版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、第一篇 概述Chapter 1:General IntroductionDQ1200/2500.40悬臂式斗轮堆取料机是由长春发电设备总厂为越南沿海一期火力发电厂项目开发、设计、制造的一种大型、连续、高效的散状、粒状物料堆取作业的设备。DQ1200/2500.40 Boom type bucket wheel stacker reclaimer (BWSR is a kind of large, continuous and efficient bulk cargo stacking & reclaiming equipment, developed/ designed and man
2、ufactured by Changchun Generating Equipment Co., Ltd, China for DUYEN HAI 1 THERMAL POWER PLANT Project.第一节 设备简介Section 1 Brief Introduction of the equipment 越南沿海一期火力发电厂项目共二台斗轮堆取料机,为整体俯仰,头部分流固定单尾车。详见总图(图号DQ9721.0ST。Two sets Boom Bucket Wheel Stacker Reclaimer will be supplied by CGE for DUYEN HAI 1
3、THERMAL POWER PLANT Project, the luffing of each equipment is integral luffing, and the single tripper car is coal flow branching. Details refer to general drawing (Drawing No: DQ9721.0ST.斗轮堆取料机由斗轮机构、上部金属结构、悬臂胶带机、主机梯子平台、俯仰装置及系统、行走机构、门座、中部料斗、缓冲托架、回转机构、集中润滑装置、限位装置、检测装置、尾车、尾车梯子平台、电气室、电气系统、司机室及支架、厂牌、配重组
4、、洒水装置、动力电缆卷筒装置、控制电缆卷筒装置、水缆卷筒、转盘、支承铰座、基础布置及载荷等组成;司机室安装在门柱下部;装有斗轮机构、悬臂胶带机、司机室、配重组等变幅部分的上部金属结构围绕变幅铰点变幅;尾车上装有动力电缆卷筒、控制电缆卷筒、水缆卷筒、电气室及洒水系统的水源装置。Bucket Wheel Stacker Reclaimer consists of bucket-wheel mechanism, super steelstructure, boom conveyor, walkway/access stairs and platforms of the main machine, l
5、uffing unit and system, long travel, portal, centre chute, buffer bracket, slew unit, central lubrication system, limited switches, detector, tripper car, walkway/access stairs and platforms of tripper car, electric room and electrical system, operators cabin and brackets, nameplate, counterweight a
6、ssembly, dust suppression system, power cable reel drum, control cable reel drum, water cable reel drum, slew deck, supporting pivot block, foundational layout and load etc. Operators cabin is installed on the upper part of the pylon. The super steel structure on which bucket-wheel mechanism, boom c
7、onveyor, operators cabin, counterweight etc. luffing parts are installed will be luffing around the luffing pivot point. Power cable reel, control cable reel drum, water cable reel drum, electric room and water source device of dust suppression system are installed on the tripper car.第二节 工作原理Section
8、 2: Working Principle本设备能够采用手动、手动联锁、半自动进行堆料和取料作业。This equipment can select to use manual, manual interlocking as well as semi-automatic stacking and reclaiming operation.堆料作业时,中部料斗分流板处于堆料状态,系统胶带机送来的物料经尾车(系统胶带机、尾车头部落料斗转运到中部料斗,再输送到悬臂胶带机上,然后抛向储煤场。臂架的上仰和下俯可实现高、低位的堆料;臂架回转实现左右料场及料场宽度的堆料;大车行走则实现轨道长度方向的堆料。D
9、uring stacking operation, the centre chute branching plate should be in stacking state, the material transferred from yard-conveyor via tripper car conveyor, head hopper of the tripper car to centre chute and then feeding to boom conveyor, at last stacking onto stockpiles. Boom luffing can realize h
10、igh & low level stacking; Bucket wheel boom slewing can reach left-right stockyard and stockyard width stacking, Long Travel Drive can realize stacking along the track length.取料作业是按分层取料的工艺进行的 ,必要时也可以进行斜坡取料。斗轮机构上的斗子挖取上来的煤卸至悬臂胶带机上,再由悬臂胶带机抛向中部料斗,经系统胶带机输出。臂架的上仰和下俯可实现高、低位的取料;臂架回转实现左右料场及料场宽度的取料;禁止只靠大车
11、行走取料。Reclaiming operation is carried out according to layer reclaiming process as well as bevel reclaiming if necessary. Discharge the coal excavated and reclaimed by the hopper of the bucket wheel mechanism to boom conveyor- then through boom conveyor drop into centre chute, via yard conveyor trans
12、port out. Bucket wheel boom luffing can realize high & low level reclaiming; Bucket wheel boom slewing can reach left-right stockyard and stockyard width reclaiming; Forbidden to reclaim the material only depending on long travel mechanism traveling.分流作业是系统胶带机送来的煤经尾车胶带机(系统胶带机、尾车头部落料斗,一部分经分流料斗转运到
