1、表H-421母线安装记录Bus installation record项目:Project装置:Unit工号:Section名称Name施工日期Date电压等级VoltagekV图号Drawing No.母线型号、规格Bus model and spec.套管、绝缘子型号Bushing insulator model1、一般安装检查: General installation inspection序号No.检查调整项目Inspection and adjustment item安装检查结果Inspection result1母线型号、规格、材质核对Bus model, spec, and ma
2、t. Inspection型号 规格 材质 Model Specification Material2绝缘子、穿墙套管检查Insulator and lead-in insulator型号规格 油位、密封 绝缘 Model Oil level, seal Insulation3母线支架制作安装Bus support fabrication and installation规格 安装尺寸 防腐 Spec. Dimension Anti-corrosion4母线安装检查Bus installation排列、相色 弯曲倍率 伸缩节 Arrangement, color Curve radius Ex
3、pansion joint5连接螺栓、垫圈检查Bolt and washer inspection规格 热镀锌 露出长度 Spec. Galvanization Left length6母线接触面Bus contact area inspection光洁平整 搪锡 电力复合脂 Smooth. Enam. Polymer7硬母线焊接检查Rigid bus welding inspection焊工合格证号Weldor No.8软母线、组合母线安装Flexible and combine bus installation2、母线接触面连接紧密检测:Bus contact. Tightness ins
4、pection螺栓规格(mm)Bolt spec.实测力矩值(N.m)Actual torque螺栓规格(mm)Bolt spec.实测力矩值(N.m)Actual torque螺栓规格(mm)Bolt spec.实测力矩值(N.m)Actual torque最小值Min.最大值Max.最小值Min.最大值Max.最小值Min.最大值Max.3、软母线弛度:Flexible bus sag inspection软母线名称Flexible bus name设计弛度(mm)Design sag实测弛度(mm)Actual sag4、母线相同、对地最小距离检测:Bus phase and phase
5、 to earth min. Distance measure母线类别Bus type主母线Main分支母线Branch实测最小相间距离(mm)Min. Phase to phase distance实测最小对地距离Min. Phase to earth distance备注:Remarks结论:Conclusion技术负责人Check施工人Operator表H-422蓄电池充(放)电记录Storage battery charging/Discharging record项目:Project装置:Unit工号:Section名称Name型号Model出厂日期Manuf. Date电压Volt
6、ageV容量capacityAh电池总数Number of battery电解液Electrolyte电解液化验单或合格证号Electrolyte report or certification No.蒸馏水化验单或合格证号Distilled water report or certification No.注入时电解液温度Electrolyte temp. at filling电解液比重Specific gravity of electrolyte开始注入时间Filling start time结束时间End time初充电First charging充电开始时间Charging start
7、 time结束时间End time单独补充充电的电池编号Separately charged cell No.放电Discharging放电开始时间Discharge start time结束时间End time放电电流Discharge current放电容量Discharging capacity为额定容量的%(换算到25时) % of rated capacity (at 25)充(放)电特性曲线图:(充放电记录见附表)Charging/Discharging characteristic curve备注:Remarks结论:Conclusion技术负责人Check施工人Operator
8、表H-424电机抽芯检查记录Motor loose-core inspection record项目:Project装置:Unit工号:Section名称Name位号Tag. No.检查日期Inspection Date型号Type额定容量Rated capacitykW额定电压Rated voltagekV额定电流Rated currentA接法Connection绝缘等级Insulation class转速Rotation speedr/min转子结构Rotor structure防爆等级Explosion proof class出厂编号Manufacturer No.制造厂Manufac
9、turer防护等级Prevention class检 查 内 容Installation contents标记Mark备 注Remark铁芯轴颈无伤痕锈蚀No Damage & corrosion on surface of core shaft滑环和换向器无伤痕、锈蚀No Damage & corrosion on surface of commutator and slip-ring 绕组绝缘层完好,绑线无松动Winding insulation coating and fixing inspection绕组连接正确,焊接良好Winding connection and w
