版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Switching Power Supply Fundamentals1 To start, we will review the basic operation of switching power supplies as a basis for understanding theselection criteria for the external components needed for optimum performance of the power supply. Despite the increasing popularity of monolithic switching r
2、egulators, linear regulators still dominate the market. Inexpensive and easy to use, these regulators can be found almost anywhere. Even so, understanding the differences between different types of linear regulators can be key to making the best use of this ubiquitous component. Buck Calculations fo
3、r Inductance Need to know V Output CapacitorSynchronous Buck Converters OfferVQ1 INVINFPWMENPGOODVDDFREQ10 msec/div1 msec/div©A reduction in start-up current is useful in situations where the input power source is limited in the amount of current it can deliver. In some applications Soft Start
4、can be used to replace under voltage lockout or The example of Soft Start above is from the LM2597 datasheet. The soft start feature reduces the startup down to 160 mA, and delays and slows down the output voltage rise time.Another situation where Soft Start is useful is in allowing the use of an in
5、ductor with a much lower saturation current than the current limit of the switcher. Soft Start prevents the high currents which wouldDeriving a Step-Up (Boost RegulatorInductor CurrentThe output capacitor in a boost converter is the reservoir that provides all the output current when theor a boost c
6、onverter a much lower capacitor ESR is required to get the same output ripple voltage as a buck regulator at the same current TYPICAL xDSLDUTY CYCLE V INside of the winding to the ground side of the winding. We have also changed because of the presence of leakage inductance. The leakage inductance s
7、tores energy, and delays the transfer of current to the secondary. Since the current must continue to flow, a path must be provided or very high voltage spikes will snubber across the primary provides a place to clamp the voltage, dissipating power from the energy stored in the leakage inductance.Op
8、eration on the output looks just like a boost converter and the input capacitor also must support large AC currents. This means big capacitors at both the input and output. The input capacitor is needed to bypass AC ©2006 National Semiconductor Corporation Deriving Positive Output Flyback2006 N
9、ational Semiconductor Corporation Another advantage of flyback converters is the ability to provide multiple outputs from a single regulator. Here is an example of a SIMPLE SWITCHER®regulator being used in a dual output flybackThe voltage on the regulated winding (the one with the output couple
10、d back to the F Need to know reverse voltage ratingTransorbsLow RDS(ONElectrical CharacteristicsCapacitance at rated voltage (ceramics!Voltage Rating, RMS current ratingAluminum ElectrolyticSpecialty Polymer1uF, 6.3V, 10051uF, 10V,16081uF, 16V, 16081uF, 25V,20121uF, 16V,20121uF, 40V, 32161uF, 25V,32
11、161uF, 50V, 3225Capacitor Data Provided By:Its a 1 uF Capacitorbut what capacitance are you getting?!?All curves are from high quality ceramic capacitors with good X5R or X7RSpecification ParameterSwitching Regulator Control Architectures31 Up to this point we have looked at switching converters as
12、being defined by the way in which similar external components are connected, and we have established selection criteria for those external components based on the operating conditions of each configuration. We have not shown how the feedback is achieved or the effects that a given topology will have
13、 on the stability of that feedback loop. Next we will address how the feedback loop controls the regulator and the precautions that are necessary for stable operation. First we will look at feedback in general,and how it applies to linear regulators, to form a basis for analysis of the more complex
14、switching regulator architectures.V INSOURCE d i v 100Voltage Mode BuckRegulators37 As noted earlier, identification of the poles (and zeros for a switching converter are not as easy as that for a linear regulator. Some understanding of the switcher architecture is required to ensure that stability requirements are met.In the beginning we looked at a similar block diagram
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026年河北承德市事业单位公开招聘(统一招聘)工作人员812人笔试备考试题及答案解析
- 2026年上海电力大学单招职业技能考试模拟试题含详细答案解析
- 2026广西梧州市社会福利院招聘18人笔试备考题库及答案解析
- 2025-2026广东佛山市南海区丹灶镇金沙中学度短期代课教师招聘3人笔试备考题库及答案解析
- 2026云南昆明市官渡区国有资产投资经营有限公司招聘5人笔试备考试题及答案解析
- 2026重庆市南岸区南坪实验四海小学招聘1人笔试备考试题及答案解析
- 2026江苏南通市海安市教体系统面向毕业生招聘教师63人笔试备考试题及答案解析
- 2026江西九江市瑞昌市投资有限责任公司下属江西鹏驰建设工程有限公司招聘2人笔试备考试题及答案解析
- 2026上半年甘肃事业单位联考甘肃省退役军人事务厅招聘5人笔试备考题库及答案解析
- 2026春季广西防城港市港口区企沙镇中学学期顶岗教师招聘笔试备考试题及答案解析
- 2026湖南衡阳日报社招聘事业单位人员16人备考题库完整答案详解
- 2026年广东省事业单位集中公开招聘高校毕业生11066名参考考试试题及答案解析
- 孕产妇血液管理专家共识贫血管理2026
- 2026年1月浙江首考英语真题(解析版)
- 2026北京资产管理有限公司业务总监招聘1人笔试参考题库及答案解析
- 《中华人民共和国危险化学品安全法》全套解读
- 士兵职业基本适应性检测试题及答案
- 2025产品数字护照(DPP)技术发展报告
- 安全管理规程的建模规划
- AI情绪辅导与放松音乐创新创业项目商业计划书
- 鼻咽喉镜的NBI技术
评论
0/150
提交评论