13、中部料斗卸至缓冲托架、经系统胶带机输出。另一部分输送到悬臂胶带机上,然后抛向储煤场。Branching operation is such a process that the coals, from yard conveyor, go through tripper car conveyor (yard conveyor and tripper car head hopper, part of coals go through branching hopper, transported to centre chute and discharged at buffer bracket, out
14、put by yard conveyor; the other part of coals transported on boom conveyor and discharged at stockpile.详细结构说明请参见本机的使用、维护说明书。(Detailed structure and instruction, refer to “Operation and maintenance instruction” of this machine.第三节 设备的性能参数、基础载荷Section 3: Performance Parameter and foundational arrangem
15、ent load of the Equipment1 堆料能力Stacking capacity2500t/h(额定 3000t/h(额定 2500 t/h (rated 3000t/h (rated 2 取料能力Reclaiming capacity1200t/h(额定 1440t/h(额定 1200 t/h (rated 1440t/h(rated 3 堆取高度 Height of stacking and reclaiming轨上13.5m 、轨下1.5m13.5 m above rail and 1.5 m below rail4 斗轮转速Rpm. of the Bucket whee
16、l6.86r/min 5 胶带速度Belt speed3.15m/s 6 臂架回转半径Slewing radius of Bucket wheelboom40m 7回转角度Slewing angle ±110° 8 回转速度Slewing speed0.0320.116r/min 9 走行速度Traveling speed 工作速度7.5m/min 、调车速度30m/min Working speed: 7.5 m/min,commissioning speed: 30m/min10 总装机容量Total installed capacity430kW12 电源:Power
17、 Supply 供电电压6.6kV 、供电频率50Hz 、供电方式为电缆卷筒 Power voltage: 6.6 kV, frequency: 50HzPower supply mode: cable reel drum13 风压:Wind pressure 最大工作风压250N/m2、最大非工作风压1850N/m2 Max. Working wind pressure: 250N/m2,Max. non- working wind pressure:1850N/m2.本安装技术条件和调试、试验规程适用于越南沿海一期火力发电厂项目DQ1200/2500.40悬臂式斗轮堆取料机,并作为斗轮堆取
18、料机安装要求及安装质量标准和安装完毕进行调试、试验、验收质量标准的依据。其中主要内容如下:各部件或设备的维修说明及维修质量标准;各部件或设备的调试、试验规程;安装要求及安装质量标准。This “Installation Technical Conditions & Regulations on Commissioning and Test” will be applicable for DUYEN HAI 1 THERMAL POWER PLANT Project - DQ1200/2500·40 Boom Bucket Wheel Stacker cum Reclaimer
19、. It is also as a standard for installation requirements and installation quality as well as a basis for quality of commissioning/ test, also as a standard for quality acceptance after installation. Main contents will be as follows:- Maintenance instruction and maintenance quality standard of each c
20、omponent or equipment- Regulations on commissioning and test of each component or equipment- Installation requirements and installation quality standard第二篇 安装技术条件Chapter 2: Technical Conditions of Installation第一节 总则Section 1: General Principles1 斗轮堆取料机必须按规定程序批准的图样及技术条件的要求进行安装。Bucket wheel stacker re
21、claimer must be installed according to the drawings approvedby specified program and technical requirements.2 待安装的零部件必须是检验合格的产品,外购机电产品应具有出厂合格证、使用、维护说明书。The spare parts and components installed must be conformable products through inspection, the bought-in mechanical and electrical products should ha
22、ve ex-work quality certificate and operation & maintenance specifications.3 安装中的消耗材料(焊条、紧固件、润滑脂、机械油、液压油等必须具有出厂合格证,符合国家(或行业标准。The consumable material of installation (such as electrodes, fasteners, lubricating grease, machine oil, and hydraulic oil etc must have an Ex-work certificate, and should
23、 be in accordance with national (or industry standards.4 安装工作应由专业部门负责进行。Installing work should be responsible by professional departments.第二节 安装前的准备工作Section 2: Preparations before installation1 斗轮堆取料机各零部件及构架等运到现场卸车时应避免扭、弯、撞击、腐蚀等事故的发生,为此必须遵守以下规定:All parts and components as well as frames of Bucket W
24、heel Stacker Reclaimer will avoid distortion, bend , collision, corrosion; etc accident, while unloading after they arrive at the jobsite. Therefore, the following rules must be observed:1.1 起吊时构件至少应捆扎两处,捆扎处须有衬垫物,并捆扎在有筋板等加强节点处,一般应尽可能捆扎在构件的两端,不宜捆扎在非节点部位或构件的外伸部。The components must be lifted with being
