




版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、精选优质文档-倾情为你奉上最全的钢结构术语(中英对照)Aacceptable quality 合格质量 acceptance lot 验收批量 aciera 钢材 admixture 外加剂 against slip coefficient between friction surface of high-strength bolted connection 高强度螺栓摩擦面抗滑移系数aggregate 骨料 air content 含气量 air-dried timber 气干材 allowable ratio of height to sectional thickness of maso
2、nry wall or column 砌体墙、柱容许高厚比 allowable slenderness ratio of steel member 钢构件容许长细比 allowable slenderness ratio of timber compression member 受压木构件容许长细比 allowable stress range of fatigue 疲劳容许应力幅 allowable ultimate tensile strain of reinforcement 钢筋拉应变限值 allowable value of crack width 裂缝宽度容许值 allowable
3、 value of deflection of structural member 构件挠度容许值 allowable value of deflection of timber bending member 受弯木构件挠度容许值 allowable value of deformation of steel member 钢构件变形容许值 allowable value of deformation of structural member 构件变形容许值 allowable value of drift angle of earthquake resistant structure 抗震结
4、构层间位移角限值 amplified coefficient of eccentricity 偏心距增大系数 anchorage 锚具 anchorage length of steel bar 钢筋锚固长度 approval analysis during construction stage 施工阶段验算 arch 拱 arch with tie rod 拉捍拱 arch-shaped roof truss 拱形屋架 area of shear plane 剪面面积 area of transformed section 换算截面面积 aseismic design 建筑抗震设计 asse
5、mbled monolithic concrete structure 装配整体式混凝土结构 automatic welding 自动焊接 auxiliary steel bar 架立钢筋Bbackfilling plate 垫板 balanced depth of compression zone 界限受压区高度 balanced eccentricity 界限偏心距 bar splice 钢筋接头 bark pocket 夹皮 batten plate 缀板 beam 次梁 bearing plane of notch 齿承压面 bearing plate 支承板 bearing stif
6、fener 支承加劲肋 bent-up steel bar 弯起钢筋 block 砌块 block masonry 砌块砌体 block masonry structure 砌块砌体结构 blow hole 气孔 board 板材 bolt 螺栓 bolted connection (钢结构螺栓连接 bolted joint (木结构螺栓连接 bolted steel structure 螺栓连接钢结构 bonded prestressed concrete structure 有粘结预应力混凝土结构 bow 顺弯 brake member 制动构件breadth of wall betwee
7、n windows 窗间墙宽度 brick masonry 砖砌体 brick masonry column 砖砌体柱 brick masonry structure 砖砌体结构 brick masonry wall 砖砌体墙 broad-leaved wood 阔叶树材 building structural materials 建筑结构材料 building structural unit 建筑结构单元building structure 建筑结构 built-up steel column 格构式钢柱 bundled tube structure 成束筒结构burn-through 烧穿
8、butt connection 对接butt joint 对接 butt weld 对接焊缝Ccalculating area of compression member 受压构件计算面积 calculating overturning point 计算倾覆点 calculation of load-carrying capacity of member 构件承载能力计算 camber of structural member 结构构件起拱 cantilever beam 挑梁 cap of reinforced concrete column 钢筋混凝土柱帽 carbonation of c
9、oncrete 混凝土碳化 cast-in-situ concrete slab column structure 现浇板柱结构 cast-in-situ concrete structure 现浇混凝土结构 cavitation 孔洞 cavity wall 空斗墙 cement 水泥 cement content 水泥含量 cement mortar 水泥砂浆 characteriseic value of live load on floor or roof 楼面、屋面活荷载标准值 characteristi cvalue o fwindload 风荷载标准值 characteristi
10、c value of concrete compressive strength 混凝土轴心抗压强度标准值 characteristic value of concrete tensile strength 混凝土轴心抗拉标准值characteristic value of cubic concrete compressive strength 混凝土立方体抗压强度标准值 characteristic value of earthquake action 地震作用标准值 characteristic value of horizontal crane load 吊车水平荷载标准值 charac
11、teristic value of masonry strength 砌体强度标准值 characteristic value of permanent action 永久作用标准值 characteristic value of snowload 雪荷载标准值 characteristic value of strength of steel 钢材强度标准值 characteristic value of strength of steel bar 钢筋强度标准值 characteristic value of uniformly distributed live load 均布活标载标准值
