机器人筑砌砖墙专用泥浆泵设计 【说明书+CAD+PROE】
收藏
资源目录
压缩包内文档预览:
编号:122571974
类型:共享资源
大小:15.33MB
格式:ZIP
上传时间:2021-04-20
上传人:221589****qq.com
认证信息
个人认证
李**(实名认证)
湖南
IP属地:湖南
40
积分
- 关 键 词:
-
机器人筑砌砖墙专用泥浆泵设计
【说明书+CAD+PROE
机器人
砌砖
专用
泥浆泵
设计
说明书
CAD
PROE
- 资源描述:
-
机器人筑砌砖墙专用泥浆泵设计 【说明书+CAD+PROE】,机器人筑砌砖墙专用泥浆泵设计,【说明书+CAD+PROE,机器人,砌砖,专用,泥浆泵,设计,说明书,CAD,PROE
- 内容简介:
-
The importance of axial effects for borehole design of geothermalheat-pump systemsD. Marcottea,b,c,*, P. Pasquiera, F. Sheriffb, M. BerniercaGolder Associates, 9200 lAcadie, Montreal, (Qc), H4N 2T2 CanadabCANMET Energy Technology Centre-Varennes, 1615 Lionel-Boulet Blvd., P.O. Box 4800, Varennes, (QC), J3X 1S6 CanadacDe partement des ge nies civil, Ge ologique et des mines, Ecole Polytechnique de Montre al, C.P. 6079 Succ. Centre-ville, Montre al, (Qc), H3C 3A7 Canadaa r t i c l e i n f oArticle history:Received 13 May 2008Accepted 18 September 2009Available online 23 October 2009Keywords:Infinite line sourceFinite line sourceGround loop heat exchangersHybrid systemsUnderground water freezinga b s t r a c tThis paper studies the effects of axial heat conduction in boreholes used in geothermal heat pumpsystems. The axial effects are examined by comparing the results obtained using the finite and infiniteline source methods. Using various practical design problems, it is shown that axial effects are relativelyimportant. Unsurprisingly, short boreholes and unbalanced yearly ground loads lead to stronger axialeffects. In one example considered, it is shown that the borehole length is 15% shorter when axialconduction effects are considered. In another example dealing with underground water freezing, theamount of energy that has to be removed to freeze the ground is three times higher when axial effectsare considered.? 2009 Elsevier Ltd. All rights reserved.1. IntroductionGeothermal systems using ground-coupled closed-loop heatexchangers (GLHE) are becoming increasingly popular due togrowing energy costs. Such a system is presented in Fig. 1.The operation of the system is relatively simple: a pump circu-lates a heat transfer fluid in a closed circuit from the GLHE to a heatpump (or a series of heat pumps). Typically, GLHE consistsof boreholes that are 100150 m deep and have a diameter of1015 cm. The number of boreholes in the borefield can range fromone, for a residence, to several dozens, in commercial applications.Furthermore, several borehole configurations (square, rectangular,L-shaped) are possible. Typically, a borehole consists of two pipesforming a U-tube (Fig.1). The volume between these pipes and theborehole wall is usually filled with grout to enhance heat transferfrom the fluid to the ground. In some situations it is advantageousto design so-called hybrid systems in which a supplementary heatrejecter or extractor is used at peak conditions to reduce the lengthof the ground heat exchanger.Given the relatively high cost of GLHE, it is important to designthem properly. Among the number of parameters that can bevaried, the length and configuration of the borefield are important.There are basically two ways to design a borefield. The first methodinvolves using successive thermal pulses (typically 10-years1month6 h) to determine the length based on a given configura-tion and minimum/maximum heat pump entering water temper-ature 8,3. There are design software programs that perform thesecalculations. Some use the concept of the g-functions developed byEskilson 5. The g-functions are derived from a numerical modelthat, by construction, includes the axial effects. The other approachis to perform hourly simulation. This last approach is essential fordesign of hybrid systems in which supplemental heat rejection/injection is used. There are several software packages that canperform hourly borehole simulations. For example, TRNSYS 9 andEnergyPlus 4 use the DST 6 and the short-time step model 5,respectively. Even though these packages account for axial effects,they necessitate a high level of expertise. Furthermore, it is noteasily possible to obtain ground temperature distributions like theones shown later in this paper. In this paper hourly simulations areperformed using the so-called finite and infinite line sourceapproximations where the borehole is approximated by a line witha constant heat transfer rate per unit length. These approximationspresent, in a convenient analytical form, the solution to the tran-sient 2-D heat conduction problem. Despite their advantages,hourly simulations based on the line source approximation are* Corresponding author. De partement des ge nies civil, ge ologique et des mines,Ecole Polytechnique de Montre al, C.P. 6079 Succ. Centre-ville, Montre al, (Qc),H3C 3A7 Canada. Tel.: 1 514 340 4711x4620; fax: 1 514 340 3970.E-mail address: denis.marcottepolymtl.ca (D. Marcotte).Contents lists available at ScienceDirectRenewable Energyjournal homepage: /locate/renene0960-1481/$ see front matter ? 