog rape landFind friendsBlogosphereBlog styleMobile BlogSMS bloggingMail writeBlog copy, photography, photography exhibition areaDaily topicsCharacter annalsInterviewHomework search blog search blog and take a look at this blog attention style no longer difficult to move to send Lomo c
3、ard registration login display a close |Pile foundation slope supporting engineering real emotion virtual world virtual real self guided self governanceThe album music collection on my blog log log lnlh2003With the attention he.Latest logConstruction organization design, construction enterprise cont
4、ract management, civil engineering quantity calculation rules, cited reference scaffolding construction program, gravel pile technical disclosure, eleven bloggers recommendRelated logsRandom readingRent both sad who knows? 10 beautiful coat jacket to help you withstand the cold wave of the Millenniu
5、m 7 details to decipher whether men call? Crack before dawn, the formation of word of mouth mystery, cool without losing styleDoes the pressure on the London Daren Street make your hair look white? Home recommendationMy husband took vocalizations when bask in Japanese food price customized ringing t
6、one (Figure) around us to see Taiwanese male white-collar Li Han Hong return to the mainland disaster on the road in a car accident hit kill more Why College StudentsField inspection report on temporary power consumption schemeWinter construction program construction 2009-06-24 13:45:08 read 255 rev
7、iew 0: big and small subscriptions5, winter construction plan5.1 after winter, manual excavation of bored piles, construction conditions have changed the following:After 5.1.1 enters the winter, the temperature drops, the ground produces the frozen layer construction, the excavation difficulty incre
8、ases.5.1.2 enters the water temperature is reduced after the winter, well point dewatering pipes, water supply pipe, water pump, easy of ice, cracking.When the 5.1.3 enters the winter construction, the construction efficiency is reduced.After entering the winter construction of 5.1.4, the constructi
9、on will be stopped in case of bad weather. After the resumption of work, measures such as on-site cleaning and other measures should be taken.5.2, in order to ensure the quality of construction work, ensure safety in production and ensure the construction period, take the following winter constructi
10、on measures.5.2.1 guarantee the construction quality measures of steel cage.The finished material and semi-finished material of the reinforcing steel bar should be piled up neatly, covered and laid in place to prevent the corrosion of the rebar due to the rain and snow. The cage shall be cleaned bef
11、ore the steel cage is hoisted. For semi-finished products, more cage, because of rain and snow and rust, rust removal work should be carried out in a timely manner. In the construction of reinforcing steel welding, when the ambient temperature is lower than 5 DEG C, the steel bar shall be welded by
12、negative temperature welding of the steel bar, and the welder engaged in the welding of the steel bar must hold the certificate of steel welder examination. Safety technical measures shall be formulated and implemented to strengthen the labor protection of welders and prevent accidents such as burns
13、, electric shocks and fires. Before welding the steel bar, the welding shall be carried out according to the construction conditions, and the welding can be carried out after qualified. The welder shall check the appearance quality of all joints after the welding, and reject the unqualified ones. Wh
14、en welding with negative temperature, the welding parameters should be adjusted so that the welding seam and heat affected zone can be cooled slowly. When winds exceed four, wind protection measures should be taken. After welding, the cold joint should be avoided to touch the ice and snow. Welding s
15、hall not be applied when ambient temperature is lower than 20 degrees centigrade.5.2.2 steel negative temperature arc welding scope: Steel less than 22mm in diameter with a welding: j506, steel electrode selection5.2.3 preparation before weldingBefore welding, the rust, slag and oil co
16、ntamination of the welding area of the reinforcing steel bar must be removed, and the distortion and bending of the end of the steel bar should be straightened or removed by . steel lap welding should use one side welding, can not carry out single side welding or double face welding.5.
