1、IAEAInternational Atomic Energy AgencyStatus of Fukushima UnitsMiroslav Lipar7 April 2011IAEAUnit 1234Power (MWe /MWth)460/1380784/2381784/2381784/2381Type of ReactorBWR-3BWR-4BWR-4BWR-4Status at time of EQ In service auto shutdownIn service auto shutdownIn service auto shutdownOutageCore and fuel i
2、ntegrityDamagedSevere damageDamagedNo fuel in the ReactorRPV & RCS integrityRPV temperature high but stableRPV temperature stableRPV temperature stableNot applicable due to outage plant statusContainment integrityNo informationDamage suspectedDamage suspectedAC PowerAC power available - power to
3、 instrumentation Lighting to Central Control RoomAC power available power to instrumentation Lighting to Central Control RoomAC power available power to instrumentation Lighting to Central Control RoomAC power available power to instrumentation Lighting to Central Control RoomBuildingSevere damageSl
4、ight damageSevere damageSevere damageWater level of RPVAround half of Fuel is uncovered Around half of Fuel is uncovered Around half of Fuel is uncovered Not applicable due to outage plant statusPressure of RPVIncreasingStableStableCV Pressure DrywellIncreasingStableStableWater injection to RPVInjec
5、tion of freshwater via mobile electric pump with off-site powerInjection of freshwater via mobile electric pump with off-site powerInjection of freshwater via mobile electric pump with off-site powerWater injection to CVNo informationNo informationNo informationSpent Fuel Pool StatusFresh water spra
6、ying completed by concrete pump truckFreshwater injection to the Fuel Pool Cooling LineFreshwater injection via Fuel Pool Cooling Line and Periodic sprayingFresh water spraying completed by concrete pump truckIAEAUnit 56Power784/23811100/3293Type of ReactorBWR-4BWR-5Status at the EQ occurredOutageOu
7、tageCore and FuelCold ShutdownBeing maintained using off-site electrical power and existing plant equipment.Cold ShutdownBeing maintained using off-site electrical power and existing plant equipment.RPV & RCS integrityContainment int.AC PowerBuilding Water level of RPVPressure of RPVContainment
8、PressureWater injection to RPVWater injection to CVSpent Fuel Pool StatusSevere conditionConcernNo immediate concernIAEACondensate Storage tank1900 m3Suppression Pool Surge Tanks2x3400 m32nd StepTransfer to provide tank capacity Mar 31st to Apr 2nd Unit 13rd StepProvide Space in CondenserApr 2nd Uni
9、t 1Mar 24th Mar 29th1st StepCondenser filledTemp Storage TankPlannedSequence of Events to Remove Water in Unit 1IAEACondenser3000 m3Condensate Storage tank2500 m3Suppression Pool Surge Tanks2x3400 m31st Step -Transfer to provide tank capacity Mar 29th to Apr 1st Unit 22nd Step - Transfer to provide
10、capacity in condenserApr 2nd (30 m3/h)PlannedPlannedSeaApr 5th10,000 tonsUnit 5 & 6 sub drain pitsApr 5th 1,500 tonsLow level contaminated water Temp Storage TankSequence of Events to Remove Water in Unit 2IAEACondenser3000 m3Condensate Storage tank2500 m3Suppression Pool Surge Tanks2x3400 m31st
11、 Step -Transfer to provide tank capacity Mar 28th to Mar 31st - Unit 32nd Step - Transfer to provide capacity in condenserApr 5th Unit 3LaterLaterSeaApr 5th10,000 tonsUnit 5 & 6 sub drain pitsApr 5th 1,500 tonsLow level contaminated water Temp Storage TankSequence of Events to Remove Water in Unit 3IAEA Borehole Injection of Tracer Injection of liquid glassCross Section PlanScreen Pump roomFloor PlanCable TrenchPitInjected liquid glass to block the water path in the gravelInjection of water glass to block the water path:Positi
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 课程思政视角下的《法语读写教程》分析
- 危急值报告制度及处理流程【课件】(2026版)
- 2026届广西钦州市钦南区中考二模语文试题含解析
- 山东省五莲县联考2026届中考一模语文试题含解析
- 贵港市重点中学2026届中考历史适应性模拟试题含解析
- 2026届广西南宁青秀区四校联考十校联考最后历史试题含解析
- 2026年全球人才趋势报告
- 2026润滑油经销商网络优化与终端管理策略报告
- 2026水果产业协会在标准化生产中的职能优化研究报告
- mpacc案例大赛初赛案例分析-NE汽车公司
- 攀枝花市2026年春季综合类事业单位引才(第二批)盐边县岗位考核的备考题库及答案详解(有一套)
- 2025年中国融通融通资源开发社会招聘笔试历年参考题库附带答案详解
- 2026年4月18日衢州市属事业单位选调笔试真题及答案深度解析
- 2026陕西氢能产业发展有限公司(榆林)所属单位社会招聘27人笔试历年参考题库附带答案详解
- 基于YOLOv8的轻量化轨道小目标异物检测算法研究
- 2026年国家电网招聘之公共与行业知识题库试题附参考答案详解(综合卷)
- 2026年春重大版新教材四年级下册英语教学计划(含进度表)
- 许振南针刀课件
- GB/T 1402-2025轨道交通牵引供电系统电压
- 新版部编版三年级下册道德与法治全册教案(完整版)教学设计含教学反思
- 砖混房建筑工地施工方案
评论
0/150
提交评论