广工,信息检索论文_第1页
广工,信息检索论文_第2页
广工,信息检索论文_第3页
广工,信息检索论文_第4页
广工,信息检索论文_第5页
已阅读5页,还剩25页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、文献调研及综述 课题:基于建筑废弃物产生和利用研究 目录一、文献调研部分············································

2、·······03 1.1切题期刊论文10篇········································

3、83;03-05 1.2学位论文5篇··············································051.2-

4、1国内学位论文3篇··············································05-131.2-2国外学位论

5、文2篇··············································13-14 1.3相关图书2本·

6、············································14-16 1.4相关法律法规等2部···

7、····································16-17 1.5相关标准和专利···········&#

8、183;·······························171.5-1相关标准2条················&

9、#183;·································17-181.5-1相关专利2个·············

10、83;····································18-19 1.6英文文献3篇···········

11、········································ 19-21二、综述部分········

12、·············································· 21 2.0摘要··

13、83;·················································

14、83;21 2.1前言················································&

15、#183;····22 2.2国内外发展···········································&#

16、183;···222.2-1国内·············································

17、;··············22-262.2-2国外··································

18、;·························26-27 2.3结论·······················

19、·······························27 参考文献··················

20、;··············································27-28三、对本课程的教学建议·&

21、#183;·········································28一、 文献调研部分1.1切题期刊论文10篇(建筑废弃物产生及控制4篇,利用研究6篇)(1) 施

22、工现场建筑废弃物减量化措施调查研究 Construction s ction waste minimization measures research【期刊】工程管理学报2010年03期【作者】李景茹; 丁志坤; 米旭明; 王家远; 朱姣兰;【Author】 LI Jing-ru,DING Zhi-kun,MI Xu-ming,WANG Jia-yuan,ZHU Jiao-lan (College of Civil Engineering,Shenzhen University,Shenzhen 518060,China) 【机构】 深圳大学土木工程学院; 【摘要】 文章在总结国内外文献的基础

23、上,通过实地调查和访谈设计了施工现场上采用的建 筑废弃物减量化措施列表;并选择4个具有可比性的工程项目,调查这些减量化措施在现场的执行情况。结合4个案例的建筑废弃物产出量指标,定量地分析了现场减量化措施的有效性。【关键词】 建筑废弃物; 施工现场; 减量化措施; 【基金】 建设部软科学研究项目(06-k7-36);住房和城乡建设部软科学研究项目 (2009-K4-17)(2) 建筑施工废料的数量、组成与产生原因分析 Construction waste quantity, composition and causes of【期刊】华中科技大学学报2000年12期【作者】 吴贤国; 李惠强; 杜

24、婷; 【Author】 Wu Xianguo Assoc. Prof.; College of Civil Eng., HUST, Wuhan 430074, China. Li Huiqiang Du Ting【机构】 华中理工大学土木工程学院; 【摘要】 建筑施工废料主要由碎砖、混凝土、砂浆、桩头、包装材料等组成 .废料数量因施工及管理情况不同 ,各建筑工地差异很大 ;建筑施工废料产生于施工的全过程 ,加强对建筑活动全过程的综合管理和废料在本工程中进行回收利用 ,是减少废料数量的有效途径 . 更多还原【关键词】 建筑施工; 废料; 组成; 数量; 【基金】 湖北省自然科学基金资助

25、项目 (99J0 36 )(3) 建筑废弃物产出水平影响因素分析 Construction waste output level Factors【期刊】华中科技大学学报(城市科学版) 2010年03期【作者】 李景茹; 丁志坤; 米旭明; 王家远; 【Author】 LI Jing-ru,DING Zhi-kun,MI Xu-ming,WANG Jia-yuan(School of Civil Engineering,Shenzhen University,Shenzhen 518060,China)【机构】 深圳大学土木工程学院; 【摘要】 本文用建筑材料转变为废弃物的比例(废料率)反映施工

