版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Reason for Change (更改原因):Control Document Seal (受控印章):1. extend the scope of EMSAuthorizations (审批):Distribution List (分发清单) :1GMSignatureDateDate1F&AMISNameZhang XiBu/Dept.MGT-EHS1MGT(Originator)1 EHSFMT HRMSignature LOGQSMDateDate NameKevin TaylorBMGENGEQTMLDBU / Dept.FDM and PAGPDNPMC QA Sign
2、atureDateDate1 FDMNameGraham E Dunn ENGPDN PMCBu/Dept.PMG IQC QA W/H1PAGSignatureDateDateENG PDN PURNameDavid WongPMCPRJ IQCQAW/HBU/Dept.GM1PMGSignatureEQTOCIPDIDateDatePDIIPMCPURNamePWDQASALBU / Dept.SCOTOL.Revision History (修订记录)Rev(版次) Originator(编撰者)Effective Date(生效日期)Description of Change(更改描述
3、)AZero Qian2007-7-19First IssueBZhangxi2007-12-51.Revised the : “the location of D6 Xintang Industrial Zone” replaced by “the factory of Xintang Industrial Zone include block D5,D6 and A9” 2.The Appendix A add a comment that:” For details of each block, refer to Job Description at HRM”cZhangxi2008-8
4、-13Extend the scope of EMS to cover Baishixia, Fenghuang and Gongming facility.ContentsPart 1 Company Background- 5Part 2 Scope of Environmental Management System-5Scope-5Environmental Policy and Environmental Objective-5Part 3 Introduction to the Environmental Manual-7 Introduction-7Control of Envi
5、ronmental Manual-7Part 4 Environmental Management System Requirements-84.1 General Requirements-84.2 Environmental Policy -94.3 Planning-9 4.3.1 Environmental Aspects-9 4.3.2 Legal and Other Requirement-10 4.3.3 Objectives, Targets and Programme(s)-114.4 Implementation and Operation-12 4.4.1 Resourc
6、es, Roles, Responsibility and Authority-12 4.4.2 Competence, Training and Awareness-13 4.4.3 Communication-14 4.4.4 Documentation-14 4.4.5 Control of Documents-14 4.4.6 Operational Control-15 4.4.7 Emergency Preparedness and Response- 154.5 Checking -16 Monitoring and Measurement -16 4.5.2 Evaluatio
7、n of Compliance-16 Nonconformity, Corrective Action and Preventive Action -17 4.5.4 Control of Records-17 4.5.5 Internal Audit -174.6 Management Review -18Part 5 Appendix A: AMLSZ Organization Chart-20 Appendix B: Environmental Management Document List-211. Company Background Arnold Magnetics (ShenZ
8、hen) Ltd. (AMLSZ) was established in November 2001. The company is one of the largest magnetic products manufacturers in the world supplying magnets, magnetic material and assemblies into Automotive, Consumer and Industrial products, Medical applications, Military& Aerospace, Reprographic system
9、s, Security systems& Telecommunications. The manufacturing plant adopts lean production method and a 6-Sigma quality control system, the company obtained the ISO9001:2000 certification on Mar of 2003 , the ISO/TS 16949:2002 certification on Oct of 2006 and ISO14001:2004 certificate in Jan of 200
10、8.Our Research & Development center is established in USA and Sales & Marketing is set in Hong Kong.Company Location D6 Xintang Industrial Zone,Baishixia,Fuyong Street,Baoan,Shenzhen,Guangdong,P.R.C. Bldg.E the 3rd Industrial Zone,Fenghuang, Fuyong Street,Baoan,Shenzhen,Guangdong,P.R.C. 15#,
11、Dayang 1st Road,Yulu,Gongming Street,Baoan,Shenzhen,Guangdong,P.R.C.2. Scope of the Environmental Management System2.1 Scope This environmental manual provides a general framework for the environmental management system corresponding to all activities, products and services of Manufacture of soft ma
12、gnetic powder cores, samarium cobalt permanent magnets and precision mechanical and electrical assemblies for the reprographics industry of Arnold Magnetics (Shenzhen) Limited so as to improve environmental management, protect environment, prevent pollution and achieve continual improvement. The env
13、ironmental management system applies to:The factory of Xintang Industrial Zone includes block D5, D6 and A9.The factory of Fenghuang the 3rd Industrial Zone includes block F, dormitory and canteen.The factory of Gongming includes block C, D and E.2.2 Environmental Policy and Environmental Objectives
14、2.2.1 The following Environmental Policy is reviewed and endorsed by the top management of AML.Environmental Policy StatementArnold Magnetics (Shenzhen) Ltd is committed to leadership in the production of soft magnetic powder cores, including excellence in environmental management. To achieve and ma