12、 characteristic value of variable action 可变作用标准值 characteristic value of vertical crane load 吊车竖向荷载标准值 charaeteristic value of material strength 材料强度标准值 checking section of log structural member, 原木构件计算截面 chimney 烟囱 circular double-layer suspended cable 圆形双层悬索 circular single-layer suspended cable 圆
13、形单层悬索 circumferential weld 环形焊缝 classfication for earthquake-resistance of buildings 建筑结构抗震设防类别 clear height 净高 clincher 扒钉 coefficient of equivalent bending moment of eccentrically loaded steel memher (beam-column 钢压弯构件等效弯矩系数 cold bend inspection of steelbar 冷弯试验 cold drawn bar 冷拉钢筋 cold drawn wire
14、 冷拉钢丝 cold-formed thin-walled sectionsteel 冷弯薄壁型钢 cold-formed thin-walled steel structure 冷弯薄壁型钢结构 cold-rolled deformed bar 冷轧带肋钢筋 column bracing 柱间支撑 combination value of live load on floor or roof 楼面、屋面活荷载组合值compaction 密实度 compliance control 合格控制 composite brick masonry member 组合砖砌体构件 composite fl
15、oor system 组合楼盖 composite floor with profiled steel sheet 压型钢板楼板 composite mortar 混合砂浆 composite roof truss 组合屋架 compostle member 组合构件 compound stirrup 复合箍筋 compression member with large eccentricity 大偏心受压构件 compression member with small eccentricity 小偏心受压构件 compressive strength at an angle with slo
16、pe of grain 斜纹承压强度 compressive strength perpendicular to grain 横纹承压强度 concentration of plastic deformation 塑性变形集中 conceptual earthquake-resistant design 建筑抗震概念设计 concrete 混凝土 concrete column 混凝土柱 concrete consistence 混凝土稠度 concrete floded-plate structure 混凝土折板结构 concrete foundation 混凝土基础 concrete mi
17、x ratio 混凝土配合比 concrete wall 混凝土墙 concrete-filled steel tubular member 钢管混凝土构件 conifer 针叶树材 coniferous wood 针叶树材 connecting plate 连接板 connection 连接 connections of steel structure 钢结构连接 connections of timber structure 木结构连接 consistency of mortar 砂浆稠度 constant cross-section column 等截面柱 construction an
18、d examination concentrated load 施工和检修集中荷载 continuous weld 连续焊缝 core area of section 截面核芯面积 core tube supported structure 核心筒悬挂结构 corrosion of steel bar 钢筋锈蚀 coupled wall 连肢墙 coupler 连接器 coupling wall-beam 连梁 coupling wall-column. 墙肢 coursing degree of mortar 砂浆分层度 cover plate 盖板 covered electrode 焊条
19、 crack 裂缝 crack resistance 抗裂度 crack width 裂缝宽度 crane girder 吊车梁crane load 吊车荷载 creep of concrete 混凝土徐变 crook 横弯 cross beam 井字梁 cup 翘弯 curved support 弧形支座 cylindrical brick arch 砖筒拱Ddecay 腐朽 decay prevention of timber structure 木结构防腐 defect in timber 木材缺陷 deformation analysis 变形验算 degree of gravity
20、vertical for structure or structural member 结构构件垂直度 degree of gravity vertical forwall surface 墙面垂直度 degree of plainness for structural memer 构件平整度 degree of plainness for wall surface 墙面平整度 depth of compression zone 受压区高度 depth of neutral axis 中和轴高度 depth of notch 齿深 design of building structures 建
21、筑结构设计 design value of earthquake-resistant strength of materials 材料抗震强度设计值 design value of load-carrying capacity of members 构件承载能力设计值designations 0f steel 钢材牌号 designvalue of material strength 材料强度设计值 destructive test 破损试验 detailing reintorcement 构造配筋 detailing requirements 构造要求 diamonding 菱形变形 dia
22、phragm 横隔板 dimensional errors 尺寸偏差 distribution factor of snow pressure 屋面积雪分布系数 dogspike 扒钉 yield strength (yield point of steel 钢材(钢筋屈服强度(屈服点)Carry out drilling operation in accordance with the drilling program. 按钻井程序进行钻井作业.Prepared bell nipple. 准备”喇叭口”短节.Make up 2 joints of drill pipe. 接两根钻杆.Brea
23、k out this connection. 卸开该接头.Run hole opener to sea bed. 下扩眼器到海底Mix gel fluid for drilling conductor hole. 为钻导管井眼配制高粘度泥浆.Make up bottom hole assembly. 组合下部钻具Check and reset crown-saver on every tour. 每个班都要检查并重新调整天车防碰装置.Number stands on trip out and trip in. 起下钻时给立柱编号.Pick up BHA and run to seafloor.