26、活动的建筑废弃物产出水平,通过实地调查和问卷调查获得了5种建筑材料的废料率。通过对废料率分析发现,建筑用途、材料类型、施工企业资质和管理水平对建筑废弃物产出水平有明显影响,而建筑面积对建筑废弃物产出水平没有显著影响,结构形式对建筑废弃物产出水平的影响不能确定。【关键词】 建筑废弃物; 废料率; 影响因素; 调查;【基金】 建设部软科学研究项目(06-k7-36);住房和城乡建设部软科学研究项目 (2009-K4-17)(4)工程建筑垃圾处置的调查和分析 Engineering and construction waste disposal research and analysis【期刊】中国

27、资源综合利用 2009年06期 【作者】 罗清海; 陈晓明; 王衍金; 凌啸; 【Author】 Luo Qinghai, Chen Xiaoming, Wang Yanjin, Ling Xiao (The School of Urban Construction, University of South China, Hengyang 421001, China)【机构】 南华大学城市建设学院; 【摘要】 在实际调查几处典型工程的基础上,分析了不同工程建筑垃圾排放量及其成分的差异性,建筑垃圾的成分和比例与建筑物类型、工程性质、建筑年代、地方习俗、当地资源、经济水平等等有关。讨论了建筑垃圾对

28、环境的日益严峻影响。对城市建筑垃圾的减量、资源化、无害化处理提出了建议。 【关键词】 建筑垃圾; 成分分析; 环境危害; 减排; (5)我国建筑垃圾的现状与综合利用Our status and utilization of construction waste【期刊】施工技术1999年05期 【作者】 陆凯安; 【Author】 Lu Kaian【机构】 北京中建建筑科学技术研究院; 【摘要】 分析我国建筑垃圾的现状和组成,介绍了美日等国家有关处理建筑垃圾的一些方针政策、先进经验和处理方法,以及我国在这方面所做的一些尝试。【关键词】 建筑垃圾; 固体废弃物; 综合利用; 垃圾处理;

29、再生资源; 环境污染; (6)建筑废弃物资源化多级利用模式研究Construction waste recycling and utilization of the multi-level【期刊】建筑经济2009年06期【作者】 曹小琳; 刘仁海; 【Author】 CAO Xiaolin, LIU Renhai【机构】 重庆大学建设管理与房地产学院; 【摘要】 借鉴国外建筑废弃物资源化再利用方面的经验和作法,在分析当前我国建筑废弃物回收利用现状和存在主要问题的基础上,构建了建筑废弃物资源化多级利用模式,并提出了相应的实施保障措施。【关键词】 建筑废弃物; 资源化再生; 多级利用;(7)建筑废

30、弃物在建筑材料中的应用Construction waste in building materials applications【期刊】山西建筑2010年06期【作者】 师文婷; 【Author】 SHI Wen-ting【机构】 太原理工大学环境工程学院环境工程系; 【摘要】我国建筑材料产品及技术必须顺应循环经济发展要求,提高建材产品中再生资源的利用量,大量消化吸收各种废弃物,进行/减量化、再利用、资源化0的技术改造。建筑废弃物由于其阶段性的特点通常不太被重视,但是其时间性、空间性和持久危害性的特点却在城市建设中愈来愈突出。指出建筑废弃物的循环使用是我国建筑业落实科学发展观,实施节能减排,走

31、可持续发展之路的重要方面,结合我国国情和资源节约型、环境友好型社会建设的总体要求,阐述了主要建筑废弃物现状及综合利用现状,以促进资源节约。 【关键词】 节能减排; 建筑废弃物; 研究; 应用(8)建筑垃圾资源化关键技术与产业化Construction waste resources and industrialization of key technologies【期刊】建筑科技2007年06期【作者】 阎培渝; 【机构】 清华大学土木水利学院建材研究所 所长; 【摘要】 当前面临的问题与挑战城市建设发展过程中,建设、环保、资源三者的矛盾日趋尖锐。一方面,飞速发展的大规模城市建设对建