15、intain this objective of excellence in environmental management within the soft magnetic powder core industry, it is Arnolds environmental policy that:Protecting the Environment Today To Ensure TomorrowWe can understand it from the following:Environmental Performance· Arnold Magnetics (Shenzhen
16、) Ltd will establish goals and targets for environmental performance, and will implement measures intended to achieve these goals and targets. · Arnold Magnetics (Shenzhen) Ltd will periodically conduct a comprehensive assessment of the nature and scale of environmental concerns related to its
17、business. · Arnold Magnetics (Shenzhen) Ltd believes that effective environmental management is closely linked with efficient business practices, and will continue to place a high priority on improved environmental management practices that are also efficient business practices. Regulatory Comp
18、liance· Arnold Magnetics (Shenzhen) Ltd will make all efforts to be aware of, and to comply with, relevant world wide environmental legislation. Employee Awareness· Arnold Magnetics (Shenzhen) Ltd will identify the knowledge and skills required of its employees, and will train and equip th
19、em to carry out their duties in a manner consistent with its environmental management policies. Pollution Prevention· Arnold Magnetics (Shenzhen) Ltd will develop pollution prevention and waste minimization programs to address environmental issues, including, but not limited to air and water qu
20、ality and waste management. · Arnold Magnetics (Shenzhen) Ltd will continue to support the programs intended to develop methods for minimizing the impact of its operations on the environment. Public· Arnold Magnetics (Shenzhen) Ltd is committed to open communication with members of the com
21、munities in which they operate. 2.2.2 Top management shall set up and periodically review companys strategic environmental objectives to ensure the continual improvement and to ensure customer satisfaction.2.2.3 Top management shall communicate the environmental policy and environmental objectives w
22、ithin the company in every January and summarize the achievements per month or per quarter (for some items). 3. Introduction to the Envrionmental Manual3.1 Introduction The environmental manual of the company (“this manual”) describes the general frame of Environmental Management System established
23、according to ISO14000:2004 standard in Arnold (Shenzhen), including environmental policy, the organization structure, responsibilities and authorities of every department, the interrelationship among functional departments.3.2 Control of the Manual3.2.1 General This manual is controlled per t
24、he Document and Data Control Procedure. This manual is issued either as controlled copy or as uncontrolled copy which is identified on the cover sheet of this manual. The controlled copies of this manual are issued to those departments which are listed in the distribution list.
25、 The holders of controlled copies are responsible for providing their subordinates reading and understanding this manual and assuring their subordinates implementing the policy stipulated in this manual. If this manual is revised, the holders of this manual shall be notified and shall be dist
26、ributed with a copy of new revision immediately. Uncontrolled copies may be distributed to any customers, suppliers or others on request of Management Representative (MR). Uncontrolled copies of this manual are not updated when this manual is revised. 3.2.2 Approval This manual is revi
27、ewed and approved by the followings:- Management Representative; - Vice General Manager/Business Unit General Managers; - General Manager.3.2.3 Issue and Distribution The document controller prepares and keeps a distribution record. She/he is also responsible for the distribution and control
28、of this manual and its revised copies. Distribution List (not limited to)- General Manager; - Management Representative;- Vice General Manager(s) and Business Unit General Manager(s);3.2.4 Control of Changes Any changes to this manual shall be approved by the authorized person.