24、 将下部钻具下到海底.Pick up stands. 接立柱Dont drill faster than 15 minutes for 1 stand. 钻进速度别超过15分钟1根立柱Drop TOTCO. 投(陶特)测斜仪Fish TOTCO with overshot. 用打捞筒捞起测斜仪Resume drilling to T.D. 继续钻进到总深Circulate 15 minutes.循环15分钟Run in hole. 下钻Put out of hole. 起钻Make an inventory of all ring gaskets. 开一个所有垫圈的清单Use spinning
25、 tong. 使用气动扳手Operate the air winch. 操作气动绞车Lay down 57 joints of 5” drill pipe. 甩57根钻杆Pick up drill stem test tool. 提起钻杆测试工具Circulate mud for 2 hours. 循环泥浆2小时Move string during circulation. 在循环时注意活动钻具Circulate hole clean. 循环清洗井眼Circulate bottoms up. 循环泥浆几周Fill up every 5 stands. 每5柱灌泥浆一次Check mud wei
26、ght every 15 minutes. 每15分钟检查泥浆比重Reverse out excess cement. 反循环替出多余的泥浆Change/replace old mud by new mud. 用新的泥浆替换出旧的泥浆Stop drilling. 停止钻进Drilling ahead. 钻进Pull out of hole bit. 起出钻头Change bit. 换钻头Run the wear bushing. 下抗磨补心The bit thread type is regular pin. 钻头丝扣是正规公扣Whats the make-up torque? 上扣扭矩要多大
27、?Run in 9” collars. 下9”钻铤The cathead cant give enough torque. 猫头力量不够Connect crossover sub. 接上配合接头The tong angle is too small. 大钳的角度太小了Stop circulating. 停止循环泥浆Break out the stand. 卸立柱Set the single into the mousehole. 把这个单根放进鼠洞Can we break out the pipe with rotary table? 可用转盘卸扣吗?No! Break it out with
28、 tong. 不行! 要用大钳卸扣Spin it out with the air spanner. 用气动扳手卸扣Put the pipe wiper on the string. 装上钻杆刮泥器Dont set this stand back. 这根钻杆不要放在钻杆盒上Make up the lift sub. 接好提升短节Secure the safety clamp. 上紧安全卡瓦The bit is nearing the shoe. 钻头快到套管鞋了Slow down the running speed. 放慢下放速度This is the undergauged interval
29、. 这是缩径井段This is the drilling program. 这是钻井设计书How much weight on bit is required? 要加多少钻压?Keep the rotary speed at 120-140 RPM. 转速保持120-140转/分Keep the flow rate at 3000 LPM. 保持排量3000升/分The pump pressure is too high. 泵压太高了Dont ream the hole too fast. 划眼不要太快Notice the rotary torque. 注意转盘扭矩的变化The penetra
30、tion rate is getting slower. 钻速变慢了The bit is nearly worn out. 钻头快磨光了Stop drilling at 2000 meters. 钻至2000米停钻Circulate for one hour. 循环一个小时The pump pressure has increased. 泵压升高了One nozzle may be plugged. 可能有一个水眼(或: 喷嘴)堵了What is the hook load? 悬重多少?Whats the pick-up weight? 上提重量是多少?Whats the lowering w
31、eight? 下放重量是多少?Run in HWDP. 下加重钻杆A stabilizer is needed here. 这里需要一个扶正器This is a flexible sub. 这是挠性接头This is the BHA log. 这是下部钻具组合记录Record all outside and inside diameters. 记录好所有(入井工具的)内外径We need a short drill collar. 需要一根短钻铤Pull the cat line. 拉猫头Operate the break lever. 操作(或:扶)刹把Stop the pumps. 停泵M
32、ake a wiper trip. 通井Retrieve wear bushing. 取出抗磨补心Bleed off pressure. (释)放压(力)Keep 5 wraps on the drum. 滚筒上留5圈Set slips. 座上卡瓦If tight hole, repeat wiper trip. 如果井眼紧, 重复划眼Setback bottom hole assembly. 将下部钻具立于钻杆盒内Make sure all alarms are on. 确保所有的警报信号都开着Lay down TDS spinner. 拆下顶部驱动的旋扣器Run in hole bit #
33、15 to bottom. 用15号钻头下钻到井底Run in hole to casing shoe. 下钻至套管鞋Pick up same bit and BHA. 装上同样的钻头和钻具组合Lay down 5” HW drill pipe. 甩5”加重钻杆Move string every 2 hours. 每2小时活动钻具一次Keep area around shaker clean. 保持振动筛区域干净Control trip gas. 控制起下钻气Ream if needed. 如必要时进行划眼Select the best penetration rate. 选择最佳钻进速度Fi
