1、用英文来写咨询报告 Content 总目录 I:Background 5 -11 II:Executive Summary 12-23 III: Acceptable Investment Quantity For Power Supply Bureau 24-27 IV:Different models of fund-rising in underground cabling construction28-65 V:Two construction model to be focused:“Separation from tunnel and cable” 2001: 258 km 4At
2、 present, synthetic pipeline groove of 3 horizontal and 4 vertical roads within loop 2 in Shenyang are under construction nUsers of pipeline groove: feeble current line users including communication (China Mobile, China Unicom, China Railcom and China Netcom, etc.), cable, public security, limitary,
3、 traffic police and education nFund preparation method: mainly of governmental investment assisted with social investment and bank loan 4The company possesses RMB 10 million yuans of registered capital with 51% of stock share hold by Shenyang Infrastructure Investment Co., Ltd. and 49% by Shenyang J
4、ifeng Company. This fund is applied to daily expenditures and small amount of initial engineering expenses 4Prepayment of 30% is paid by users. Shenyang Planning Institute makes the unified city plan and worked out and published the Shenyang Overall Plan for Communication Synthetic Pipeline in March
5、, 2001. Users like communication departments were called together and released the solution to them. Contracts were signed with these users and their actual mileage required were determined. The company calculated the total necessary expenses and divided to each communication company with average 30
6、%. Upon completion of the project, each communication inspected and accepted the project and the balances of 70% were collected then. 4The remaining funds under construction are loans from CITIC Industrial Bank 第四部分沈阳 Operation and management of common pipeline groove nCost advantage: the cost purch
7、asing pipeline groove is only equivalent to 1/3 of self construction while the speed of pipeline construction and covering area are 8-10 times of self construction nDetermination of rent: pipeline groove can be leased or purchased with different prices to different users. The current pricing level i
8、s only 1/3 to of self construction 4Users can purchase permanent using right or lease by installment 4For those operational entities, expenses higher than cost are charged. Using right is sold to the operational telecommunication operators by the price of slightly higher than cost, i.e., 80,000 yuan
9、 per hole per km 4For those non-operational units or governmental organizations, pipeline groove can be used with less charges or free of charge. Using right is sold to those government organs or enterprises like cable TV, public security, military, traffic police and education with the price lower
10、than cost or free or charge. nRetaliation level: The company gains its profit daily maintenance charges and leasing expenses. In view of operation status in 2001, both the income and expenditure are about 100 million yuans with net profit of less than 2 million yuans after balancing income and expen
11、diture nMaintenance and management: “unified model”, i.e. unified plan, unified operation and unified maintenance 4Chengfeng Company employs specially trained working personnel of 30 persons at present and possesses 5-6 vehicles servicing for daily maintenance of pipelines 第四部分沈阳 Policy confrontatio
12、n facing by Chengfeng Company has attracted the concern of MoC Synthetic pipeline groove met many difficulties during actual operation mainly of clash and confrontation among industrial policies 4Telecommunication Regulations of Peoples Republic of China issued in Sep., 2000 stipulated that pipeline
13、 construction involving in network belongs to infrastructure telecommunication business and is requested to apply operation license of infrastructure telecommunication from Ministry of Information Industry (MoII) 4Above stipulation has been stated again in Management Method for Telecommunication Con
14、struction published by MoII and the State Planning Committee in Jan. 2002 429th clause in Urban Road Managing Regulation published by MoC in June, 1996 has clearly described that pipelines and poles attached to urban roads should be approved and constructed by municipal administration department Opi
15、nions of Chengfeng Company: Synthetic pipeline projects attached to newly constructed and rebuilt roads should be approved and constructed by municipal construction department. Synthetic pipeline projects attached to the current roads should be approved and constructed by municipal administration de
16、partment. Otherwise, confusion may occur in constructions of urban roads and completing pipeline and the same old disastrous event will happen again The actions of Chengfeng Company have attracted concerns of City Construction Department of MoC, the competent department. Municipal government has con
