版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、urging establishment of an L/C extension of the L/C amendment to the L/C check the L/C GW1urging establishment of an L/C 执事先生:执事先生: 关于贵方按关于贵方按123123号订单签订的号订单签订的168168号合同项下的号合同项下的2,0002,000台海尔空台海尔空调,我们想提请贵方注意的是至今还未收到与此相关的信用调,我们想提请贵方注意的是至今还未收到与此相关的信用证。证。 请贵方尽力速开信用证请贵方尽力速开信用证以便我们能够顺利执行合同。以便我们能够顺利执行合同。
2、为了避免随后的改证,为了避免随后的改证,请务必做到信用证的相关规定与请务必做到信用证的相关规定与168168号合同完全一致。号合同完全一致。 期待佳音。期待佳音。 谨上,谨上, 克拉克克拉克 ABCABC有限公司有限公司 Dear Sir or Madam: With reference to your order No.123 for 2000 sets Haier Brand Air Conditioner under S/C 168, wed like to invite your attention to the fact that we havent received your L/
3、C until now. Please do your utmost to rush the L/C establishment so that we can execute the contract smoothly. In order to avoid subsequent amendments, please see to it that the L/C stipulations are in exact conformity with the terms and conditions of the S/C 168. We hope to receive yur good news so
4、on. Yours Sincerely,GW2extension of the L/C 执事先生:执事先生: 关于关于2 2,000000台电脑的台电脑的123123号订单项下的号订单项下的67886788号信用证已号信用证已收到,甚为感谢。收到,甚为感谢。 由于我方供货商的延误,我们无法在四月底前运出货由于我方供货商的延误,我们无法在四月底前运出货物,对此深表歉意。物,对此深表歉意。 今日特致此函请求贵方延展信用证中的装运期和有效今日特致此函请求贵方延展信用证中的装运期和有效期分别为期分别为5 5月月1010日和日和5 5月月3131日。日。 感谢贵方对此事的理解与合作。感谢贵方对此事的理解
5、与合作。 谨上,谨上, 克拉克克拉克 ABCABC有限公司有限公司 Dear Sir or Madam: We acknowledge with thanks the receipt of your L/C No.6788, covering your Order No.123 for 2000 sets computers. We are sorry that we will be unable to ship the goods by the end of April due to delay of our suppliers. We are writing to you today to
6、 ask you to extend the shipment date and validity date to May 10 and May 31 respectively. Thank you for your cooperation and understanding in this matter. Best regards GW3amendment to the L/C 执事先生: 我们已收到由也门建设与发展银行开立的金额为13720英镑的关于16000打弹力尼龙丝袜的第145/88号信用证。审核后,我们发现不允许转船和转运。 由于到你港的直达船稀少,我们不得不经常在香港转运。至于分
7、运,将手头的货马上运出而不用等整批货一起运是符合我们双方的利益的。 因此,我们今天传真你方请求修改信用证如下: “允许转船和分运” 如你方能设法尽快传真修改,我们将非常高兴,因为货物已备妥多时。 诚挚问候 Dear sirs, We have received your L/C No.145/88 issued by the Yemen Bank for Reconstruction & Development for the amount of 13720 covering 16000 dozen Stretch Socks. On purpose, we find that tra
8、nshipment and partial shipment are not allowed. As direct steamers to your port are few and far between, we have to ship via Hongkong more often than not. As to partial shipment, it would be our mutual benefit because we could ship immediately whatever we have on hand instead of waiting for the whol
9、e to be completed. We, therefore, are faxing this afternoon, asking you to amend the L/C to read:TRANSHIPMENT AND PARTIALSHIPMENT ALLOWED. We shall be glad if you see to it that amendment is faxed without any delay, as our goods have been packed ready for shipment for quite some time. Yours faithful
10、ly, urging establishment of an L/C 请尽快开出信用证以便于我们能在规定的期间内执行订单。Please do your utmost to expedite its establishment so that we may execute the order within the prescribed time. 由于你方已有数次延误开证,希望这次勿再耽搁。 As you have delayed opening Ls/C several times, we hope you will not delay again this time.请按合同价格迅速开证,否
11、则不能申请出口许可证。Please open the Letter of Credit promptly at the contract price, or we can not apply for export license.请你方注意这样一个事实,信用证的有效期已临近。请尽力完成装运不得有进一步的延误。We would like to draw your attention to the fact that the validity of the L/C is drawing near. Please do your utmost to effect shipment without f
12、urther delay. 请立即开出信用证,以便我们安排装船。Please open your L/C immediately to facilitate our shipping arragement. extension of the L/C 由于最近工厂发生火灾烧毁了全部库存,已不能按照原安排交货。请将44779 号信用证交货期和有效期分别延至4月30日和5月15日。Because of the recent fire in the factory,all the socks were destoryed. In this case, we cannot make shipment a
13、s arranged before. Please extend the date of shipment and the expiry date of L/C No.44779 to 30 April and 15 May respectively.很遗憾,由于我供货商的延误,我方无法在本月底前将货物备妥。We are sorry that owing to some delay on the part of our suppliers, we are unable to get the goods ready before the end of this month.由于本月没有直达货轮,
14、我方要求延长第由于本月没有直达货轮,我方要求延长第2526号信用证号信用证的有效期至七月三十一日。的有效期至七月三十一日。 As there is no direct steamer available this month, we should like to request you to extend the validity of your L/C No. 2526 to July 31.amendment to the L/C请对信用证速作修改。Please rush the amendment to the L/C.请将信用证上的金额修改为“允许5%上下幅度”。Please amen
15、d the amount of the L/C to read“5% more or less allowed”.请将信用证改为允许分批装运。Please amend the credit as allowing partial shipments. 请查阅你方第2003号信用证,该信用证规定不允许转。We refer you to your L/C No.2003 which prescribes that transshipment is not allowed.第5466号信用证规定两批装运,每月一次,每次数量相等,而1101号合同规定9月1日前装运,请对信用证做相应修改。Your L/C No.5466 calls for shipment in two equal monthly lots while S/C No.1101 stipulates shipment in a single lot to be made
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 我国侵权责任制度
- 打包及岗位责任制度
- 执纪办案安全责任制度
- 承诺责任制度
- 拼装部安全生产责任制度
- 接访五包责任制度
- 收费站疫情防控责任制度
- 政府档案员岗位责任制度
- 教师24小时责任制度
- 教育均衡领导责任制度
- 电厂工程热工专业施工方案
- DB32T 4111-2021 预应力混凝土实心方桩基础技术规程
- 自然灾害情况统计制度解读课件
- xx银行安防监控工程施工方案与维保方案
- 2022年云南省特岗教师招聘考试《初中化学教师专业课考试大纲》
- 胆囊切除胆总管切开取石护理查房
- 压力管道无损检测通用实用工艺
- 基于MATLAB的数字PID直流电机调速系统
- 五四制新青岛版五年级科学下册第二单元《4我们的脑》课件
- 四川省普通高等学校毕业就业协议书样本
- 《口腔检查》PPT课件(人卫版)
评论
0/150
提交评论