10、elding inspection绕组电阻检测合格Winding resistance inspection定子槽楔无断裂凸出及松动,端部槽楔牢固Stator slot wedge inspection转子平衡块紧固,平衡螺丝锁车Rotor balance block and bolt fixing inspection风扇完好,方向正确Fan inspection磁极及铁轭固定良好Magnetic pole and hub fixing inspection励磁绕组紧固Exciter winding fixing inspection 鼠笼式电机转子导电条和端环焊接良好,浇铸无裂纹Rotor
11、 conductor and end link of squirrel-cage motor轴承滚动体与内、外圈转动灵活无松动、卡涩Bearing rotating flexibility inspection加入轴承内的润滑脂已填满内部空间的三分之二Internal space of bearing is filled with lubrication grease电机机部清洁无杂物Motor internal cleanliness inspection结论:Conclusion技术负责人Check施工人Operator表H-425电机干燥记录Motor drying record项目:P
12、roject装置:Unit工号:Section名称Name位号Tag. No.干燥日期Drying Date型号Type额定容量Rated capacitykW绝缘等级Insulation class定子电压Stator voltageV转子电压Rotor voltageV制造厂Manufacturer定子电流Stator currentA转子电流Rotor currentA出厂日期Manuf. Date接线Connection转速Rotation speedr/min出厂编号Manufacturer No.干燥方法简述Brief discription of drying method干燥开
13、始时间Drying start time 年 月 日 时 分Date干燥结束时间Drying end time 年 月 日 时 分Date干燥过程最高温度Max. drying temp.定子 Stator转子 Stator干燥后绝缘电阻及吸收比Insulation resistance and absorptance after drying.测试部位Test position定子对地Stator to earth转子对地Rotor to earth电机温度()Motor temperatureR15"(M)R60"(M)KR15"(M)R60"(M)
14、K备注:Remarks结论:Conclusion技术负责人Check施工人Operator表H-426电机干燥记录附表Attached table for motor drying record项目:Project装置:Unit工号:Section时间Time温度()Temp.定子绝缘电阻(M)Stator ins. resistance转子绝缘电阻(M)Rotor ins. resistance干燥电流(A)Drying current备注Remark123456测温点位置:nTemp. measure position 1. ;2. ;3. ; 4. ;5. ;6. ;技术负责人Check
15、施工人Operator日期Date表H-427电机试车记录Motor test run record项目:Project装置:Unit工号:Section序号No.电机名称或位 号Motor name or tag. No.额定数据Rated data试车记录数据Test run record data环境温度()Envi-ronment temp.试车日期Date容量(kW)Capa-city电压(V)Vol-tage电流(A)Curr.绝缘等级Ins. class绝缘电阻(M)Ins. resis.电压(V)Vol-tage空载电流(V)Vol-tage负载电流(A)No-Load cur
16、r.电机温度(A)Motor temp.轴承温度()Bearing temp.前Front后Rear备注:Remarks结论:Conclusion技术负责人Check施工人Operator表H-428架空线路施工记录Overhead line stringing record项目:Project装置:Unit工号:Section线路名称Line name施工日期Date线路电压Voltage线数Line number线路长度Length线路起点Start place线路终点End place施工记录Stringing record电杆型号、规格及数量Pole model, spec. Quan
17、tity拉线材料及组数Stay material and quantity导线型号及规格Line model and spec.路灯型号及数量Road lamp model and quantity绝缘子型号及规格Insulator model and spec.路灯线型号及规格Road line model and spec.弛度Sag耐张杆号(号一号)Anchor pole (No. No.)设计弛度(mm)Design sag实测驰度(mm)Real sag环境温度()Environment temp.对地、交叉跨越距离测量:Line to earth and to cross-over
18、 objects distance measurement跨越杆号号一号Cross-over pole No.-N0.被跨越物名称Cross-over object name被跨越物对最近杆、塔的水平距离(m)The nearest distance between crossover object and pole导线对被跨越物的最小垂直距离(m)Min. Vertical distance from line to cross-over object温度()Temp.线中绝缘电阻(M)Line insulation resistanceAB,C,E,OBA,C,E,OCA,B,E,O相位检
19、查Phase sequence inspection备注:Remarks结论:Conclusion技术负责人Check施工人Operator表H-429避雷、接地装置安装记录Lightning conductor and earthing device installation record项目:Project装置:Unit工号:Section名称Name施工图号Drawing No.1.绘图或简述避雷及接地装置情况(种类、材质、规格、长度、埋入深度、数量、连接方法、尺寸及防腐等)Drawing or brief discription of the lightning conductor a