34、x the traveling assembly. 固定游动系统100. Check power tongs and spinning rope are on drill floor. 检查动力钳和尾绳是否在钻台Whats the weight on bit? 钻压是多少?What is the BHA of this well? 这口井的下部钻具如何组合?Drill out cement. 钻穿水泥Latch the elevator. 扣吊卡Unlatch the elevator. 开吊卡Set the slips. 放卡瓦Adjust the crown-o-matic (crown
35、saver). 调整防碰天车Lock the hook pin. 锁紧大钩销子Check OD of stabilizer. 检查扶正器的外径Perform leak off test. 进行地层破裂(或:渗漏)测试Connect kill and choke line. 接上压井和放喷管线Reverse out the drill pipe. 反循环清洗钻杆Make a short trip. 进行短途起下钻Change the cutters. 换割刀Slug the pipe. 灌重泥浆Drill the stand down. 钻完立柱Start/run the shale shake
36、r. 开振动筛Start the desanders. 开除砂器Start the desilters. 开除泥器Change it with a 40 mesh screen. 换成40目筛布Shut it off. 关掉Pull it to the cat ramp. 把它拉到坡道上去Make a fast connection. 接单根要快Dont dump the mud into the sea. 不要把泥浆排放到海里Disconnect it with a chain tong. 用链钳卸开Put a thread protector. 加一个(丝扣)护箍Can we use th
37、e power slips? 可以使用动力卡瓦吗?Casing and Cementing 下套管与固井Run in hole to bottom for wiper trip. 下钻通井This is the casing program. 这是套管程序Prepare for running casing. 准备下套管Make everything ready for running 7”casing. 做好下7”套管的准备Make cementing job. 固井Displace cementing with mud pump. 用泥浆泵替泥浆Set cement plug from 2
38、940 to 2790m. 在2940到2790米井段打水泥塞Pick up cementing head. 接水泥头Cement samples are hard. 水泥样已凝固Pump in 3 cubic meters of spacer. 注3方隔离液Pump down the plug. 泵压(胶)塞Wait on cement. 候凝The guide shoe will be connected. 接引鞋Connect the floor collar. 接浮箍Connect the air line to the casing stabbing board. 接好套管扶正台的气
39、管线Run casing with the 350T slip elevator. 用350吨卡瓦式吊卡下套管Clean and dry 20” casing threads with rags. 清洁并擦干20”套管丝扣Where is the rabbit for drifting the casing? 套管通径规在哪里?Rig Move, Anchoring and Positioning 拖航, 抛锚, 定位What is our position now? 我们现在船位在哪里?Whats the moving speed now? (Whats the towering speed
40、?) 拖航速度是多少?The speed is about 4 knots. 船速是4节左右Which one is the main tug? 主拖是哪条船?The main tug is Nanhai 205. 主拖是南海205Which one is the chase boat? 护航船是哪一条?How much is the horse power? 有多大马力?She has 6000 HP. 有6000马力Move the rig off location 50 feet. 将平台移开50英尺We are ready to drop the anchor. 我们已经做好抛锚的准备
41、了Secure all the movable equipment. 固定好各种活动的设备Preload. (自升式)压载Ballast. (半潜式)压载Put the preload water into the tank. 向压载舱灌压压载水We need 5500 tons of preload water. 需要5500吨压载水Shall we preload right now? 马上开始压载吗?Drain the water off. 放水The rig is overloaded. 平台已超载Jack up (jack down) the rig. 升(降)船The draft
42、is 3.5 meters. 船体吃水3.5米The jetting pressure is 100psi. 冲桩压力是100psiPenetrate the legs. 插桩How much penetration do we have? 入泥多深了?No.1 and No.2 legs indicate 10 meters. 1,2号桩腿插入10米Fix the upper and lower wedges. 固定上下楔块Pay out the anchor line. 放出锚缆绳Skid the derrick. 移开井架The rig is short of potable water now. 平台缺乏饮用水Drop No.2 and No.3 anchors. 抛2号和3号锚Why ha
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 广西贺州市本年度(2025)小学一年级数学部编版随堂测试((上下)学期)试卷及答案
- 2025届福建省龙岩市武平县第二中学高考英语押题试卷含答案
- 食品理化检验模拟习题+答案
- 天津市第八十二中学英语2024-2025学年高二下学期期中英语试题(原卷版+解析版)
- 纤维制品的跨境电商物流解决方案考核试卷
- 自行车骑行与城市绿色经济发展考核试卷
- 煤炭燃料发电与余热利用考核试卷
- 丝织品在交通领域的应用考核试卷
- 聚噻吩纤维在有机光伏领域的应用考核试卷
- 燃油零售风险管理与防范考核试卷
- 医院医学伦理审查委员会章程
- 废弃物管理制度范本
- 房地产销售价格优惠申请表-
- 基于交通冲突的信号交叉口交通安全评价研究论文设计
- 绿化自动滴灌系统施工方案
- 处理突发事件流程图
- 铜螺母标准相关参考内容
- 2023年梅毒诊疗指南
- 医疗卫生系统招聘《医学基础知识》备考题库资料宝典(核心题版)
- 使用说明书仪表8530d技术手册
- 五金工具零售规章制度
评论
0/150
提交评论