32、筑材料的需求十分庞大;另一方面,天然资源日渐短缺,保护环境的要求增加了对使用天然资源的限制。【关键词】 建筑垃圾; 垃圾资源化; 天然资源; 城市建设; 再生骨料; 问题与挑战; 再生利用; 旧建筑; 废弃混凝土; 砂石料; (9)建筑垃圾的循环利用【期刊】建材发展导向2005年01期【作者】 王武祥; 【机构】 中国建筑材料科学研究院 北京100024; 【摘要】 本文简要介绍了国内外建筑垃圾的排放与利用状况、回收和再生技术、循环利用经济性和政策,指出大力开展建筑垃圾的回收、再生和利用,是建材行业实现循环经济的重要内容之一,资源化再生建筑垃圾,不仅能有效地提高资源、能源利用效率,而且可保护生

33、态,促进经济发展。本文还提出了促进我国建筑垃圾的循环利用的建议。 【关键词】 建筑垃圾; 循环经济; 循环利用; 再生;(10)国外建筑垃圾再生骨料的应用情况及在国内市场的应用前景分析Foreign construction waste recycled aggregate application situation and prospects in the domestic market analysis【期刊】中国环保产业 2005年07期【作者】 陈刚; 苏磊; 陈扬; 【Author】 CHEN Gang, SU Lei, CHEN Yang【机构】 沈阳环境科学研究院; 中

34、国环境保护产业协会; 沈阳环境科学研究院 辽宁沈阳110016; 北京100835; 辽宁沈阳110016; 【摘要】 本文介绍了建筑垃圾再生骨料在国外的应用情况,并分析了其在国内市场的应用前景。 【关键词】 建筑垃圾; 再生骨料; 天然骨料1.2学位论文5篇(国内3篇,国外2篇)1.2-1国内学位论文(1)珠三角地区建筑废弃物调研与对策分析【中文题名】珠三角地区建筑废弃物调研与对策分析【英文题名】A Survey Analysis and Countermeasures of C&D Waste Problem in South China【作者中文名】周佳文【导师】张雁【

35、学位授予单位】华南理工大学【学科专业名称】结构工程【学位年度】2011【论文级别】硕士【网络出版投稿人】华南理工大学【网络出版投稿时间】2011-06-01【关键词】建筑废弃物;减量化;资源化;问卷调查;案例研究【英文关键词】building waste; reduction; resource; questionnaires; Case Study【中文摘要】 我国的城市化建设正处于高速发展期,建设重速度而忽视资源节约和环境保护,导致建筑废弃物的总量急剧上升,建筑废弃物现已占到城市固体废弃物总量的40%,城市化的可持续发展面临严峻挑战。 目前,国内学者对建筑废弃物产生和处理的系统性分析较少,

36、重理论研究,而通过问卷调研和案例跟踪的实用性研究取得的成果比较欠缺。本文借鉴国外建筑废弃物管理策略,提出了我国建筑废弃物减量化和资源化管理策略的优先级;与国外建筑废弃物处理现状和法律法规进行比较,肯定了我国近十年来取得的成绩,同时也明确指出我国建筑废弃物的减量化和资源化还有很长的路要走。为了解当前建筑废弃物存在问题、影响因素和对策措施三大方面的状况,本文对问卷内容采用5级选择设计,通过Cronbach' s a系数法对问卷进行信度检验;选取具有丰富从业经验的建筑业管理和技术人员作为调研对象,应用Excel和SPSS软件对问卷进行统计分析,了解建筑物各分部分项工程废料产生现状,得到建设过

37、程中废弃物回收用方面的第一手资料,分析指出存在问题、原因,提出解决措施。调研发现,新建工程中分部上程应该重点关注装饰上程和临建上程,分项上程则需重点控制砌体上程和模板工程;对于拆除工程,需重点提高混凝土块、碎砖块、瓦砾和碎玻璃的回收利用率。在认识原因调研中,对14个影响因素重要性进行排序,发现关键影响因素有“政府对建筑垃圾处理的政策、场施工管理的水平低,技术、资金支持不够”、“施工现场缺乏建筑废料管理计划”、“现造成材料浪费”等。对策研究表明,积极有效的对策是过程中,采用新技术工艺有效降低建筑废料产生”、“政府完善相关政策和法规,“在施工加大对建筑废物料的监管力度,对不合要求的相关单位和企业加