2009 Elsevier Ltd. All rights reserved.doi:10.1016/j.renene.2009.09.015Renewable Energy 35 (2010) 763770rarely used in routine design due to the perceived computationalburden.The major difference between the finite and infinite line sourcelies in the treatment of axial conduction (at the bottom and top ofthe borehole) which is only accounted for in the former. Thetheoretical basis of the finite line source, although more involvedthan for the infinite line source, was first established by Ingersollet al. 7. It has been rediscovered recently by Zeng et al. 15 whoimproved the model by imposing a constant temperature at theground surface. Lamarche and Beauchamp 11 have made a usefulcontribution to speed up the computation of Zengs model. Finally,Sheriff 13 extended Zengs model by permitting the borehole topto be located at some distance below the ground surface. She alsodid a detailed comparison of the finite and infinite line sourceresponses, but did not examine the repercussion on borefielddesign.At first glance, the axial heat-diffusion is likely to decrease(increase) the borehole wall temperature in cooling (heating)modes respectively. Therefore, designing without consideringaxial effects appears to provide a safety factor for the design. But,is it really always the case? Moreover, are the borehole designsincorporating axial effects significantly different from thoseneglecting it? Under which circumstances are we expected tohave significant design differences? These are the main questionswe seek to answer. The main contribution of this research is todescribe, using synthetic case studies, the impact of consideringaxial effects on the GLHE design. Our main finding is that formany realistic circumstances the axial effects cannot be neglec-ted. Therefore, design practices should be revised accordingly toinclude the axial effects.We first review briefly the theory for infinite and finite linesource models. Then, we present three different design situations.The first two situations involve the sizing of geothermal systemswith and without the hybrid option, under three different hourlyground load scenarios. The last design problem examines theenergy required and ground temperature evolution in the contextof ground freezing for environmental purposes.2. Theoretical backgroundThe basic building block of both infinite and finite line sourcemodels is the change in temperature felt at a given location andtime due to the effect of a constant point source releasing q0units ofheat per second 7:DTr;t q04pksrerfc?r2ffiffiffiffiffiatp?(1)where erfc is the complementary error function, r the distance tothe point heat source, andais the ground thermal diffusivity.The line is then represented as a series of points equally spaced.In the limit, when the distance between point sources goes to zero,Fig. 1. Sketch of a GLHE system.NomenclatureaThermal diffusivity (m2s?1)A, B, C, D Synthetic load model parameters (kW)br/HCsGround volumetric heat capacity (Jm?3K?1)erfc (x)Complementary error function(erfcx 12ffiffiffippRNxe?t2dtEWTTemperature of fluid entering the heat pump (K or?C)FoFourier number, Foat/r2ksVolumetric ground thermal conductivity (Wm?1K?1)HBorehole length (m)HPHeat Pumpq0Radial heat transfer rate (W)qRadial heat transfer rate per unit length (Wm?1)SBorehole spacing (m)rDistance to borehole (m)rbBorehole radius (m)RbBorehole effective thermal resistance (KmW?1)tTimeDT (r, t)Ground temperature variation at time t and distance rfrom the borehole (K or?C)TfFluid temperature (K or?C)TgUndisturbed ground temperature (K or?C)TwTemperature at borehole wall (K or?C)uH2ffiffiffiffiatpx, ySpatial coordinates (m)zElevation (m)D. Marcotte et al. / Renewable Energy 35 (2010) 763770764the combined effect felt at distance r from the source is obtained byintegration along the