17、2.4 welding processAccording to the steel grade, diameter, joint type and welding position, welding current and electrode diameter selection, suitable welding, welding process should be adopted in multi temperature control, it is necessary to prevent cooling after welding speed is too fast, but also
18、 to prevent joint overheating. Welding process shall meet the following requirements:When welding, 5.2.41 shall be fixed at two points. Fixed by manual assistance, fixed, when the joint position is good after welding (ensure steel coaxial). welding, the arc should begin in the end of the lap
19、bar, in the end should be reinforced lap arc crater shall be filled up. lap welding, the first layer of weld arc from the middle first, then to the ends of the arc. The first layer of pedlar shall have sufficient penetration, the main weld and weld positioning, especially in the beginning and
20、 terminal position of welding seam, should be good fusion. After each layer of welding seam welding, stratified temperature control welding. The interlayer temperature is controlled between 150 DEG C and 350 DEG C, so as to play a role of slow cooling.H the weld thickness of lap joints shall
21、 be no less than 0.3 steel bars; the width of welds shall be no less than 0.7, and the diameter of the steel bars shall be no less than .5 grade reinforced bar joints of multilayer welding, the temper bead welding method , namely: the final temper bead length than before the bead at both ends
22、 of the shortened 4 - 6mm.5.2.5 quality acceptance sampling: visual inspection shall be carried out separately or visually after the joint has been removed. Tensile test, from the appearance of qualified finished products, cut three specimens per batch for tensile test. Take a tensile test at
23、 each of the 300 joints visual inspection: visual inspection results, should meet the following requirements: the weld surface formation, no sag, large overlap. There must be no crack at the joint. The undercut depth, the number of holes, the amount of slag and the size deviation of the joint
24、 shall not exceed the specified value. The appearance of unqualified joints, after modification or reinforcement, can be submitted for the two acceptance.5.2.6 connector notesWhen the steel bar is welded, the welded joints arranged in the same steel cage shall be staggered. In the range of 35 times
25、of the diameter of the reinforcing bar (no less than 500mm), a steel bar shall not have two joints, and the sectional area of the joint reinforcement shall be 50% of the total sectional area of the steel bar.5.3 ensure pore forming measures5.3.1 construction, for individual prone to collapse of the
26、pile, the use of large displacement pumps, sedimentation tanks need to set up a shelter, as far as possible to avoid the precipitation pond icing.5.3.2 uses steam (hot water) heating method on water pipeline to ensure smooth and timely cleaning pipeline residual water and sediment suspension transit
27、ions. Prevent the pipe from freezing and cracking.5.4 ensure the quality of perfusion construction5.4.1 the construction site of the reasonable control of the concrete pouring speed, strictly control the construction process, coordinate the commercial concrete supply time, reduce or avoid the waitin
28、g time of the tanker with concrete, which taking concrete into the hole temperature meets the requirement.5.4.2 uses the hot water to the catheter and joints, threaded parts timely cleaning, prevent adhesion of ice, shorten the filling time. After the concrete is finished, the pipe is cleaned in tim
29、e, and a special pipe rack is arranged on the spot. The pipe is sealed on the pipe rack to avoid the contact between the pipe and the ground mud.The 5.4.3 site pile pile buried below the surface (in Dalian, following the provisions of the deep freeze) into 24 piles of empty pile in time after backfi
30、lling, filling height of pile head height was 1.0m.5.4.4 site set up a person to do a daily temperature record.5.5 winter season guarantee measures5.5.1 construction site to take measures to keep people warm construction site will set up 3 movable rooms, with boilers for the on-site construct
31、ion workers to take turns heating.The of each worker issued coats, gloves, cotton padded cap, masks and other warm supplies.5.5.2 ensure manpower and equipment resources 50% - 100% more during the winter construction site construction and management personnel involved in construction,
32、 ensure the construction efficiency. equipment operating units increased nuanpeng. construction of vulnerable parts, pipelines, tools must be in stock, the construction site pipeline leakage, timely replacement. machines ready to be put into site operation shall be replaced with
33、 fuel, hydraulic oil and lubricating oil suitable for use in winter before the start of operation. Regular inspection and maintenance of equipment shall be carried out to ensure the normal operation of the equipment.5.5.3 logistics support guarantee the supply of labor protection products dur
34、ing construction. improve staff food supply standards. staff quarters are equipped with heating facilities to purchase heating boilers.5.6 winter construction safety measures5.6.1 fire safety measures construction site and living area are strictly prohibited from private automat
35、ic fire. establish a winter fire safety leading group, responsibility to people at any time check, put an end to fire. formulate safety fire emergency plan, and site construction personnel safety education, clear fire emergency measures. construction site and living area to purc
36、hase fire equipment, safety education for the construction staff, the use of fire control facilities. oxygen, acetylene bottles and other flammable and explosive materials, away from fire storage. construction site and living area heating, fire, special care to prevent fire and carbon monoxide poisoning.5.6.2 construction site and living areas are prohibited unauthorized use of electrical heating.5.6.3 climbing and mechanical work before the construction of special arrangements to clean up
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026国家义务教育(心理健康)质量监测考试试题库含答案
- 金华市首届社会应急力量竞赛理论考试题库及答案
- 糖尿病家庭护理查房
- 攀枝花市西区第三幼儿园5月节约用水知识大赛试题及答案
- 施工现场扬尘控制施工工艺
- 2026年小升初衔接英语写作技巧专项训练试卷(附答案)
- 产房医务人员医院感染防控知识考核试题及答案
- 2025-2026年孕妇营养与保健知识测试卷
- 2025-2026年中医中药学综合知识测试卷
- 2025-2026年人教版九年级地理下册第八章区域地理测试卷
- 2025年福建省工勤技能考试(行政事务人员技师)经典试题及答案
- 早产儿肠内营养管理
- 产品变更通知单模板PCN(4P)
- 分泌物廓清技术课件
- 2025至2030年中国视力训练仪行业市场现状分析及未来前景分析报告
- 2025年浙江嘉兴中新嘉善现代产业园开发有限公司招聘笔试参考题库含答案解析
- 德邦车管理制度
- DB5334 T 15-2025 维西糯山药栽培技术规程
- 《先进光纤激光器》课件
- T-COOA 12-2024 眼镜布和眼镜袋
- 《干部履历表》(1999版电子版)
评论
0/150
提交评论