38、大处罚力度”、“政府给予补贴,促进不同类别的建筑废物料的重复利用或回收”等。 案例研究中,本文选取了广州市新建、翻新改造和拆迁工程作为建筑工程实例,通过现场直接观察法和访谈法,对现场废弃物进行记录,指出广州市施工房屋工程每年由于散落的混凝土和砂浆未进行及时收集利用,造成建筑材料直接转化为建筑废弃物的量就高达65万多t;为此,结合问卷,提出经济补偿标准,能有效促进现场建筑废弃物的减量化;拆除工程中,建议政府完善相关政策和法规,严格监管,鼓励和支持建筑废弃物搬运再生公司的建立,理顺建筑废弃物资源化产业链,使建筑废弃物变废为宝。【英文摘要】China's urbanization const

39、ruction is in rapid development, construction heavy speed while ignoring resource conservation and environmental protection , leading to a sharp increase in the total amount of construction waste , municipal solid construction waste now accounts for 40% of total waste , urban of sustainable developm

40、ent face serious challenges.    At present, the domestic scholars construction waste generation and treatment of systemic analysis less heavy theoretical research, and through the questionnaire survey and case tracking utility lacks research achievements . This construction waste

41、 management strategies from abroad , made of construction waste minimization and resource management policy priorities ; construction waste processing and foreign laws and regulations, to compare the status and affirmed the achievements of our country over the past decade , also clear that China'

42、;s construction waste minimization and recycling is still a long way to go.To understand the current building waste problems, influencing factors and countermeasures three aspects of the situation , the paper questionnaire design using five selected by Cronbach 'sa coefficient method questionnai

43、re reliability test ; selection with rich experience in building business management and technical personnel as the research object , the application of questionnaires Excel and SPSS software for statistical analysis, to understand each part of the project building waste generation status quo, to ge

44、t the process of building waste recycling with first-hand information, analysis indicates the presence problems, causes , propose solutions . Research found that the new construction segment on the process should focus on the decoration process and the temporary building on the way , made the way yo

45、u need to focus on the control of masonry on the process and template projects ; For demolition, must focus on improving the concrete blocks , broken bricks, rubble and broken glass recycling rate .In recognition of the reasons research, the importance of influencing factors on the 14 sort key facto

46、rs found to have "the government 's policy on construction waste , low level of field construction management , technical , financial support is not enough ," " lack of construction site construction waste management plans, "" now causing material waste "and so on .

47、 Countermeasure Research shows that positive and effective response is the process, the introduction of new technological processes effectively reduce construction waste generated "," government improve the relevant policies and regulations , " increase in construction supervision of

48、construction waste material , the relevant units of non-conforming and enterprises to increase penalties "," government subsidies to promote different types of construction waste materials to be reused or recycled , " and so on.   Case study, this paper selects Guangzho

49、u New, refurbishment and demolition works as a construction example, through direct on-site observation and interviews, on-site waste records indicate Guangzhou every year due to construction of housing projects scattered concrete and mortar not timely collection and utilization , resulting in build

50、ing construction waste directly into the amount of up to more than 650,000 t; this, combined with questionnaires , proposed economic compensation standards, can effectively promote the site construction waste minimization ; demolition recommended that the government improve the relevant policies and

51、 regulations , strict supervision , encouragement and support removal of construction waste recycling companies to establish , streamline construction waste recycling industry chain, so that construction waste turning waste into treasure.(2)建筑废弃物减量化行为研究【中文题名】建筑废弃物减量化行为研究【英文题名】Behavior of constructio