line.2.1. Infinite line sourceIn an infinite medium, the line-integration gives the so-called(infinite) line source model 7:DTr;t q4pksZNr2=4ate?uudu(2)2.2. Finite line sourceIn the case of a finite line source, the upper boundary isconsidered at constant temperature, taken as the undisturbedground temperature 15. This condition is represented by addinga mirror image finite line source with the same load, but oppositesign, as the real finite line. Then, integrating between the limits ofthe real and image line, one obtains 15,13:DTr;t;z q4pksZH00erfc?du2ffiffiffiffiatp?du?erfc?d0u2ffiffiffiffiatp?d0u1Adu(3)where du ffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffir2 z ? u2qand d0u ffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffir2 z u2q, z is theelevation of the point where the computation is done. The left partof the integrand in Equation (3) represents the contribution by thereal finite line, the right part, the contribution of the image line.Fig. 2 shows the vertical temperature profile obtained withEquation (3) at radial distance r2 m, after 200 days, and atr1 m, after 2000 days of heat injection. The correspondinginfinite lines-source temperature is indicated as a reference. In thisexample, the borehole is 50 m long, the groundthermal parametersare ks2.1 Wm?1K?1and Cs2e06 Jm?3K?1. The ground is inti-tially at 10oC. The applied load is 60 W per m for a total heatingpower of 3000 W. As expected, the importance of axial effects andthe discrepancy between infinite and finite models increases withthe Fourier number (at/r24.54 and 181.4 for these two cases).In hourly simulations, the fluid temperature (Tfin Fig. 1) isrequired. This necessitates knowledge of the borehole thermalresistance Rb(i.e. from the fluid to the borehole wall), and of theborehole wall temperature (Twin Fig. 1) 2. The average boreholewall temperature it obtained by integrating Equation (3) along z.However, this is computationally intensive due to the doubleintegration. Lamarche and Beauchamp 11 have shown, using anappropriate change of variables, how to simplify Equation (3) toa single integration. Accounting for small typos in 11 and 15 asnoted by Sheriff 13, the average temperature difference, betweena point located at distance r from the borehole and the undisturbedground temperature, is given by:DTr;t q2pks0BBBZffiffiffiffiffiffiffiffiffib21pberfcuzffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiz2?b2qdz ? DA?Zffiffiffiffiffiffiffiffiffib24pffiffiffiffiffiffiffiffiffib21perfcuzffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiffiz2?b2qdz ? DB1CCCA(4)wherebr/H, r is the radial distance from the borehole center,uH2ffiffiffiffiatpand DA, and DBare given by:DAffiffiffiffiffiffiffiffiffiffiffiffiffiffib2 1qerfc?uffiffiffiffiffiffiffiffiffiffiffiffiffiffib2 1q?berfcub? e?u2b21? e?u2b2uffiffiffipp!andDBffiffiffiffiffiffiffiffiffiffiffiffiffiffib2 1qerfc?uffiffiffiffiffiffiffiffiffiffiffiffiffiffib2 1q? 0:5?berfcubffiffiffiffiffiffiffiffiffiffiffiffiffiffib2 4qerfc?uffiffiffiffiffiffiffiffiffiffiffiffiffiffib2 4q? e?u2?b21? 0:5?e?u2b2 e?u2?b24?uffiffiffipp!10121416182022240102030405060Temperature ( oC)Depth (m)Vertical temperature profile Infline, r=2, t=200 dFline, r=2, t=200 dFline average, r=2, t=200 dInfline, r=1, t=2000 dFline, r=1, t=2000 dFline average, r=1, t=2000 dFig. 2. Vertical ground temperature profile at radial distances r1 m and r2 m afterrespectively 2000 days and 200 days, Fo(r 1, t2000)181.4 and Fo(r 2,t200)4.54.Constantheatinjectionof3000 W.Thermalparameters:ks2.1 Wm?1K?1,Cs 2e06 Jm?3K?1.010002000300040005000024681012Days T (oC) InfiniteFiniteFEMFig. 3. Comparison of Finite and Infinite line source model with finite element model(FEM) for a 30 m borehole. Average temperature variation computed at 0.5 m from theborehole axis, over the borehole length. Constant heat transfer rate of 1000 W.Thermal parameters: ks2.1 Wm?1K?1, Cs2e06 Jm?3K?1.D. Marcotte et al. / Renewable Energy 35 (2010) 763770765The particular case rrbin Equation (4) gives the borehole walltemperature.2.3. Numerical validationFig. 