下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、For the distillation column and the reboiled absorber, the following predefi ned reboiler pre-c on figurati ons (below) are available on page 2 of the column configuration wizard. Depending on the configuration you can specify a HYSYS Reboiler, a Heater, or a heat exchanger model as the reboiler typ
2、e.Thermosiph on reboilers can now be simulated rigorously using Aspe n Shell& Tube Exchanger (formerly Tasc+). Using this operation as the reboiler you can select differenttypes of EDR-Shell and Tube heat exchangers suchas thermosiph on, kettle, and forced circulati on.The heat excha nger is in tegr
3、ated with the colu mn so that rigorous calculations can be done in both the column and the reboiler. The heat excha nger is treated as part of the colu mn and both the colu mn and the heat excha nger are solved simulta neously.Whenthe selections are complete moveto the next page to specify top and l
4、ast stage pressures.Notes: For a thermosiph on reboiler,both fixed-flow and fin d-flowopti onsare impleme nted.* Some specs related to the EDR-Shell and Tube heat excha nger are automatically defi ned to mini mize user in put.* A damp ing factor is added for EDR-Shell and Tube heat excha ngers in si
5、de the colu mn sub-flowsheet to improve the conv erge nee of the solver.Each con figurati onis show n both as an approximati on of the way it mightbe arranged in an actual column and in detail showing howit is represented using heat excha ngers, flash drums, mixers, and splitters. In these diagrams,
6、 NT represe nts the nu mber of trays (stages)Reboiler Once-throughThis configurationis available whenusing the kettle reboiler. The liquidcoming from the stage above the reboiler passes through the reboiler once and is returned to the bottom of the column as a mixture of liquid (which goes into the
7、sump, to be draw n as bottom product) and vapor (which goes up to the stage above).MT- 1Reboiler Circulation without baffleThe liquid coming from the stage above the reboiler enters the sump, from which the bottoms and the reboiler feed are both drawn (with the same composition). The reboiler produc
8、t is returned above the sump. Vapor may also be produced whe n the hot liquid return from the reboiler con tacts the liquid in the sump.WT - 1Reboiler Circulation with baffleThe sump is divided in to two secti ons with differe nt compositi ons. The liquid from above the reboiler en ters one sect ion, from which the reboiler feed is drawn. The reboiler liquid product enters the other section, from which the bottoms stream is draw n.Excess reboiler liquid return (above the flow rate of the bottoms stream) overflow
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- ISO9001-2026《质量管理体系-要求》(正式版)之“8.5.2标识和可追溯性”条款专题深度解读与专业应用操作指南(2026A0-雷泽佳编制)
- 散打教练岗位教学考试试卷及答案
- 中继泵站运行工岗前理论知识考核试卷含答案
- 电机铁芯叠装工变革管理模拟考核试卷含答案
- 货车检车员改进能力考核试卷含答案
- 己二酸装置操作工发展趋势考核试卷含答案
- 品酒师岗中应急考核试卷含答案
- 2026年生物安全培训试题(含答案)
- 2026年生产计划员试题(附答案)
- 乳品加工工岗位综合评估考核试卷含答案
- 公立医院领导人员管理办法-2017-2026完整对比版
- 2027届上海市浦东新区洋泾中学物理高二上期中考试试题含解析
- 2026重庆渝中区社区工作者及后备人员招聘《综合知识》模拟试卷
- 《10 谁在运动》课件2026-2027学年湘科版四年级上册科学
- 医疗机构麻醉药品和精神药品管理规定2026解读
- 《中华人民共和国生态环境法典》测试题(含参考答案)
- 【新教材】2026年秋人教版(PEP)五年级上册英语全册教案(含教学计划)
- DBJ50-T-061-2021 预拌砂浆生产与应用技术标准
- 2026语文新教材 7.我的战友邱少云 课件
- 电子科技大学学生手册
- 基于QFD创新型品管圈的区域药学服务新模式构建(药剂科)(药房)(门诊)(药房门诊)
评论
0/150
提交评论