17、ducted the investigation to the company and are carrying on researches on relative topics. They think that measures taken in Shenyang has found an effective way to resolve problems of synthetic pipeline construction including that of power cable construction. One working personnel of city constructi
18、on department expressed that, as the industrial competent department, MoC is responsible to clean obstacles of construction violation for local level 第四部分沈阳 Infrastructure Investment Co., Ltd.: Socialized operation of cable groove may be more difficult than that of feeble current pipeline. However,
19、there is no basic distinguish nShenyang Infrastructure Investment Co., Ltd. has accumulated practical experiences on fund collection, leasing rent, managing method and investment retaliation. Regarding whether these experiences can be adopted to the construction of cable groove, the relative personn
20、el of the company expressed that if the confrontation of policy could be put in a good order, operation of these two pipeline grooves has no essential difference: 4Fund preparation and managing methods have no essential difference and can be referred completely 4The only difference is that because p
21、owerful currents can not use the common pipeline groove with feeble current and power cable has to use the special pipeline groove. Therefore, the rent shared by powerful current users is differentiated from feeble pipeline groove which has multiple users. No research has been conducted for the conc
22、rete difference of rent 4Because the operational object is infrastructure, users are all industrial institutions. Thus the effective laws and regulations should be available to restrain using party and managing party of whichever pipeline groove nCity Construction Department of MoC concerns very muc
23、h on measures taken by Shenyang Infrastructure Investment Co., Ltd. and expressed its willing to conduct a research and make summary so as to create a better environment for this synthetic pipeline groove construction and promote this experience to a larger extent in earlier time nSurvey shows that
24、power supply bureau of Shenyang city is also interested in this measure which shared the cable construction burden and its only worry is that whether the renting level and managing method of pipeline groove could be reasonable 第四部分沈阳 Beijing:make good use of Olympic construction opportunity,fulfill
25、the goal of power supply by cable Cable total length is 4583 kilometers around Beijing urban (within forth ring roads), cable coverage ratio is 40%, and 5000 kilometers low voltage cable hang on the sky. It must point out that the materials of middle and high voltage cable underground are all copper
26、, aluminum has not been used, for the coppers load is bigger, and copper is thinner in the same situation. nDuring past five years, the main buyer of cable buried in Beijing is Beijing power supply bureau, and the main capital is city-net reconstruction capital. Beijing city provided capital allowan
27、ce for main roads construction project, the allowance level is about 20%. nAccording to city layout and city-net reconstruction plan, Beijing will “destroy the overhead lines”. But , to compare with the real cable coverage level, this goal seems distant. The forecast of Beijing power supply bureau s
28、hows that this project will expense 21 billion Yuan. nHolding Olympics creates the possibilities for supplying power by cable in Beijing. Till 2008, Beijing will invest 36 billion in electronic-net construction. The main capital comes from electronic price rises, one of its main purpose is to suppor
29、t underground cabling. forth PartBeijing Beijing layout and construction departments are actively exploring the solution of cable construction, and began to make common tunnel experiments, but during the special period of Olympic construction, they chose to increase electronic price to pay power sup
30、ply bureaus check for laying out cable directly nWhen other city governments or power supply bureaus were worry about the cable construction capital, Beijing government also thought how to accelerate cable-buried, they have began to make common tunnel experiments, tried to do and operate cable tunne
31、l by society, and rented to power supply companies and communication companies, in order to partake the burden of the power supply companies 4Beijing zhongguanchun the new technology development district is the experiment unit of Beijing tunnel cable separation construction. It is uniformly develope