3 compares the variation in temperature over timecomputed with finite and infinite line source to the numericalresults of a finite element model (FEM) constructed withinCOMSOL?. The finite element model is 2-D with axial symmetryaround the borehole axis. The ground is represented bya 50 m longand 50 m radius cylinder. The borehole is represented by a 30 mlong and 0.075 m radius cylinder delivering 1000 W. The axis ofrevolution is located at the borehole center and constitutesa thermal insulation boundary whereas all external boundaries areset to the undisturbed ground temperature. Over 6000 triangularelements equipped with quadratic interpolating functions are usedto discretize the model. The agreement between the FEM modeland the finite line source is almost perfect, the maximum absolutedifference in temperature over the 5000 days period being only0.019oC.Fig. 4 compares the temperature obtained with the infiniteand finite line source models, at r 1 m and r 0.075 m (atypical value for rb), with the thermal parameters specifiedabove. A 1oC temperature difference between the infinite andfinite models is obtained after 2.5 y and 2 y, at 1 m and 0.075 mrespectively. Note that the temperature reaches a plateau for thefinite line source model indicating that a steady-state conditionhas been reached. In contrast, the infinite line source modelexhibits a linear behavior.Fig. 5 shows the ground temperature, computed at a distance of1 m from the borehole, for increasing values of the borehole length.As expected, the finite line source solution reaches the infinite linesource solution for long boreholes.0.001 0.01 0.111010010001020304050607080r=0.075 mr=1 mGround temperatureTime (y)Temperature (oC)Fig. 4. Comparison of Finite (solid) and Infinite (broken) line source model, computedat distance 1 m and 0.075 m from the borehole. Constant heat transfer rate per unitlength of 100 W/m. Thermal parameters: ks2.1 Wm?1K?1, Cs2e06 Jm?3K?1.010020030040050060070080090010001212.51313.5Borehole length (m)Temperature (oC)Average temperature vs borehole length Infinite linesourceFinite linesourceFig. 5. Infinite vs finite line source average temperature along a vertical profile. The loadis 20 W/m, thermal parameters: ks2.1 Wm?1K?1, Cs2e06 Jm?3K?1. Temperaturecomputed after one year at r1 m from the borehole.1234561000100Cooling (+) Heating () load Time (h)Load (kw)1234562001000100Load decompositionLoad (kw)Fig. 6. Principle of temporal superposition for variable loads.0510152025303533.544.555.566.577.5COP vs EWTEWTCOP CoolingHeatingFig. 7. COP as a function of EWT.D. Marcotte et al. / Renewable Energy 35 (2010) 7637707663. Design of complete geothermal systemsIn this section we compare the design length of borefieldsobtained with the finite and infinite line source models for givenhourly ground load scenarios. These calculations imply that singleborehole solutions will need to be superimposed spatially. We havealready seen an instance of this principle of superposition whilecomputing the line source solution from a series of constant pointsources along a line 7, see Equations (1 and 2). The additivity ofeffects (variation in temperature) stems from the linear relationbetween q andDT, and the fact that energy is an extensive andadditive variable. The temporal superposition also follows the samegeneral principle of addition of effects as described by Yavuzturkand Spitler 14 and illustrated by Fig. 6. When the load is varyinghourly, a new pulse is applied each hour. It is simply the differencebetween the load for two consecutive hours. More formally, for theinfinite line source as an example, with a single borehole, we have:DTr;t Xi; ti?tq?i4pkZNr2=4at?tie?uudu(5)where: q*1q1, and q*iqi?qi?1, i2.I, tI?t, is the incrementalload between two successive hours. With multiple boreholes,DTx0;t Xnj1Xi; ti?tq0i4pkZNkxj?x0k2=4at?tie?uudu(6)where: n is the number of boreholes, xjand x0are the coordinatevectors of borehole j and point where temperature is computed,respectively. Note that for long simulation periods, the computa-tional burden becomes important.In the test cases that follow we assume that all of the buildingheating and cooling loads are to be provided by the GLHE system,i.e. there is no supplementary heat rejection/injection. Syntheticbuilding loads are used to enhance the reproducibility of ourresults. These building loads are simulated using:Qt A ? B cos?t87602p? C cos?t242p? D cos?t242p?cos?2t87602p?