25、 enlaced at least two points where there must be gaskets, and they should be enlaced at the stiffener nodes of stiffener, normally, the components should be enlaced at the two ends, it is improper to enlace them at places without nodes or extensional part.1.2 搬运时应将构件搁置在载重汽车或平板车上,禁止直接在地面上放滚拖移。The com
26、ponents should be placed on trucks or flatcars while transported. It is forbidden to roll or pull them directly on the ground.1.3 存放时应安置平稳,用枕木垫实放平,枕木应对称放置,地面也必须选择结实平整完好处,以防日久下沉以致构件变形。They should be stored on stationary crossties, and the crossties should be placed in symmetry. The ground must be sol
27、id, smooth and intact, thus avoiding deforming of the components due to ground falling as time passes.1.4 零(部件如需露天存放的,应遮盖好,对存放日期长或露天存放的件安装前应检查锈蚀情况,清除污渍,必要时重新涂油组装,使各转动部分灵活,并检查各联接部分的牢固性。存放期间应定期保养,注意防潮、防锈和通风。If some parts and components need be stored outdoor, they should be well covered. Those that wi
28、ll be stored for a long time or outdoor should be inspected their rust situations before installation and derusting, and repainted and reassembled if necessaryto make sure smooth running of every rotating part. The fastness of every linked part should be also inspected. During storage they should be
29、 maintained regularly, prevented from moisture, rusting and ventilation.2 安装前应组织安装人员认真熟悉图样,根据要求详细检查部件的安装尺寸,不符合图样要求的需校正。It is necessary to organize personnel to read the drawings carefully, inspect the installation dimension of all spare parts and components, the parts which can not meet the requirem
30、ents of drawings should be modified.3 按附录A复核查验斗轮堆取料机轨道精度。Recheck and inspect the rail accuracy of Bucket Wheel Stacker Reclaimer according to appendix A.4 安装位置应选在锚定位置为宜(如在非锚定位置安装,则应在车轮下塞进“铁靴”以防大风刮跑。The installation position should be selected to anchoring point (if in non-anchoring point, wedge bloc
31、k assembly should be stuffed under the wheel to avoid blowing away by storm.第三节 安装Section 3: Installation1 现场连接Connection on the jobsite1.1 所有连接应根据图样及有关连接技术要求进行。All connections should be carried out according to drawings and related technical requirements.1.2 连接中不允许存在附加力,严禁强制装配。It is unallowable to
32、have additional force during connection; it is strictly prohibited to assemble forcibly.1.3 为减少高空作业量,应尽量在地面上连接。Connection should be done on the ground in order to reduce work high above the ground.1.4 焊接连接要求Requirements for welding connectionSite welding should be completed by qualified welders.The
33、connection of the main components should be made bevel.件采用E4303焊条,16Mn制造的构件采用E5015焊条。异种材料构件之间的焊接,一般按强度较强的金属基体选用焊条。本机除平台以外全部工地现场安装焊条采用E5015焊条。The type and specification of the welding material should be in accordance with thedesign drawings and requirements of welding procedure. Normally, E4303 elect
34、rodesapply to the components made of Q235-A steel, E5015 electrodes apply to those madeof 16Mn steel. Welding between different material components, electrode should usuallybe selected according to the metal with larger hardness. Except the platform, all welding electrodes used for site installation
35、 of this equipment should adopt E5015 electrodes.150保温箱中,随用随取。Electrode should be baked before being used according to reference of table 1-1 in the “operating instruction”. The baked electrodes should be stored in a 100150 thermal container on the jobsite for taking electrode for use at any time of
36、 welding. 表1-1 Table 1-1焊条牌号Electrode brand 烘干温度Baking temperature烘干Baking timeE4303 1502502小时2 hoursE5015 35040023小时23 hours为次要件焊接使用。After the baked electrodes being placed in the open air for more than 4 hours, they must be re-baked in the heating oven, Those electrodes rebaked more than twice can