32、d by real estate firms, the uniform tunnel cable construction by companies in this district will practice comprehensive tunnel cable style. Construction expenses is taken by real estate developer and is counted in the project. This experiment is not successful, because: 4Government did not give the
33、power to the tunnel cable construction Companies to manage the tunnel cable, so there have no one to maintain and operate the tunnel cable when the project finished. 4Power supply companies are not willing to rent, the common tunnel construction department can do nothing. Because the former can depe
34、nd on electric laws and electric establishment management rules, but the latter have no effective laws or rules to restrict the cooperation with the former companies. nBeijing city layout department still has a optimistic look on tunnel cable separation system, it points out that the experiences fro
35、m the experiment unit shows there must be relevant policies and laws to support the tunnel cable separation system. nAfter successfully applying for Olympic games, Beijing can take special cable capital gathering ways : increasing electric price, which can not by other cities. Although the electric
36、price has the decreased direction around the country, increasing price is nearly impossible. So that, the ways of Beijing gathering money is special in the special period, but It did not show this is the effective measure for us to use. Forth partBeijing Floating electric price+region government fun
37、d, Beijing electric construction funds gathering proposal has been consented during applying for Olympics, overhead cable buried met the unique opportunity Before 2008, overhead cable reconstruction in Beijing will be settled in this way: the municipal government and the district government burden t
38、he responsibility of fund-rising, and the power supply bureau takes the responsibility of construction, the details as following: 4Beijing municipal government will burden the cost of underground cabling in backbone roads(10 roads, more than 300km ) . This sum of capital comes from electric price ri
39、sing (from April 22)., about 3 billion Yuan per year. -By the end of April 2002, after hearing of witnesses, Beijing approved the power supply companies needs, and decide that, from May 22th 2002, per KWH of city electric price will add 5 cents, then the price will increase from original 0.39 Yuan t
40、o now 0.40 Yuan, 2 cents of price rising will be specially use to city overhead cable buried project and other electric reconstruction projects. 2 cents-added can bring extra 0.6 billion electric income per year, power supply companies should make loan with these 0.6 billion capital, it can help the
41、m to collect 3 billion Yuan per year to do the reconstruction projects, -According to Beijing planning committee, electric price rising policy will be effective for one year, whether this policy will continue to next year or not will be depended on the result of witnesses. But Beijing power supply b
42、ureau has confidence to use this policy till 2008. 4The overhead cable needs of cities sight and roads construction is negotiated by region government and power supply companies, region financial government funds will give the allowance. Because the city zones have no specific construction plan, the
43、 jobs are not clear yet. Beijing planning committee introduced that many Beijing city zones can offer the reconstruction expense. Forth partBeijing Although the capital problem has been settled, there are some uncertainties with overhead cable underground during the period of applying for Olympics.
44、If it is lacked the powerful supervision by region government, power supply bureau intents to use this capital to expand the electric capacity. Electric equipments reconstruction by electric allowance including expanding capacity and overhead cable underground, the region government hope to support
45、the latter, and the power supply bureau pay more attention to the former : 4The executives of Beijing power supply bureau said: as a power supply company, the power supply capability is more important that its looking, power supply by overhead cable is more economical, and easier to maintain, if it
46、can be decided by oneself, we are more willing to spend the money on transformer substation and such kind of expanding capacity projects. 4The executives of Beijing planning committee said: overhead cable buried expensed so much money, so the power supply bureau was not willing to take, the governme
47、nt would support ,but financial income is limited, so the electric price rising is approved. 2 cents-added funds is the special funds that be uniquely used in the overhead cable buried project and other power reconstruction projects, so can assure the citys underground projects of the main roads bui