(7)In Equation (7), t is in hours, A controls the annual loadunbalance, B the half-amplitude of annual load variation, C and D4030201001020304040302010010203040 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110 111 112 113 114 115 116 117 118 119 120 121 122 123 124 125 126 127 128 129 130 131 132 133 134 135 136 137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 169 170 171 172 173 174 175 176 177 178 179 180 181 182 183 184 185 186 187 188 189 190 191 192 193 194 195 196 197 198 199 200 201 202 203 204 205 206 207 208 209 210 211 212 213 214 215 216 217 218 219 220 221 222 223 224 225Borehole location and priority numberCoord. x (m)Coord. y (m)Fig. 8. Borehole grid and priority number. Number indicates order of inclusion in the design when required.Table 1Number of boreholes required, complete geothermal system. Constant T assumesa constant ground surface temperature of 10oC, Periodic T assumes a periodicground surface temperature with an amplitude of ?20oC in phase with the heatload.ScenarioBorehole length Infinite line Finite lineConstant T Periodic TBalanced (A?17)100 m333334Balanced50 m767480Cooling dominant (A17) 100 m393637Cooling dominant50 m937981Heating dominant(A?30)100 m575356Heating dominant50 m134115124Table 2Number of boreholes required, hybrid system. HP capacity represents 40% ofmaximum building load. The last two column represent the percentage of thebuilding load supplied by the HP for each mode.ScenarioBoreholelengthNumber ofboreholes% EnergyInfiniteFiniteCooling Inf.(Fin.)Heating Inf.(Fin.)Balanced100 m191969 (69)77 (78)Balanced50 m373767 (67)72 (73)Cooling dominant100 m242469 (69)86 (86)Cooling dominant50 m413970 (69)90 (88)Heating dominant100 m373767 (67)83 (86)Heating dominant50 m555372 (70)70 (73)D. Marcotte et al. / Renewable Energy 35 (2010) 763770767the half-amplitude of daily load fluctuations. D/C controls therelative importance of the damped component used to simulatelarger daily fluctuations in winter and summer. Coefficients A to Dare in kW.We consider three different load scenarios, each with B100,C50, and D25. One is approximately balanced (A?17), one isa cooling dominated load (A17) and the other is a heating domi-natedload(A?30).Conversionofbuildingloadstogroundloadsisdone with: qgroundqbuilding(1?1/COP). The heat pump COP variesas a function of entering water temperature as depicted in Fig. 7.For all scenarios, we consider a unique set of possible locationsfor the boreholes. The locations are at the nodes of a regular grid ofmesh S6 m. The boreholes are assigned a priority number (lowernumber / highest priority), moving excentrically from the gridcenter to the fringes (see Fig. 8). The system is simulated with100 m and then, 50 m long boreholes. The borehole heads arelocated at the ground surface.For each scenario and given number of boreholes, we simulatethe hourly fluid temperature for a 10-year period. We repeat thissimulation for different number of boreholes and finally keep thelowest number of boreholes ensuring that the fluid temperature atthe HP entrance never exceeds the HP limit specifications. We dothis computation using both the infinite and finite line sourcemodels.Thermal parameters of the ground are: thermal conductivityks2 Wm?1K?1, volumetric heat capacity Cs3.4e06 Jm?3K?1and borehole thermal resistance Rb0.1 mKW?1. The ground isinitially at 10oC and all the boreholes have a radius of rb0.075 m.Table 1 gives the number of boreholes required for a specificscenario and model. The choice of model does not have a strongimpact on the balanced load scenario. However, for cooling andheating dominant scenarios, the finite line source model indicatesa reduction in the number of boreholes of approximately 7% and15% for the 100 m and 50 m borehole length. As expected, theshorter the borehole length, the greater are the discrepanciesbetween both models.3.1. Seasonal effectsThe finite line source model assumes a constant temperature atthe ground surface equal to the undisturbed ground temperature.This hypothesis would more or less correspond to the case ofgeothermal boreholes located under a building slab. However, inmany cases, the boreholes are located outside the building areawhere the ground surface temperature varies in phase with theheat load. One can expect the axial effect at the ground surface willbe less than under the constant temperature assumption. Theinfluence of ground surface temperature variation on the groundtemperature, at any depth and time, can be computed for a periodicsignal 7. Using the principle of superposition, the influence on thedesign can