37、 only be used as secondary welding.Edges of all welding seams ( 10mm must be cleaned completely e.g. water stain, oil stain, rust, paint and oxides, etc. until the surfaces expose the metallic gloss.It is not permitted to strike the arc and test electric current on non-welding position,flux on the w
38、elding seam should be removed and the weld beading shall be removed.If it rains, snows or fogs while welded outdoors, it is unallowable to weld without safety precautions.Inspection for weld seama.焊缝高度应符合图样要求。The height of the weld seam should be in accordance with the requirements of the drawings.b
39、.焊缝及热影响表面不得有裂纹、气孔、弧坑和夹渣等缺陷。No cracks, pores, arc craters and slag etc defects on the welding seam andheat-affected surface.c.焊缝咬边当板厚小于10mm时,不得大于0.5mm,当板厚大于10mm时,不得大于1mm,咬边连续长度不大于100mm。二侧咬边总长不得超过焊缝总长的10%。The undercut of the weld seam is not more than 0.5mm, if the plate thickness is less than 10mm; t
40、he undercut of the welding seam is not greater than 1mm, if the plate thickness is more than 10mm; and the continuous length of the undercut will not more than 100mm. The total length of the bilateral undercut shall not exceed 10% of the total length of the welding seam.d.焊缝应呈圆滑过渡至母材的几何形状,焊缝转角处应饱满。W
41、eld should be smooth transition to base metal geometry in shape, the corner ofweld should be fullness.1.5 高强度螺栓连接Connection with high strength boltConnection mode of high strength bolt for steel structureTreatment of connection surfaceContaminations, paint, oil and oxide skin etc that can reduce fri
42、ction factor on the connection surface must be removed before connection. Steel brush should be used for getting rid of the rust on the face rust and without grinding wheel.additional force (e.g. with hammer. If can not infix smoothly, fraise should be used to repair, the diameter of holes should be
43、 smaller than that of 1.2 bolt after repairing. Before starting to repair, all the bolts around the hole are tightened and plates are put closely in order to avoid iron chips falling. Gas cutting for bearizing is prohibited.While installing high strength bolts, friction surface of components should
44、bedry, installation is not permitted in rain.Torque wrench for hexagon head high strength bolts must be corrected before using, torque error percentage is not more than ±5%, it is used after qualification; torque error percentage of wrench for correction is not more than ±3%.一种颜色在螺母上涂上标记。T
45、ightening for hexagon head high strength bolt is divided into pre-tighteningand final tightening, tightening for big nodes is divided into first tightening, second tightening, final tightening. Torque for pre-tightening is 50% that of operating torque, torque for second tightening is equal to that o
46、f first tightening. High strength bolts should be marked with color on the nut after first and second tightening, then make final tightening according to operating torque. High strength bolts should be marked with different color.复拧和终拧时,连接处的螺栓应按一定顺序施拧,一般应由螺栓群中央顺序向外拧紧。高强度螺栓的初拧、复拧、终拧应同一天完成。During tigh
47、tening hexagon head high strength bolts, torque only on nuts. Bolts on the connection points should be tightened in sequence which from center to outside part during first, second and final tightening, these three process should be finished on the same day.Tightening method and pretightening force高强
48、度螺栓必须采用力矩搬手紧固,控制扭矩达到要求的预紧力。对本机采用的GB12281230-94标准大六角头高强度螺栓,力矩板手扭矩值按下式确定: M=KDg.dHigh strength bolts must be tightened with torque wrench to control torque to reach the required pre-stress. Refer to the GB12281230-94 standard hexagon head high strength bolts that applies to this machine, the value of
49、torque will be decided by the following formula:M=K Dg. d式中: K -扭矩系数(范围值0.110-0.150K-torque coefficient (range: 0.110-0.150Dg-预紧力M22高强螺栓Dg=210×10³NDg-pretightening force: M22 high strength bolt Dg=210×103Nd -螺栓直径M22高强螺栓 d=0.022md-diameter of the bolt M22 high strength bolt d=0.022m注:K
