




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、1Total Productive MaintenanceManufacturing 生产部门2 ProcessCertificationTPMQCPCRoot Cause /CorrectiveActionSet-UpReductionStandardWorkMistakeProofingMarketFeedbackAnalysis6SQualityClinic ActivityTotal Productive Maintenance ACE Manufacturing Qualifying Level 3 程序验证程序验证全面性生产全面性生产维护维护质量诊断程序质量诊断程序图表图表根本原因
2、根本原因修正行动修正行动减少生产减少生产准备准备标准化标准化作业作业防误措施防误措施市场反馈市场反馈分析分析6S质量诊断质量诊断行动行动全面生产性维护 ACE 生产部门合格水平 4Total Productive Maintenance is an equipment management strategy that improves equipment efficiency.全面生产性维护是一种设备管理策略以提高设备效率。Or, in other words.Treating the equipment like it is your own!或者,换句话说.对待设备就象它是你自己的一样!T
3、PM 全面生产性维护5TPM Key Concept TPM的重要概念 Left neglected. Equipment Breaks Down 如果不重视设备很快就会坏TPMs focus is to prevent problems before equipment breaks.TPM 的焦点是要在设备出故障以前以前防止问题出现。In the past, maintenance focusedon fixing equipment after it broke.过去,维护工作总是集中在设备坏了以后对其进行修理。6Total Productive Maintenance is a New
4、 Way of Working全面生产性维护是一种全新的工作方式全面生产性维护是一种全新的工作方式7Hidden Defects隐藏的问题隐藏的问题Failures故障故障Wear, play, slackness, leakage, dust, dirt, corrosion, deformation, adherence of raw materials,surface damage, cracking, overheating, vibration, noise, and other abnormalities.磨损、松驰、泄露、灰尘、污垢、腐蚀变磨损、松驰、泄露、灰尘、污垢、腐蚀变形、
5、原材料粘黏、表面磨损、裂缝、过热形、原材料粘黏、表面磨损、裂缝、过热、震动、噪音及其它不正常现象。、震动、噪音及其它不正常现象。Tip of the Iceberg冰山的顶端8Typical Causes of Machine Breakdown 典型的机械故障原因Failure toadd oil.没有加油Grit and chipsin revolvingor sliding parts旋转或滑动零件中的砂砾和碎片Contaminationof sensors,contacts and Connectors传感器、触敏器、连接器污染Dirt and dust on cooling fan冷
6、却风扇上有灰尘和污垢ComponentFailure组件失灵I wonder whatsgoing to fail next?我在想下面还会出什么我在想下面还会出什么问题呢?问题呢?9TPM Techniques TPM技术Normal operating Range正常操作范围正常操作范围Danger!危险!危险! Simplify and Document TPM Activities. 简化并记录TPM行动 Use visual techniques to indicate whats right / whats wrong. 运用直观技术来演示什么是 对的/什么是错的。PM Compl
7、eted? 生产性维护完成了吗?Pressure gage 压力计Sight glass 视镜Arrows for motor rotation and fluid circulation马达旋转和润油指示箭头markings for spare parts and fluids. 备用零件和润滑油记号Making PM devices more accessible. 使生产性维护设备更容易获得 Filters, fittings made more accessible 过滤器、各种装置Transparent panels to facilitate inspection 明了易读的仪表盘
8、便于检查10TPM Benefits TPM的益处 Reduced maintenance costs 减少维护费用 Breakdown maintenance is 10 times more costly than planned maintenance 故障维修费用是有计划进行维护费用的10倍以上 Enhanced safety 提高安全性 Find exposed wires, open belts, missing guards, loose hardware 发现暴露在外的电线、松开的安全带、缺少防护、松开的部件 Reduced waste 减少浪费 Prevents loss o
9、f lubricant, compressed air 防止润滑油、压缩空气的浪费 Improved quality 提高品质 Equipment more capable of holding tolerance 设备抗性增强 Less down time, longer life缩短停工时间,寿命更长1112 TPM Qualifying ActivitiesACE Element Awareness TrainingLock Out/Tag Out awareness training available for all employees (with annual refresher)
10、Operators of high hazard equipment informed of machine specific hazardsAssessment of machine specific safeguarding (SP-008) issuesLock Out/Tag Out Equipment AvailableReview OnlyAction ItemsAssess all Equipment A, B & CImplement written Lock Out/Tag Out procedureWalk around safety check on 100% o