be assessed.Last column of Table 1 gives the number of boreholes requiredwhen the ground surface temperature is periodic, in phase with theheat load, and shows a yearly variation of ?20oC. The boreholeheads are located at the ground surface, a feature that maximizesthe seasonal effects on the design. As expected, the designs withperiodic ground surface temperature require more boreholes thanwithconstantgroundsurfacetemperature.Forunbalancedscenarios, the periodic ground surface temperature solutionsobtained are intermediate between the infinite and the finite linesource designs.05101520253064202468Time (year)oTemperature ( C)Rock temperature at x=(13,5,12.0) Infinite linesourceFinite linesource1510505101515105051015Control pointx (m)y (m)Fig. 9. Vertical average rock temperature at point x(13.5, 12.0). Thermal parameters: ks2 Wm?1K?1, Cs3.4e06 Jm?3K?1.05101520253010009008007006005004003002001000Time (year)Load (W)Ground cooling load / borehole Infinite linesourceFinite linesourceFig. 10. Evolution of average load per borehole.D. Marcotte et al. / Renewable Energy 35 (2010) 7637707684. Design of hybrid geothermal systemsThe design situation borrows its essential features (boreholegrid, thermal parameters, heat load scenarios) from the previouscomplete geothermal system example. The main difference is thatthe HP and auxiliary system power are respectively selected at 40%and 60% of the maximum building load. The simulation works thesame wayas previously with the following modification. Each hour,the fluid temperature at the HP entrance (EWT) is computed. IfEWT, at any hour, exceeds the HP specification limit, it is assumedthat the HP cycles to keep the EWTat its limit value, the excess loadbeing taken by the auxiliary system. We keep track of all the loadsprovided by the auxiliary system. At the end of the 10-year simu-lation, we verify that the load to the auxiliary system never exceedsits capacity. If exceeded, we add more boreholes. The final design isobtained with the smallest number of boreholes compatible withthe auxiliary system capacity.Table 2 shows the number of boreholes for a specific scenarioand computation model. The proportion of energy provided by thegeothermal system, relative to the total building energy requiredfor the 10-year period, is also given. Unbalanced scenarios withshort boreholes display reduction of only 6% for the number ofboreholes required. However, comparison of Tables 1 and 2 revealsstriking reduction in numberof boreholes. The hybrid systemsneedonly between 46% and 70% of the number of boreholes for thecomplete geothermal system. Yet, the geothermal components ofhybrid systems are able to supply between 67% and 70% of thecooling load and between 73% and 88% of the heating load for thevarious scenarios examined. As the borehole construction costrepresents the main investment in a geothermal system, it indi-cates that hybrid systems can be economically advantageous.Even though hourly simulations are computationally moreinvolved, efficient methods exist to speed up the computations1,10,12. For example, a hybrid system 10-years hourly simulationfor a 45 boreholes field is computed in less than 2 min on a stan-dard laptop.5. Comparing performances for a rock freezing problemIn some environmental problems, like those involving DNAPL(dense non-aqueous phase liquid), the contaminants reach thebedrock and then can propagate through the rock fractures. In suchX coordinate (m)Y coordinate (m)Infinite line: Temperature after 5 years 15105051015151050510151210864202X coordinate (m)Y coordinate (m)Finite line: Temperature after 5 years 15105051015151050510151210864202X coordinate (m)Y coordinate (m)Infinite line: Temperature after 20 years151050510151210864202X coordinate (m)Y coordinate (m)Finite line: Temperature after 20 years 1510505101515105051015151050510151210864202Fig. 11. Ground temperature after 5 years (top) and 20 years (bottom). Infinite line source model (left) and finite line source model (right).D. Marcotte et al. / Renewable Energy 35 (2010) 763770769circumstances, remediation can be extremely difficult and expen-sive. One solution is to catch and treat all the contaminants flowingthrough the fractures. This requires designing a series of wellsforming an hydraulic trap. The pumping and treatment is expensiveand it has to be maintained typically for hundreds of