50、值以生产高强螺栓的厂家提供的合格证为准。Note: K value is in accordance with the conformity certificate offered by high strength bolt manufacturer.2 安装顺序Sequence of installation由于各安装单位拥有的技术装备手段(起吊作业机具等和安装现场场地条件的不同,允许有不同的安装方案,但在保证安全、可靠、经济、质量的前提下,进行空间与时间的合理交叉,以达到缩短安装周期的目的。Since the technical equipments and instruments (li
51、fting machines etc. and the installation fields are various, it is permitted to use different installation plans which, however, must base on safety, reliability, economy and quality, and logically cross in time and space, so as to realize the objective of shorten installation period. The following
52、installation order is recommended.3 装配与安装技术要求:Technical Requirements for Assembly and Installation斗轮堆取料机对行走轨道的精度要求见附录A。The rail accuracy being required by Bucket Wheel Stacker Reclaimer refers to Appendix A:3.1 行走机构Long Travel mechanismInstalling precision of the traveling wheel for long travela同侧轨道
53、上各车轮滚动圆的中心应在同一平面上,其同位差应符合表1-2及图1。The centers of the rolling circles of all wheels on the same side of the rail should be on the same level, whose position deflection should be in accord with Table1- 2 and figure 1表1-2 Table1-2测量部位Measuring point偏差Deflection同一台车架的两个车轮Two wheels of the same bogie2mm同一
54、支腿下的三个以上车轮 Over three wheels under the same support leg3mm同侧轨道上的全部车轮All wheels on the same side of the rail5mm 图1 figure 1b 同一轴线上一对车轮的水平偏斜方向应相反,其水平偏斜值ax 不得大于测量长度 L 的千分之一(图2。The deviated direction of a pair of wheels on the same axis shall be opposite, the horizontal deflection ax shall not be more t
55、han millesimal of the measured length L (figure 2.figure 2c 同一轴线上一对车轮的垂直偏斜方向应相反,且上边应向外偏,车轮的垂直偏斜值 ay 不得大于测量长度 L 的四百分之一(图3。The deviated direction of a pair of wheels on the same axis shall be opposite, the upper side shall deviate outwards, and the vertical deflection of the wheel ay shall not be more
56、 than one four-hundredth of the measured length L (figure 3 图3 figure 3Installation accuracy for long travel drive should be in accordance with table1-3 and figure 4表1-3 Table1-3检测项目测量点允许公差Inspection item Measuring point permissible tolerance 轮距W 两铰轴中心±5mm Wheel gauge W Center of two pivot shaf
57、ts ±5mm轨距 S 轮距中心两侧之间±5mmRail gauge S Between two sides of thewheel gauge center ±5mm对角线A、B 台车中心点15mmDiagonal A-B Center point of the wheelbogie15mm水平度C 铰轴中心高低差±5mm Flatness C High-low difference of pivot ±5mm轮距距轨图4 figure3.2 斗轮机构Bucket Wheel mechanismThe clearance between ri
58、ng chute and inner circle of wheel should be 510mm.After installation, angle between bucket-wheel shaft and upper surface of theBucket wheel boom is 7°.3.3 回转机构Slew unitDuring installation, the quenching soft strip of the slewing support should beplaced on unloading area or unfrequent load area.High strength friction grip bolts should be used for installing slewing suppor
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026年贵州食品工程职业学院面向社会招聘编外聘用人员16人笔试备考题库与答案解析
- 2026年其他皮革制品制造行业市场深度调研报告及未来五至十年技术路径与产业化前景
- 2026年营口大石桥市中医院公开招聘医疗岗位工作人员笔试备考题库与答案解析
- 2026年咽喉疾病用药行业洞察报告及未来五至十年发展趋势报告
- 2026年纺织印染助剂制造行业洞察报告及未来五至十年发展趋势报告
- 2026北海市银海区妇女联合会招录公益性岗位人员1人考试参考试题及答案解析
- 2026上海三毛企业(集团)股份有限公司社会招聘4人笔试备考题库与答案解析
- 2026年烟叶复烤行业市场监测与评估报告及未来五至十年用户画像与需求分层
- 2026年标准化服务行业市场趋势报告及未来五至十年数字化与智能化升级
- 2026年体育表演服务行业投资战略研究报告及未来五至十年跨界融合与颠覆创新
- 《音乐万花筒 京昆之声》(课件)-2026-2027学年六年级音乐上册人教版(简谱)
- 2025年医学课件-急性心肌梗死的规范化诊治
- 2026 年秋季高一开学第一课正视高中考试成绩得失主题班会
- 智能密封胶条2.0时代:从被动密封到主动感知的跃迁
- 2026年湖北省法院员额法官遴选笔试真题及答案解析
- 2026年中考英语冲刺抢分训练 专题09 短文选词填空(含答案)
- 2025年浙江西学中题库及答案(可下载)
- 第三学段:单元知识结构化梳理与迁移运用课教学设计-以统编版三年级上册第六单元为例
- DB50∕T 1785-2025 病房安宁疗护服务规范
- 护士长管理进修汇报
- 移动式活动脚手架专项施工方案
评论
0/150
提交评论