1、nigeria business and investment summit, london.july 30, 2012. investment opportunities in the nigerian power sectorbyprof. bart nnajihonourable minister of powerthe federal government of nigeria has a “vision 20-2020”: 40,000mw of power by the year 2020current installed capacity of 8,425mw is 20% of
2、 vision targetavailable capacity is only about 50% of installed capacitymassive expansion in generation, transmission and distribution infrastructure (us$100b in 10 years) neededgeneration alone requires over $3.5billion/year for the next 8 yearsgovernment is unable to fund and manage this requireme
3、nt. hence, the decision to reform the sectorfederal ministry of power2nigeria needs to dramatically increase its power generation to unlock the countrys full economic potentialbrazilsouth africamoroccoindiaindonesianigeriapower generation installed capacity1 capacity estimate based on consumption pe
4、r capita average of brazil and south africa and with capacity utilization of 70% to achieve brazil gdp per capita level by 2030 (i.e., $10,000), we will need 135gw1 of capacity to supply a projected 230m nigeriansthis is a 15 times capacity increase from todayit also means we need to build power pla
5、nts at 7 gw/year for the next 18 years. kw / thousand inhabitants3federal ministry of powermonopoly of the nigerian power sector single authority national electric power authority (nepa) was in place up until 2005inefficient management of power supply systemshigh technical and non-technical losses i
6、n the power systemcorrupt public-owned and public-managed power sectorobsolete and inefficient power infrastructure owing to little or no maintenanceminimal investment in powerlow tariff rates with low collection rates federal ministry of power4federal ministry of power5nigeria had one of the lowest
7、 low tariff levels in sub-saharan africa making it uncompetitive for private sector participation. a new cost reflective tariff commenced june 1, 2012 to enable investors recover cost and push the tariff level to an average modelthe objective is to reform the sector and introduce private sector part
8、icipation;creation of an independent sector regulator nigerian electricity regulatory commission (nerc)creation of a initial holding company (power holding company of nigeria) for the nepa assets and liabilitiesunbundling of phcn into successor companies - 6 generating companies, 11 distribution com
9、panies, 1 transmission company, 2 special purpose entities: a liability management company and a bulk traderprivatization of generation and distribution companieslicensing of new entrants into the generation spacefederal ministry of power6vtight coupling of the entire value-chainvincentivizing each
10、link in the value-chain to provide support to all others and motivate them to deliver on expectations vclose monitoring of all projects and performance along the value-chainvtargeting critical changes in ownership and control of the sectorfederal ministry of power7federal ministry of power8long term
11、 goals the nigerian power market to have reached stability for willing-buyer, willing-seller modeto ensure that all aspects and stakeholders of the nesi are working together to deliver quality, reliable and efficient electricity to consumers at reasonable pricespower sector reform roadmap was launch
12、ed by president goodluck jonathan in august 2010: the roadmap lays a definite plan setting timetable and guidelines for the implementation of the epsr act of 2005 reconstitute and strengthen the nigerian electricity regulatory commission (nerc) establish the nigeria bulk electricity trading company
13、(bulk trader) as a credit-worthy off-taker resuscitate the erstwhile comatose rural electrification agency (rea) develop and implement a cost reflective tariffs. june 1st 2012 the revised tariff, multi-year tariff order 2, took effect.fast-track the privatization programme federal ministry of power9
14、privatization of generation/distribution companies in progress:hydro power plants - concessionthermal power plants - privatizationthe transmission company of nigeria on july 23, 2012, signed a management contract with manitoba hydro international of canada who will be responsible for managing the tr