11、f A/B equipmentPM Schedule for 100% of A/B equipmentCleaning on 100% of A/B equipmentTrack downtime historyTop ten downtime equipment identified1212 项TPM 合格行动ACE 内容认知培训锁定/标识 认知培训,针对所有员工(每年的复习进修者)告知高危险设备操作员有关机器的详细危险机器的特殊防护措施(SP-008)问题评估可用的锁定/标识设备仅用于检查行动内容评估所有 A, B & C类设备完成写好的锁定/ 标识程序所有 A/B类设备的安全巡
12、查所有 A/B类设备的生产性维护进度表清洁所有A/B类设备追溯停工历史确认的十大停工设备13PURPOSE of Lockout/Tagout锁定锁定/标识的目的标识的目的Lockout/Tagout Review:锁定锁定/标识检查标识检查14Lockout Device 锁定设备A lock or other device that utilizes a positive means, to hold an energy isolating device in a safe position and thereby preventing the energizing of a machin
13、e or piece of equipment.一把锁或其它设备,用于使电源设备隔离装置处于一安全的状态,以防止机器或设备的一部分带电。Lockout/Tagout Review:锁定锁定/标识检查标识检查15Tagout Definition 标识的定义 The process of securely fastening a tag or prominent warning sign to indicate that both the energy isolating device and the equipment being controlled, be operated. 是将一标签或
14、明显的警告标志紧附于设备上 以表明不能不能对电源隔离设备及处于控制下的 设备进行操作。 The tag will also include the name of the person who locked out the equipment.该标签应有锁定该装置的 人的名字。Lockout/Tagout Review:锁定锁定/标识检查标识检查16NEVER ACCEPT LOCKOUTS KEYS FROM ANYONE.决不要从它人处接受锁定设备的钥匙。决不要从它人处接受锁定设备的钥匙。THE ASSOCIATE RESPONSIBLE FOR APPLYING THE LOCK OR
15、TAG IS THE ONLY PERSON AUTHORIZED TO REMOVE THE LOCK OR TAG.唯唯有经授权负责运用锁或标签的人员可以拿掉该锁或标签。有经授权负责运用锁或标签的人员可以拿掉该锁或标签。Lockout/Tagout Review:锁定锁定/标识检查标识检查17ACTION ITEM 1: Assess All Equipment行动内容行动内容1:评估所有设备:评估所有设备 By “Equipment” we mean any machine that was a capital expense and has a depreciative value.
16、Or any machine that is important to your cell. 所谓“设备”是指任何花费了资金并会贬值的机器。或任何对你的部门重要的机器。We Categorize all Equipment based on how Unique and Critical it is to ensure we focus attention on the right equipment first. Pay special attention to bottleneck equipment.我们根据设备的独特性和重要性对所有设备进行分类,以确保我们的注意力优先放在正确的设备上。
17、对瓶颈设备给予特殊的关注。Equipment设备设备18 Critical equipment for which an alternate machine is not feasible, because:不能用其它设备替代的关键设备,因为: No alternate exists, or 无替代设备,或 The alternate is usually unavailable due to utilization, or 该替代设备通常正被使用而不能获得,或 It would be too costly/time consuming to transition to the alterna
18、te 太贵/需花太多时间进行替换 Equipment for which it is relatively easy to find a replacement or alternate相对容易用其它设备替代的设备 Includes most off-the-shelf equipment 包括最常用的设备 Typically cost $2,500 费用低于$2,500 Standard spare parts (like drive motors) are available off-the-shelf 可获得的常用标准备件(如驱动马达) All other equipment/machi
19、nes所有其它设备/机器ACTION ITEM 1: Assess All Equipment (cont.)行动内容行动内容1:评估所有设备(待续):评估所有设备(待续)19In addition to machine category, create a table listing all machines and additional categories, such as: 除了机器分类,还应作一表格列出所有机器和附加类别,如:Year of manufacture产品的生产年份Type of machine? Condition? (Good / Fair / Poor)机器类型?状
20、况?(好/一般/差)Does Operator PM process exists (Has a service card been created?)是否有操作员生产性维护程序(是否有服务卡?)Does Maintenance PM process exist (Does a written maintenance task list exist?)是否有维护生产性维护程序(是否有记录的维护任务表?)Has the machine undergone initial cleaning?机器是否经过最初的清洁?Has machine been assessed for safeguarding