52、n waste minimization【作者中文名】谭晓宁; 【导师】金维兴; 【学位授予单位】西安建筑科技大学【学科专业名称】结构工程【学位年度】2011【论文级别】博士【网络出版投稿人】西安建筑科技大学【网络出版投稿时间】2011【关键词】建筑废弃物; 减量化; 决定因素; 管理模式;【英文关键词】Construction waste; reduction; determinants; management model;【中文摘要】 建筑废弃物减量化行为是指在建设活动全生命周期内,通过从业人员减少建筑废弃物产生和废弃物直接回用等主动行为,达到节约工程材料、提高工程建设质量、降低环境不利影

53、响等目的的有意识活动。目前,关于建筑废弃物的相关研究主要集中在建筑废弃物减量化和资源化的技术、管理方法以及相关机制上。除技术外,从宏观政策和管理对策角度研究较多,而对建筑废弃物产生的主体建筑企业以及从业人员行为的研究较少。对此,本文在实证调查的基础上,运用环境行为理论和组织行为理论,从微观到宏观,从个体减量化行为、组织内部环境和社会环境三个层面,对建筑废弃物减量化行为、废弃物减量化动力机制以及管理模式进行了深入研究。主要研究成果包括:(1)通过实证调查和统计分析,发现影响建筑废弃物减量化最重要的因素是从业人员的环保意识、施工监管力度和法规制度的健全程度。在促进减量化的措施方面,关键措施是健全法

54、规及相关税费政策。而影响建筑废弃物减量化的因素可以归结为三个层面,即从业人员的环境保护意识、对废弃物减量化的态度和认识;企业与废弃物减量化相适应的管理措施、管理制度、技能培训和工作氛围;政府的法规、政策和措施。(2)从环境行为理论的视角,对建筑废弃物减量化行为内在影响因素进行了系统识别,确定了影响减量化行为的主要决定因素,揭示了这些因素对于减量化行为的作用方式和减量化行为发生的内在机理,建立了减量化行为决定因素模型。研究结果表明,减量化态度受到价值观的持久影响,两者构成个体减量化行为的原动力。主观规范和控制观等个性因素是导致不同个体减量化行为差异的主因。认知因素可以内化为减量化态度和意识,对减

55、量化行为产生作用。情境因素不仅影响行为人态度和个性因素,而且可以直接作用于行为本身。促进个体废弃物减量化行为的有效途径是,改变外部促进因素;建立良好的情境条件;认知因素的积累;直接影响个体的态度和个性因素。(3)依托组织行为理论,深入研究了领导行为、群体因素、组织激励和组织文化对个体减量化行为的影响,建立了企业建筑废弃物减量化动力模型,分析了减量化动力机制的形成过程。结果表明,企业员工实施废弃物减量化的动力来源于良好的企业文化对员工价值观的塑造,企业内部管理制度、积极的人际影响、激励机制和领导行为对减量化态度和主观规范的强化,而企业本身的动力来自于外部约束和引导机制的建立,以及对实行废弃物减量

56、化带来的经济、社会和环境效益的认同。(4)通过策略分析确定了政府经济政策的选择是对实施废弃物减量化增加的成本进行补贴。通过费用效益分析得出确保废弃物减量化经济有效性的条件是,将相当于节省的建筑废弃物处置费用和环境治理费用,以补贴的形式纳入减量化的收益,有利于达到最优社会削减率。研究还提出了建筑废弃物减量化管理新模式以及相应运行机制。论文还对促进企业建筑废弃物减量化,以及建立与之相适应的政府管理体制和运行机制提出了相应的措施和政策建议,这些研究成果对于推动我国建筑废弃物实现源头削减具有重要的理论和实践参考价值。【英文摘要】Construction waste minimization behav

57、ior refers to the entire life cycle of building activities by employees to reduce construction waste generation and waste reuse and other proactive behavior directly , to save construction materials, improve construction quality , reduce negative environmental impacts the purpose of conscious activi

58、ty . Currently, about construction waste related research focuses on the construction of waste minimization and recycling technologies, management methods and related mechanisms . In addition to technology, policy and management responses from the macro perspective more, while the main body of the b