48、lding. As to the city zones overhead cable underground, region government can make decision by themselves to supervise and urge the power supply bureau construction, the fund needs can be assisted by the region government. The potential of the overhead cable buried in some richer city zones should n
49、ot be small. After visiting to layout , city management,construction, planning , power supply department and so on, Sinotrust founded that, although the capital problem has the solution, but power supply bureau still responsible for the overhead cable underground construction by itself, the specific
50、 supervision institutions and rules have not come out yet. If the region layout department and construction department can not restrict and supervise effectively, the construction funds would probably be used more on electric expanding not on overhead cable underground. Forth partBeijing Beijing hav
51、e entered the roads building climax. (from 2003to2008) nBefore 2008, the goal of Beijing roads building is: 4To match the demand of 30 million automobiles. Currently Beijing totally has 18 million automobiles(by the end of 2001) , the other 12 million automobiles need relevant roads building to matc
52、h. 4Average speed in city rush hours arrives at 45km/per hour to 65km/per hour, usually maid roads average speed is 20km/per hour. It will be taken no more than 50 minutes between any two stations when you drive within the city bound, and it will be taken is no more than 40 minutes from beginning st
53、ation to the end station by bus, the currently real level is 2/3 of this hoping level. nIn order to achieve this level, during the following 5 years(2003-2008), Beijing city government and every city zones will carry out large-scale roads building and reconstruction: 4Beijing city: investing 90 bill
54、ion Yuan in high-speed roads, city fast-speed roads, and circle fast-speed communication roads web, railway communication system, these count up to more than 300 KM 4Each city zones government will also invest in city-inside roads reconstruction system on a large scale, for example, haidian district
55、 totally invested 3 billion Yuan to maintain the roads within yuanmingyuan east road, yuanmingyuan wesr road, wanquanhe road, qinghua south road etc, in 2002. Forth partBeijing Roads which need to overhead cable underground construction are:city main roads+maid roads with in city bound+new developin
56、g business district nBeijing city government, city zones government, large-scale developers respectively undertake city overhead cable underground construction 4Beijing city government: planned 10 main roads building, among them, there are more than 200KM road needs the overhead cable buried 4Each c
57、ity zones government , will plan urban roads building step by step, it has a optimistic forecast. 4For large-scale developers, there are 2 large-scale new developing business construction: -To develop Beijing second business road -“chaowai” avenue c district after “wangfujing” and “xidang” business
58、areas, the developer is “qijiankuntai”group belong to “chaoyang”business system -“International communication avenue”. It will be 3.2KMs long, 70 meters high, west-east depth will be100 meters to 300 meters. Total area is 220 hektare, total construction area is about 56 million square meters, total
59、investment is 30 billion Yuan. nNow, there is no specific overhead cable underground layout within city 4Main roads overhead cable underground had gained specific funds support, Beijing city approved that power supply companies could increase electric price, and 4重点道路的架空线入地已经得到明确的资金支持。北京市批准了供电公司电费加价
60、,并指定其中的部分资金需要投入 到这些道路的架空线改造中。 4商业区开发中的架空线入地历来由开发商出资,不存在投入障碍 4由于各个城区的道路建设计划还不明确,城区架空线入地的潜力决定于城区政府对于道路建设的投入和他们对于架空 线入地的重视程度,目前还存在不确定性 第四部分北京 小结 调查表明,无论是政府还是地方供电企业,独自负担都是不可持续的建设方式 在土地储备制度发展好,土地储备潜力大的地区,深圳市的“国土基金”模式值得推广 沈阳市的租让管沟方式仍出于实验和探索阶段,但却是最受欢迎的电缆入地解决方式 综合全国主要城市供电和规划部门的调查,理想的架空线入地方式要满足以下条件 4 把电力电缆建设
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026四川内江市隆昌市普润镇人民政府招聘1人备考题库带答案详解(完整版)
- 2026甘肃阿阳农商开发有限公司招聘备考题库及答案详解一套
- 2026广东深圳理工附中教师招聘9人备考题库附参考答案详解ab卷
- 【高中语文】《石钟山记》导学案统编版高二语文选择性必修下册
- 网站建设服务合同
- 2026江西抚州高新区招聘社区工作者(专职网格员)50人备考题库及参考答案详解(夺分金卷)
- 2026贵州黔南州贵定县面向社会招聘国有企业工作人员11人备考题库及答案详解【夺冠系列】
- 2026甘肃金昌永昌县红山窑镇卫生院招聘1人备考题库及参考答案详解(典型题)
- 2026云南省机关事务管理局抗战胜利纪念堂管理处招聘编外人员3人备考题库附答案详解(培优)
- 2026兴业银行长春分行招聘备考题库完整答案详解
- 《药品经营许可证》注销申请表
- 脑小血管病的影像诊断
- 域虎7汽车使用说明书
- GB/T 5972-2023起重机钢丝绳保养、维护、检验和报废
- LY/T 1646-2005森林采伐作业规程
- 中考古诗词复习专题之苏轼词专题课件
- 基因工程制药-课件
- 承揽合同(合同范本)
- 八年级数学下册导学案全册
- 初中化学教学及复习策略-(夯实基础-合作探究-共同提高)课件
- 登高车安全技术交底
评论
0/150
提交评论