21、 per SP008? (EH&S items)机器是否经过安全装置SP008评估?(EH&S项)ACTION ITEM 1: Assess All Equipment (cont.)行动内容行动内容1:评估所有设备(待续):评估所有设备(待续)MACHININGSafety Plan - 2000AREA: 007MACHINE CATAGORYBRASS TAGYEARTYPE EQUIPGEN. COND. GOOD/FAIR/ POORB312488BridgeportGoodB300485HardingeGoodBE1507558Warren Spin PitPoor
22、BE6049187Shadow graphGoodBE7631291Balance controllerGoodB316890BostoGoodB261578BostoGoodB254875LapperGoodB328093OkumaGoodB319891Harrison man. latheGood20Possible Categories:可能的分类: Equipment which retains all of its original functions, accuracy and reliability. :设备保持所有原来的功能,精确并可靠。 Equipment which has
23、 lost some of its original functions or accuracy. Its output normally meets the required specifications.:设备丧失了一些最初的功能或精确度。其产品符合要求的规范。 Equipment which is no longer accurate or reliable. In order to produce acceptable output, this equipment requires operator intervention well beyond the original level
24、. 设备不再精确或可靠。为了生产出可接受的产品,要求操作员对设备进行超出原有水平的干涉。ACTION ITEM 1: Assess All Equipment (cont.)行动内容行动内容1:评估所有设备(待续):评估所有设备(待续)21ACTION ITEM 2: Write Machine-Specific Lockout ProceduresLockout procedures must be written and implemented for each machine General procedures are in effect for Sullair Procedures
25、need to be written jointly with facilities maintenance22行动内容 2: 将特殊锁定程序写在机器上锁定程序必须写在每台机器上并予以执行 一般程序适用于寿力公司 程序必须与设备维护 共同写下来23 ACTION ITEM 3/4: Operator Walkaround and PM Schedule on 100% A/BOperator PM defined for 100% of Category A and B machines A book or sheet exists which defines the daily/weekly
26、/monthly Operator PM tasks Include safety equipment operation (guards, limit switches, etc.) in Operator PM.Operator PM conducted faithfully (1 month prior to audit) on all Equipment for which it is defined.Rev: BRevision Date: 3/ 25/98Operator Preventive Maintenance Service CardMachine: Okuma LC-30
27、, 4 Axis, BT # 3054Daily PM Tasks1. Check running sight.2. Check and fill Waylube: Vactra 2.3. Check tramp oil and scrounger. Empty tramp oil if required.4. Check and fill coolant: PML 9333.Weekly PM Tasks: Do Daily tasks and the following:1. Check and fill spindle lube: DTE 24.2. Check and fill air
28、 lubricator: DTE 24. (Shut off and drain air to fill)3. Check motor fan filter (Change if necessary): Cat. # 030058.4. Check and fill hydraulic tank: DTE 24.5. Check roll filter (Change if needed): Cat. # 027793.Monthly PM Tasks: Do all tasks on this sheet.1. Grease chuck fittings, 1 shot.2. Grease
29、1 fitting, 2 shots, both turrets.3. Clean air filter.4. Change air filter: Cat. # 021183.24 行动内容 3/4: 操作员巡查和操作员巡查和 所有所有 A/B类设备的类设备的PM进度表进度表操作员PM定义为所有A、B类机器 应有写明了操作员每日/周/月的PM任务的书或表 包括安全设备(防护装置、限定电闸等)操作员严格地按要求对所有设备进行生产性维护(在审查前一个月)Rev: BRevision Date: 3/ 25/98Operator Preventive Maintenance Service Car
30、dMachine: Okuma LC-30, 4 Axis, BT # 3054Daily PM Tasks1. Check running sight.2. Check and fill Waylube: Vactra 2.3. Check tramp oil and scrounger. Empty tramp oil if required.4. Check and fill coolant: PML 9333.Weekly PM Tasks: Do Daily tasks and the following:1. Check and fill spindle lube: DTE 24.