59、uilding waste generation - building businesses and employing fewer behavioral research . In this regard , this paper empirical investigation , based on the application of environmental behavior theory and organizational behavior theory , from micro to macro , from individual behavior reduction , env

60、ironment and social environment within the organization three levels of construction waste minimization behavior , waste minimization and management mode dynamic mechanism conducted in-depth research . Key findings include: ( 1 ) through empirical surveys and statistical analysis, found to affect th

61、e construction waste minimization is the most important factor in the environmental awareness of employees , construction supervision and regulatory system soundness . In promoting the reduction of the measures, the key measures are sound policies and regulations and related taxes . The impact facto

62、rs of construction waste reduction can be attributed to three levels , namely environmental awareness of employees , the attitude of waste minimization and awareness ; enterprises and waste reduction management measures adapted to manage system , skills training and work atmosphere ; government regu

63、lations , policies and measures . ( 2 ) environmental behavior from the perspective of the theory of construction waste minimization behavior intrinsic factors affecting system identification to determine the effect of reduction of the main determinants of behavior , revealing the behavior of these

64、factors on the mode of action of reduction and the intrinsic behavior reduction mechanism, a reduction behavioral determinants model . The results show that the reduction attitudes lasting impact by values , which constitute the driving force behind the behavior of individual reduction . Concept of

65、subjective norms and control factors such as personality reduction leads to different individual differences in behavior the main reason. Cognitive factors can be internalized into minimization attitudes and awareness, an effect on the reduction behavior . Situational factors influence behavior not

66、only the attitudes and personality factors , and can act directly on the act itself . Promote individual waste reduction behavior is an effective way , changing external stimulus ; establish a good situational conditions ; cognitive factors of accumulation ; direct impact on the individual's att

67、itude and personality factors . ( 3 ) relying on organizational behavior theory , in-depth study of leadership behavior, group factors, organizational incentives and reduction of organizational culture on individual behavior, establish a dynamic corporate construction waste minimization model to ana

68、lyze the dynamic mechanism of reduction formation . The results showed that employees implement waste reduction power comes from good corporate culture in shaping values to employees , internal management system, positive interpersonal influence , incentives and leadership on the attitude and subjec

69、tive norm minimization strengthening while enterprises under its own power from the external constraints and guide the establishment of mechanisms for the implementation of waste reduction and the economic , social and environmental benefits of recognition. ( 4 ) through policy analysis to determine

70、 the choice of the government's economic policy is implemented waste reduction increased costs to be subsidized. Obtained through cost -benefit analysis to ensure that the economic effectiveness of waste minimization condition that would be equivalent to the construction waste disposal cost savi

71、ngs and environmental management fees to the form of subsidies included in the reduction of income , is conducive to optimal social reduction rate . The study also proposes construction waste minimization new management model and the corresponding operation mechanism. Paper also promote enterprise c

72、onstruction waste minimization, and establish corresponding government management system and operational mechanism put forward corresponding measures and policy recommendations , these findings promoting China's construction waste to achieve source reduction has important theoretical and practic

73、al reference value.(3)建筑废弃物再生利用的调查与研究【中文题名】建筑废弃物再生利用的调查与研究【英文题名】Construction waste recycling Investigation and Research【作者中文名】张志红; 【导师】孙跃东; 【学位授予单位】山东科技大学【学科专业名称】结构工程【学位年度】2006【论文级别】硕士【网络出版投稿人】山东科技大学【网络出版投稿时间】2006【关键词】建筑废弃物; 现状调查; 再生利用; 技术性; 经济性; 管理模式; 资源化; 【英文关键词】Construction waste; Survey; recycling; technical; economy; management; resource【中文摘要】【英文摘要】建筑业作为国民经济的支柱产业之一,虽然得到了突飞猛进的发展,但相应的在建筑物的建设、维修、拆除过程中产生的建筑废弃物也空前增加,据不完全统计,其数量已占到城市垃

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论