地大《工程概预算与招投标》在线作业一(Big project budget and bidding online homework).doc_第1页
地大《工程概预算与招投标》在线作业一(Big project budget and bidding online homework).doc_第2页
地大《工程概预算与招投标》在线作业一(Big project budget and bidding online homework).doc_第3页
地大《工程概预算与招投标》在线作业一(Big project budget and bidding online homework).doc_第4页
地大《工程概预算与招投标》在线作业一(Big project budget and bidding online homework).doc_第5页
已阅读5页,还剩7页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、地大工程概预算与招投标在线作业一(Big project budget and bidding online homework)14 spring autumn spring 13 13 large engineering budget and bidding online homework one or twoTotal score: 100 test time: -Radio examinationA multiple-choice questionJudgment questionRadio examination questions (7 questions, 28 points)1.

2、 the project construction unit shall apply to the state planning department for the establishment of the project, or when the state makes a decision on the proposed project, it shall be compiled ().A. design budgetB. investment estimateC. revised estimatesD. design budgetFull marks: 42., the actual

3、cost of construction projects is ().A. final account priceB. contract pricePrice tag in C.D. completion settlement priceFull marks: 43. the final accounts of the capital construction projects shall be reflected in the actual expenditures incurred from the preparation to the final acceptance.A. civil

4、 engineeringB. single projectC. whole projectD. part of the projectFull marks: 44. the following items are not direct fees.A. labor costsB. construction machinery use feeC. temporary facilities feeD. two handling chargesFull marks: 45. the contents of final accounts shall not include ().A. completio

5、n settlement reportB. completion settlementC. final account reportComparative analysis of D. project costFull marks: 46., in the construction project of the three stage design, it must be prepared in the technical design stage.A. total budget estimateB. construction drawing budgetC. revised total bu

6、dgetD. construction budgetFull marks: 47., when the general civil engineering projects or small general-purpose factories and other projects, in the preliminary design documents are not yet complete, but also at the stage of the program, unable to calculate the amount of engineering, you can adopt (

7、) the preparation of construction projects estimates.A. budget quotaB. budget estimateC. similar projects pre (decision)D. or more is wrongFull marks: 414 spring autumn spring 13 13 large engineering budget and bidding online homework one or twoTotal score: 100 test time: -Radio examinationA multipl

8、e-choice questionJudgment question, (a total of 7 multiple-choice questions, a total of 28 points.)1. the following items are the principle of budgeting quota.A. comprehensively implements the policies and policies of the party and the state on the prices of basic construction productsB. carry out t

9、he principle of advanced technology and reasonable economyC. embodies the principle of concise and concise, complete project, easy to use and simple calculationD. embodies the principle of seeking truth from facts and conducting on-the-spot investigationFull marks: 42., the current construction and

10、installation costs mainly include.A. direct costsB. equipment purchase feeC. overheadD. taxes and legitimate profitsFull marks: 43. the direct cost of the project consists of ().A. fixed direct feeB. construction management feeC. other direct feesD. other indirect chargesFull marks: 44. Indirect cos

11、ts for construction and installation include ()A. enterprise management feeB. project supervision feeC. construction unit management feeD. feesE. survey and design feeFull marks: 45. the basis for calculating the indirect cost quota is ()A. direct engineering costB. direct feeC. labor costsD.The sum

12、 of labor cost and mechanical costE. material feeFull marks: 46., according to the professional nature of production factors, the budget quota has ()A. quota construction project quotaB. labor quotaC. mechanical quotaD. installation engineering quotaE. material consumption quotaFull marks: 47. () do

13、es not belong to the direct cost of construction and installation projectsA. material two handling feeB. construction machinery overhaul costC. production workers retirement payD. production staff education fundingE. production tool feeFull marks: 414 spring autumn spring 13 13 large engineering bud

14、get and bidding online homework one or twoTotal score: 100 test time: -Radio examinationA multiple-choice questionJudgment questionJudgment questions (a total of 11 questions, a total of 44 points)1. the preparation of the construction organization design or construction plan for the bidding project

15、 is an important basis for the tender offer.A. errorB. correctFull marks: 42. the bid evaluation method shall be determined by the bidding unit and shall be stated in the bid documents.A. errorB. correctFull marks: 43. the contractor may subcontract all the works contracted to the third party in the

16、 name of subcontractingA. errorB. correctFull marks: 44. early settlement of the project can be appropriately increased quotations, in order to facilitate capital turnover, improve the time value of funds.A. errorB. correctFull marks: 45., to reduce the bidding price, we can start with the following

17、 three aspects: reducing the profits of the bid, reducing the management fees and setting the price reduction factorA. errorB. correctFull marks: 46., the domestic non-standard equipment refers to the country has not set standards, the equipment manufacturing plant can not be used in batch productio

18、n process, only according to order requirements, and according to the specific equipment drawings of the equipment.A. errorB. correctFull marks: 47. the bidder may supplement, modify or withdraw the submitted tender documents before the deadline for submission of the tender documents required by the bid documents.A. errorB. correctFull marks: 48. when using the method of table for investment bias analysis, the amount of the project multiplied by the

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论