31、2. Check and fill air lubricator: DTE 24. (Shut off and drain air to fill)3. Check motor fan filter (Change if necessary): Cat. # 030058.4. Check and fill hydraulic tank: DTE 24.5. Check roll filter (Change if needed): Cat. # 027793.Monthly PM Tasks: Do all tasks on this sheet.1. Grease chuck fittin
32、gs, 1 shot.2. Grease 1 fitting, 2 shots, both turrets.3. Clean air filter.4. Change air filter: Cat. # 021183.25Make Operator PM effective:Use a “Visible at-a-glance” system (Such as a color-coded PM Status board) within the cell to indicate the actual status of “Operator PM” tasks. Must be easy to
33、understand No book or folder to read ACTION ITEM 3/4: Operator Walk around and PM Schedule on 100% A/B (cont.)AREA:_ - OPERATOR PM STATUS BOARDMonth:_Required PMsDateMachine NameBrass Tag #DailyWeeklyMonthly12345678910Daily = Task #1in PM LogsWeekly = Task #2 in PM Logs (to be done every Wednesday)M
34、onthly = Task #3 in PM Logs (to be performed every 2nd Wednesday of the month)Machine Not Operated or PM Not RequiredEquipment Breakdown26使操作员进行有效的生产性维护:使用一眼就能看见的系统 (如使用颜色代码PM状态板) 在单元中表明“操作员PM”任务的实际状态 必须容易理解 无需翻书或文件夹行动内容 3/4: 操作员巡查和操作员巡查和 所有所有 A/B类设备的类设备的PM进度表进度表(待续)(待续)AREA:_ - OPERATOR PM STATUS B
35、OARDMonth:_Required PMsDateMachine NameBrass Tag #DailyWeeklyMonthly12345678910Daily = Task #1in PM LogsWeekly = Task #2 in PM Logs (to be done every Wednesday)Monthly = Task #3 in PM Logs (to be performed every 2nd Wednesday of the month)Machine Not Operated or PM Not RequiredEquipment Breakdown27C
36、osmetic Cleaning禁止化装品禁止化装品ACTION ITEM 5: Initial Inspect/Clean 100% A/B行动内容 5:初步检查/清洁所有A/B类设备28 Accessible components cleaned, inspected and repaired 可用的部件已清洁、检查和修好 PM documentation is reviewed/updated PM文件已检查/更新 Basic improvements are incorporated to improve maintainability and visual 基本的改进用于提高可维护性和形象 operating condition 操作环境How about that. I didnt even know there was a grease fitting here!那个怎么样。我甚至不那个怎么样。我甚至不知道这儿还有个油脂知道这儿还有个油脂装置!装置!ACTION ITEM 5: Initial Inspect/Cleaning 100% A/B
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2024年山东职业学院辅导员考试真题
- 2024年山东交通学院辅导员考试真题
- 年度团队激励计划的实施
- 2024年陕西实验高级中学招聘笔试真题
- 多样化学习资源的开发与利用计划
- 2024年甘肃省乡村振兴局下属事业单位真题
- 建材市场安全保障总结与规划计划
- 2024年泸州市纳溪区事业单位引进笔试真题
- 2025届浙江省金华市婺城区第四中学八下数学期末联考试题含解析
- 应对压力的心理调适计划
- 新疆生产建设兵团2025届七年级数学第二学期期末监测模拟试题含解析
- 2025届陕西省咸阳市高三模拟检测(三)生物试题(原卷版+解析版)
- 压力容器焊工试题及答案
- 2025年安徽省合肥市第四十二中学中考二模物理试题(含答案)
- 少先队理论测试题及答案
- 2024年河北省临漳县事业单位公开招聘村务工作者笔试题带答案
- (市质检)莆田市2025届高中毕业班第四次教学质量检测试卷英语试卷(含答案解析)
- 环宇电子科技公司镀膜铣刀生产项目环评资料环境影响
- 2025广西中马钦州产业园区投资控股集团限公司招聘49人易考易错模拟试题(共500题)试卷后附参考答案
- 工程过账协议合同协议
- 快手开店合同协议
评论
0/150
提交评论