版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、 高新技术企业力 科 电 气 圆型侧式悬臂堆料机电控系统使用说明书大连力科技术工程有限公司(本企业通过ISO9001认证) 高新技术企业力 科 电 气 圆型桥式刮板取料机电控系统使用说明书大连力科技术工程有限公司 High & New Technological Enterprise Electric Control System For Round Size-SideCantilever Material Piling MachineOPERATION MANUALDalian Like Technology Co., Ltd(This enterprise has passed I
2、SO9001authentication) High & New Technological Enterprise Electric Control System For the RoundSize-Bridge Scraper FeederOPERATION MANUALDalian Like Technology Co.,Ltd Electrical Operation Manual For Bridge Scraper Feeder Protection&Faults Total 7 Pages No.6 The whole machine is installed pe
3、rfect protection program, warning and display system. 6.1 Heat Protection for Motor All motor are provided with heat protection. If the motor is overload, the sound annunciator will send out sound and light alarm. 6.2 Other Faults PLC determines the following cases as machine faults: 1. The 299 degr
4、ee stroke limit switch activate. 2. The rake has been exceed front or back limit. 3. Emergency stops. 4. The lubricate oil level is lower than the limit. 5. The inverter faults occur. 6. Middle control machine stops. 7. Rake or scraper coupling over-load. 8. Scraper chain broken. Note:The PLC stops
5、the machine when the faults in this chapter or chapter 6.1 appears. 6.3 Alarm There is also alarm display in the program,and the PLC does not stop the machine. Note:The operator can examine the faults or alarm point by enterring into the message picture when the cases in chapter 6.1 or 6.2 appears.
6、Electrical operation manual For the Bridge type Scraper Feeder Maintenance&Inspection Total 7 Pages No.7 During the daily and periodic maintenance or inspection,Besides the above mentioned points of safety, requirements, regulations, functions etc.,The following must also be included: 1. Inspect
7、 motor frequently. Carry out maintenance according to relative specifications. Before starting motor, manually inspect the loading conditions. 2. Check the cabinets, cases and electrical elements regularly. Pay attention at any moment that dust and foreign material shall not enter into the cabinets
8、and cases. Blow and clean once every shift. 3. The thermal-overload relays have been calibrated before leaving factor or during debugging. customer shall not adjust 4. Pay attention to the temperature, humidity and environment in console. Cabinets shall be dry because the touch screen and PLC, etc. are
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 员工生病协议书
- 小学实习协议书
- 诸暨就业协议书
- 资金入社协议书
- 薪酬协议劳动合同
- 鱼苗转让合同范本
- 2026河北沧州职业技术学院、沧州工贸学校高层次人才选聘23人参考考试试题及答案解析
- 鸭子收购合同范本
- 小学寒假协议书
- 药厂竞业协议书
- 统编版语文七年级上册第21课《小圣施威降大圣》教学课件
- 2024年中国人民银行直属事业单位招聘笔试真题
- (2025)公开选拔科级领导干部考试笔试试题和答案
- 四川省成都市青羊实验中学2024-2025学年上学期八年级英语试卷(含答案)
- 2025年中国药典凡例试题及答案
- 2025年米糠油行业分析报告及未来发展趋势预测
- 幼儿园绘本故事《安徒生童话故事拇指姑娘》课件
- 预付款协议书
- 2025有关房屋买卖合同书
- 诺如病毒知识培训课件
- 狮子王电影英语剧本中英对照学习
评论
0/150
提交评论