years. More-over, the flow of water to treat could be relatively important. Analternative is to permanently freeze the liquid within the fracturesto avoid any movement of the contaminant.In the following example, we consider the problem of freezingwater inside rock fractures, in a domain 30 m by 30 m by 30 m, forthe purpose of long term confinement of toxic DNAPLs. A 10 ?10borefield is considered (see Fig. 9). Thermal parameters of the rockare: thermal conductivity ks2 Wm?1K?1and volumetric heatcapacity Cs3.4e06 Jm?3K?1. The borehole thermal resistance isRb0.1 m KW?1. The rock is initially at 10oC. The rock porosity issmall enough so as to neglect the latent heat of water and theincrease of rock thermal conductivity occurring when waterfreezes. The total HP capacity is 100 kW (one kW per borehole)and the EWT limit is ?8oC. The mass flow of the circulating fluid is19 l/s (or 0.19 l/s for each borehole). The simulation is run for 30years. The HP capacity is kept at its maximum until the EWT hasreached the limiting value of ?8oC. Then, the HP cycles tomaintain the EWT at this temperature. The performance of thesystem is monitored by computing rock temperature at a controlpoint located at the borefield periphery at (x, y) (13.5,12) m (seeFig. 9).Fig. 9 shows the rock temperature obtained at this control pointusing the infinite and finite line source models. Fig. 10 shows thecorresponding average hourly load per borehole. In both figures,the rugged nature of the load curves is due to intermittent opera-tion of the HP. As shown in Fig. 9, the rock becomes permanentlyfrozen after 10 months and 2.2 years for the infinite and finitemodels, respectively. The temperature difference between bothmodels increases steadily with time, to reach approximately 2oCafter 30 years. The finite line source model predicts that about150 W per borehole are required compared to only 50 W perborehole for the infinite line source model (Fig. 10). Thus, despitea higherheat transfer rate per borehole, the finite line source modelpredicts a higher rock temperature at the control point.In this next example, the same 10?10 borefield is cooled ata rate of 10 W/m (300 W/borehole) for the first year and then3.33 W/m (100 W/borehole) permanently. The temperature distri-bution in the ground is computed using the infinite and finite linesource models after 5 and 20 years. Results are presented in Fig.11.The proportion of the domain with temperature below freezing is79% and 100% after 5 and 20 years for the infinite line sourcecalculation whereas it is only 10% and 52% with the finite linesource model. Therefore, a design based on the use of the infiniteline source would have wrongly predicted ground freezing. Thus,contrary to the two previous examples, the infinite model does notprovide a conservative design.6. ConclusionThis paper studies the effect of axial heat conduction in bore-holes used in geothermal heat pump systems. The axial effects areexamined by comparing the results obtained using the finite andinfinite line source methods. Using various practical design prob-lems it is shown that axial effects are relatively important. Evenwith a borehole spacing / borehole length (S/H) as lowas 0.06, thefinite line source model indicated that 7% less boreholes arerequired,fora complete geothermal system,when theyearlyload isunbalanced either in cooling or in heating. The reduction in thenumber of boreholes due to axial effects increases to 15% for 50 mlong boreholes (ratio S/H0.12). Differences between the finiteand infinite line source models were noticeably smaller for thehybrid system but still indicate that less boreholes are generallyrequired with the finite line source model. As sizing of geothermalsystem is a determining factor for the profitability of a project, axialeffects should certainly be considered in similar circumstances.Also, the value of using hybrid systems to substantially reduce thenumber of boreholes, yet preserving most energy savings, wasconfirmed.In another example dealing with underground water freezing,the amountof energy that has tobe removedtofreeze the groundisthree times higher when axial effe
- 温馨提示:
1: 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
2: 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
3.本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

人人文库网所有资源均是用户自行上传分享,仅供网友学习交流,未经上传用户书面授权,请勿作他用。