1、1. Insulation resistance test绝缘电阻试验The insulation resistance between bus-bar to earth and the resistance between bus-bars (include 220Vpanel) each phase, shall be measured by a DC 500V megger. Test to be before and after continuous load test.在所有主配电板的开关及保险丝处于断开位置时,用直流500伏兆欧表测量汇流排对地的绝缘电阻,及汇流排(包括220V屏)

2、各相之间绝缘电阻。2. Reverse power relay trip test逆功率继电器脱扣试验Reverse power relay must delay act correctly, the ACB break delay. Reverse power setting: 10% rated power (70kW) Setting time: 10 secondsThe result of test should be recorded into the No.1 tables.逆功率继电器必须正确延时动作,空气短路延时断开。逆功率设定值:10%额定功率(70KW)设定时间:105%

3、(472.5V) delay 10 second alarm, trip, stand-by generator start and switch on. 汇流排电压高105%(472.5V)以上,延时10秒报警,脱扣,备用机起 动并合闸。 (b)Bus voltage low 95% (427.5V) delay 10 seconds alarm, trip, stand-by generator start and switch on 汇流排电压低95% (427.5V)以下,延时10秒报警,脱扣,备用机起 动合闸。 (c) Frequency low 105%(63Hz) 10 seco

4、nds alarm,trip, stand-by generator start and switch on 频率高105%(63Hz)以上,延时10秒报警,脱扣,备用机组起动合闸。 (e)Bus no-voltage (main power failure) stand-by generator start and switch on 汇流排失压(全船失电)备用起动并合闸 (f) General alarm trip and emergency stop 公共报警 脱扣并紧急停车 (g) Start failure alarm 起动故障 报警(3) When three generators

5、 running at automatic mode, two running in parallel and another set is stand-by. If any of the running generators trip, the stand-by set shall start automatically and running in parallel, the failure generator quit running. 三台发电机自动模式时,二台并联运行,另一台作备用发电机,当任何一台运行中的发电机故障脱扣,备用机组自动起动,并联运行,故障机退出运行。(4) Runni

6、ng in parallel automatically and switchover automatically test. 自动并联运行和自动切换运行试验This test is carried out refer to “the process chart of generator control” and verify good programming control and following function control. 可参照“发电机控制流程图”所示的控制程序进行,并验证良好的程序控制和下列控制功能。 (a)Generator start automatically 发电机

7、自动起动 (b)Automatic synchronization 自动同步 (c)During the period of parallel running the loads shall be distributed automatically 并联运行期间的自动负荷分配 (d)During the period of generators changing the loads shall be transfer automatically 发电机转换期间的自动负荷转移 (e)When the net power exceed power of single generator 90% v

8、ia automatic load detection, the stand-by generators shall started delay 10 sec and then running. 通过自动负荷检测,当网上功率超过单机功率的90%时,备用机组延时10秒起动并投入 (f)Two sets of generators run in parallel, when the total loads is under single power 70%, loads shall be shifted to one generator automatically after 5 minute c

9、ontinuously running, the other generator disconnected automatically and shut down delay under no-load condition. 二台并联运行时,若总负荷为单机功率的70%以下时,持续5分钟后负荷自动转移至一台发电机,另一台发电机自动分闸后空载停车(5) MSB safety protection alarm see No.4 tables. 主配电板安全保护报警点见表格4。Test of reverse power(cos=1.0)逆功率试验(Table1 表1)Generator发电机TestO

10、peration power(kW)动作功率Time(sec)时间Remarks备注NO.1 D/G1st702nd“NO.2 D/G1st“2nd“NO.3 D/G1st“2nd70 Test of over current过电流试验(Table1 表2)D/GIt1=1122.6(Io) x 1.1 x 120%=1482A It2=270%x1122.6(Io) =3031AE/GIt1=240.6(Io) x 1.1 x 120%=318AIt2=300%x240.6(Io) =722AGeneratorTestOperation current(A)Time (sec)remarks

11、NO.1 D/G1st2ndNO.2 D/G1st2ndNO.3 D/G1st2ndE/G1st2ndTest of over current for pref. trip过电流优先脱扣试验(Table1 表3)IP=120%x1122.6(Io)=1347AGeneratorTestOperation current(A)Time(sec)RemarksNO.1 D/G1st2ndNO.2 D/G1st2ndNO.3 D/G1st2ndTable 4 (表格4)序号No.项目items报警Alarm0601Main busbar voltage high主汇流排电压高0602Main bus

12、bar voltage low主汇流排电压低0603Main busbar frequency high主汇流排频率高0604Main busbar frequency low主汇流排频率低06051st preference trip一级优先脱扣06062st preference trip二级优先脱扣0607MSB common alarm主配电板公共故障0608Emcy stop line break应急切断线路0609Auto synchro failure自动同步故障0610PMS failure电站管理系统故障0613G1 ACB abnormal trip1#发电机断路器异常脱扣

13、0614G2 ACB abnormal trip2#发电机断路器异常脱扣0615G3 ACB abnormal trip3#发电机断路器异常脱扣0616G1 ACB non close1#发电机断路器未闭合0617G2 ACB non close2#发电机断路器未闭合0618G3 ACB non close3#发电机断路器未闭合0619MSB DC 24V source fail主配电板24V电源故障0620MSB 440V low insulation主配电板440V绝缘低0621MSB 220V low insulation主配电板220V绝缘低0623MSB Emcy stop &pref trip control source fail主配电板应急切断/优先脱扣电源故障G1 ACB re

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论