1、Soft Tech Development Inc.1Software Project TrackingA CMM Level 2Key Process AreaSoft Tech Development Inc.天马行空官方博客:http:/ ;QQ:1318241189Soft Tech Development Inc.2Purpose The purpose of Software Project Tracking and Oversight is to provide adequate visibility into actual progress so that management
2、 can take effective actions when the projects performance deviates significantly from the plans. Software Project Tracking and Oversight involves tracking and reviewing the accomplishments and results against documented estimates, commitments, and plans, and adjusting these plans based on the actual
3、 accomplishments and results.天马行空官方博客:http:/ ;QQ:1318241189Soft Tech Development Inc.3Goals Goal 1 Actual results and performances are tracked against the software plans. Goal 2 Corrective actions are taken and managed to closure when actual results and performance deviate significantly from the sof
4、tware plans. Goal 3 Changes to software commitments are agreed to by the affected groups and individuals.Soft Tech Development Inc.4Commitment A project software manager is designated to be responsible for the projects software activities and results. The project follows a written organizational pol
5、icy for managing the software project.Soft Tech Development Inc.5Ability A software development plan for the software project is documented and approved. The project manager explicitly assigns responsibility for work products and activities. Adequate resources and funding are provided for tracking t
6、he software project. The managers are trained in managing the technical and personnel aspects of the project. First-line managers receive orientation in the technical aspects of the project.Soft Tech Development Inc.6Activities1. A documented software development plan is used for tracking the softwa
7、re activities and communicating status.2. The projects software development plan is revised according to a documented procedure.3. Software project commitments and changes to commitments made to individuals and groups external to the organization are reviewed with senior management according to a do
8、cumented procedure.Soft Tech Development Inc.7Activities4. Approved changes to commitments that affect the software project are communicated to the members of the software engineering group and other software-related groups.5. The size of the software work products (or size of the changes to the sof
9、tware work products) are tracked, and corrective actions are taken as necessary. The projects software effort and costs are tracked, and corrective actions are taken as necessary.Soft Tech Development Inc.8Activities6. The projects critical computer resources are tracked, and corrective actions are
10、taken as necessary.7. The projects software schedule is tracked, and corrective actions are taken as necessary.8. Software engineering technical activities are tracked, and corrective actions are taken as necessary.9. The software risks associated with cost, resource, schedule, and technical aspects
11、 of the project are tracked.Soft Tech Development Inc.9Activities10. Actual measurement data and replanning data for the software project are recorded.11. The software engineering group conducts periodic internal reviews to track technical progress, plans, performance, and issues against the softwar
12、e development plan.12. Formal reviews to address the accomplishments and results of the software project are conducted at selected project milestones according to a documented procedure.Soft Tech Development Inc.10Measures Measurements are made and used to determine the status of the software tracki
13、ng and oversight activities. Examples of measurements include: effort and other resources expended in performing the tracking and oversight activities; and change activity for the software development plan, which includes changes to size estimates of the software work products, software cost estimat
14、es, critical computer resource estimates, and schedule.Soft Tech Development Inc.11Verification The activities for project tracking and oversight are reviewed with senior management on a periodic basis. The activities for project tracking and oversight are reviewed with the project manager on both a
15、 periodic and event-driven basis. The software quality assurance group reviews and/or audits the activities and work products for project tracking and oversight and reports the results.Soft Tech Development Inc.12Coverage Goal 1Actual results and performance are tracked against the plansThe software
16、 group uses the project plan AC 1 and conducts periodic internal reviews AC12 to track: product size AC 5 effort and cost AC 6 critical computer resources AC 7 project schedule AC 8 technical activities AC 9 project risks AC 10Measurement and re-planning data are recorded AC 11Formal reviews are hel
17、p at key milestones AC 13Soft Tech Development Inc.13Coverage Goal 2Corrective actions are taken and managed to closureThe following are tracked and corrective actions taken: product size AC 5 effort and cost AC 6 critical computer resources AC 7 project schedule AC 8 technical activities AC 9Measurement and re-planning data are recorded AC 11The project plan is revised using a documented procedure AC 2Soft Tech Development Inc.14Coverage Goal 3Changes to commitments are agreedCommitments and changes to commitments with external groups are reviewed with senior m
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 中国医科大学《化工仪表自动化》2023-2024学年第二学期期末试卷
- 湖北师范大学《机械零件测绘与计算机绘图综合实训》2023-2024学年第二学期期末试卷
- 长春师范高等专科学校《藏医药史》2023-2024学年第二学期期末试卷
- 兰州现代职业学院《软件工程经济学》2023-2024学年第二学期期末试卷
- 云南水利水电职业学院《材料导论》2023-2024学年第二学期期末试卷
- 兰州资源环境职业技术大学《环境人体工程学》2023-2024学年第二学期期末试卷
- 湖南冶金职业技术学院《地下建筑结构》2023-2024学年第二学期期末试卷
- 临时演出合同范例
- 公寓售卖南宁合同范例
- 2025二手汽车买卖合同2
- 【课件】在奉献中成就精彩人生 2024-2025学年统编版道德与法治七年级上册
- 2024至2030年成都市酒店市场前景调查及投资研究报告
- 网络安全保障服务方案(网络安全运维、重保服务)
- 创伤愈合的相关知识
- DL∕T 1474-2021 交、直流系统用高压聚合物绝缘子憎水性测量及评估方法
- 施工材料采购及配送 投标方案(技术方案)
- 国能辽宁北票 200MW 风力发电项目矿产压覆评估报告
- 文创产品国内研究现状分析
- 2024年江苏省苏州市吴江区中考物理一模试卷附答案解析
- 项目驻地(营区)风险评估报告
- 幼儿卫生与保健 课程标准
评论
0/150
提交评论