15、ansmission network and the national grid.tremendous response from international investors331 bids submitted, 207 prequalified 25 bids received for the 6 generation companies as at july 17, 2012bids for the 11 distribution companies are expected on july 31, 2012 emergence of winning investor groups i
16、n 4th quarter of 2012federal ministry of power10 investor confidence boosted byexecutive political-will with policy stability and consistencyrule of law (sanctity of contracts)regulatory certainty (regulatory independence)institutional capacity (ministries, departments and agencies driving the chang
17、e)proper project development (proper feasibility/eia studies)ensuring credit worthiness of market participants (bulk trader)long-term planningfederal ministry of power11initial us$1.5 world bank partial risk guarantee for power generationus exim bank has provided an investment window of more than us
18、$1.5bn for investment in the nigerian power sectorus$150 african development bank (afd)overseas private investment council (opic)federal ministry of power12federal ministry of power13general electric mousiemens ag moudaewoo e&celetrobrasedf/etdeinvestors from all over the world have shown commit
19、ment and keen interest in nigerias power sector owing to the clearly defined programme set out by its government-asia (china, india, south korea)-europe (germany, nordic countries, uk)-the americas (united states, canada)-africa-south america (brazil-nigeria, etcthese companies have all signed memor
20、andums of understanding with the nigerian government to support power projects with a new approach of providing equity in the investmentthe presence of a strong, independent regulator: nigerian electricity regulatory commission.institution of a cost reflective tariff effective june 1st 2012 with maj
21、or reviews of multi year tariff order (myto) to occur after every 5 yearsinstitutionalization of international best-practice commercial frameworks in power purchase agreements (ppas), gas supply agreements (gsas) and gas transport agreements (gtas)presence of a creditworthy off taker for power: nige
22、ria bulk electricity trading company plc (also known as the bulk trader) backed by wb partial risk guaranteesfederal ministry of power14federal ministry of power15gas supply/ transport tariffwholesale tariff for powerwheelingchargeretail tariff for powerbillstuos paymentpayment of bills ppa paymentg
23、as supply/transport billgas paymentstransmission billppa agreementlarge potential electricity market: about 167 million people, about 50% below 18 years, (and growing!) with about 60% access to grid electricity. an energy hungry populationnigeria has a broad base and abundance of fuel sources: hydro
24、, natural gas, coal, solar and windgovernment has set an aggressive target build to increase installed capacity to 40,000mw by year 2020gas supply and gas transport to support at least 70% of the new build presents a tremendous opportunity for investors in gas assetsdevelopment of nigerias abundant
25、low sulphur coal reserve for power generation is an area for investmentfederal ministry of power16investment in developing large hydro power as well as small and medium-scale hydro power projects; we have identified 370 sites for development of small hydro projects.renewable energy portfolio standar
26、ds to drive generation from renewable sources such as wind, solar and proposed expansion of the existing 132kv and 330kv power transmission network and development of a 765 kv super grid loop across the country a growing electricity market means an opportunity for the manufacturing of power equipment and componentsfederal ministry of power17development of emergency and off-grid power projects to serve communities without access to the gridpower related training, management consultancy services and capacity development such as legal, power engineering and financial servicesit is estimated tha
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025~2026学年河北省邢台市某校人教版六年级上册12月月考数学试卷【附答案】
- PHP基础面试题(初级岗位专用)
- 2026学年河南省郑州市三年级语文期末通关黑金考题(详细参考解析)详细答案和解析
- PCR检测岗位专业考核试题及详细答案
- 渔塘清淤、晒塘与消毒方案
- 车站值班员安全操作规程
- 肠套叠复位后饮食恢复时序规范共识
- P2P网络借贷基础知识试题(含详细答案)
- Opera浏览器基础实操考核试题(含详细答案)
- 2027届安徽省亳州市亳州市第一中学九年级数学第一学期期末复习检测试题含解析
- 2026年山东省聊城市辅警人员招聘考试题库及答案
- 2027届9月各地高三阅读理解A篇专练答案解析
- 2026年南京新工投资集团有限责任公司人员招聘笔试参考试题及详细答案解析
- 2026年大学《土木工程材料》试题及答案
- 2026中国城市更新案例库白皮书
- 视频监控网络安全风险评估报告
- 森林康养师安全培训测试考核试卷含答案
- 2026秋道德与法治七上 第一单元 少年有梦 复习课件
- 有机核磁共振课件
- 2025年三基理论考核试题库(附含参考答案)
- 电工电子实训室建设汇报
评论
0/150
提交评论