29、Management Representative shall review all changes before the approval. Revised copy is distributed to all existing holders of controlled copy. 3.2.5 Abbreviation 1. EMS - Environmental Management System;2. MR Management Representative;3. DCC Document Control Center;4. AML Arnold Magnetics (S
30、henzhen) Limited.4. Environmental Management System Requirements 4.1 General RequirementsAML has established Environmental Management System (EMS) in compliance with ISO14001:2004 standard, which applies “PDCA” management model, that is, the EMS are continually improved as per “Plan, Do, Check and A
31、ct”. 1) Establish an environmental policy 2) Identify environmental aspects of AMLs activities, products or services thoroughly, evaluateenvironmental aspects and confirm significant environmental aspects;3) Identify and have access to legal and other requirements which are applicable to AML;4) Esta
32、blish environmental objectives and targets;5) Define the organization structure; provide EMS training, communicate with internal levels and functions and external interested parties; prepare EMS documents and provide resources to achieve environmental policy;6) Conduct monitoring and measurement, ta
33、ke corrective and preventive actions, carry out EMS audit to ensure the adequacy and effectiveness of the EMS; 7) Carry out management review once a year to review the EMS. Update environmental policy,objectives and targets and the elements of EMS in light of the changing circumstances to achieve co
34、ntinual improvement.4.2 Environmental Policy4.2.1 Top management shall define, review and approve Environmental Policy.4.2.2 The content of the Environmental Policy a) is appropriate to the nature, scale and environmental impacts of its activities, products and services, b) includes a commitment to
35、continual improvement and prevention of pollution,c) includes a commitment to comply with applicable legal requirements and with other requirements to which the organization subscribles which relate to its environmental aspects,d) provides the framework for setting and reviewing environmental object
36、ives and targets,e) is documented, implemented and maintained,f) is communicated to all persons working for or on behalf of the organization, and g) is available to the public.4.3 Planning 4.3.1 Environmental Aspects AML has established and maintained Environmental Aspects Identification and Evaluat
37、ion procedure to identify the Environmental Aspects of its activities, products and services that is can control and over which it can be expected to have an influence, in order to determine those which have or can have significant impacts on the environment. The environmental aspects identified are evaluated to determine those aspects that have significant impacts on the environment. Significant aspects, in turn, are considered in establishing, implementing and maintaining thi
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 法律机构内部审计制度
- 法院内部规章管理制度
- 港口企业事故隐患内部奖励制度
- 班级内部卧底管理制度
- 电缆厂车间内部管理制度
- 福建省内部控制基本制度
- 超市内部员工规章制度
- 2025-2026学年月光曲第二课时教学设计
- 2025-2026学年跨学科教学设计
- 2025-2026学年装饰叠纸教学设计语文
- 2025年智能文化旅游景区智能化建设方案
- 高层建筑动火作业安全专项施工方案
- 2026年湖南生物机电职业技术学院单招职业倾向性考试必刷测试卷必考题
- 2025年驻马店辅警招聘考试真题附答案详解(完整版)
- 2026年苏州工业职业技术学院单招职业倾向性测试必刷测试卷附答案
- 化学试题卷答案【中国第一高中】【湖北卷】湖北省2025年华中师大一附中2025年高考学科核心素养卷暨考前测试卷(最后一卷)(5.31-6.1)
- 医院2024年度内部控制风险评估报告
- 2024-2025学年福建省福州市九校高一下学期7月期末考试语文试题(解析版)
- 2025广西柳州市柳江区应急管理局招聘机关文员和消防队员3人考前自测高频考点模拟试题及答案详解(全优)
- 2024年丽水学院公开招聘辅导员笔试题含答案
- FIDIC1999版《施工合同条件》在石化工程中的应用剖析:优势、挑战与实践路径
评论
0/150
提交评论