20、nd earthing device (kind, material, specification, buried length, quantity, connection, dimension and anti-corrosion, etc.)2.接地电阻测量记录Grounding resistance measurement record序号No.测试位置Measure position接地电阻()Ground. resistance试验日期Measure date当天及三天前天气情况Weather of the day and three days ago备注:Remarks结论:Con
21、clusion技术负责人Check施工人Operator试验人Tester表H-430 电气安装记录Electrical installation record项目:Project装置:Unit工号:Section技术负责人Check施工人Operator表H-431交流电机试验报告AC Motor test report项目:Project装置:Unit工号:Section名称Name位号Tag. No.试验日期Test Date额定容量Rated capacity(kW)型号Model出厂编号Manuf. No.绝缘等级Insulation class定子电压Stator voltageV
22、定子电流Stator currentA额定转速Rated rpmr/min接线方式Connect mode转子电压Rotor voltageV转子电流Rotor currentA相数Phase number防爆等级E. P. class直流电阻测量DC Resistance measure 温度Temp. 定子绕组相别Stator phase直流电阻()DC Resistance转子绕组相别()Rotor phase直流电阻()DC Resistance各相直流电阻差别DC Resistance deviation定子Stator %;转子Rotor %;定子绕组极性Stator wind,
23、polar.绝缘试验Insulation test绕组名称Wind name绝缘电阻(M)Ins. resis吸收比Absorp-tance交流耐压电压(kV)AC Withstanding voltage时间(mm)Time直流耐压电压(kV)DC Withstanding voltage时间(mm)Time直流泄漏电流(A)DC Leakage current定子绕组Stator wind转子绕组Rotor wind电机轴承绝缘电阻(M)Bearing ins. resistance附属设备检查Auxiliary device test设备名称Device name绝缘电阻(M)Insul
24、ation resistance直流电阻()DC Resistance起动电阻器Start-up resistor可变电阻器Variable resistor灭磁电阻器Magnetic extinguisher备注:Remarks结论:Conclusion技术负责人Check试验人Operator表H-432直流电机试验报告DC motor test report项目:Project装置:Unit工号:Section名称Name位号Tag. No.试验日期Test Date额定容量Rated capacitykW型号Model出厂编号Manuf. No.励磁方式Excite mode额定电压R
25、ated voltageV额定电流Rated currentA额定转速Rated rpmr/min工作率Work ratio励磁电压Excite voltageV励磁电流Excite currentA1.试验与检查Test and inspection 环境温度:Environment temp. 励磁绕组的绝缘电阻及交流耐硬度试验Excite wind. Ins. R & AC withstanding voltage test M kV min电枢的绝缘电阻及交流耐压试验Armtr. Ins. R & AC withstanding voltage test M kV mi
26、n励磁绕组的直流电阻Excite wind DC resistance电枢整流片间的直流电阻Armtr. Back-to-back DC resistance励磁可变电阻器的直流电阻DC R of Excite variable resistor绕组极性及其接线检查Wind. Polar. & connection碳刷位置检查Brush position inspection2.发电机的空载特性Generator no-Load characteristics励磁电流(A)Excite current电压(V)Voltage备注:Remarks结论:Conclusion技术负责人Che
27、ck试验人Operator表H-433变压器试验报告Transformer test report项目:Project装置:Unit工号:Section名称Name位号Tag. No.试验日期Test Date额定容量Rated capacitykVA型号Model出厂编号Manuf. No.接线组别Connection额定电压Rated voltagekV额定电流Rated currentA阻抗Resistance%冷却方式Cool. mode直流电阻测量:AC Resistance measure 温度: Temp. 高压侧HV side()()()()()低压侧LV side电阻()Re
28、sistanceA a B b C c 误差 %Error变压比检查:Transformer rate inspection分接开关位置Tap position标称变比Nominal rate高压侧电压/低压侧电压HV/LV实测变压比Real rate变压比误差(%)Rate errorUAB/Uab(V)UBC/Ubc(V)UCA/Uca(A)ABBCCAABBCCA绝缘试验:Insulation test项 目Item绝缘电阻及吸收比Ins. R and Absorbt R60"/R15"交流耐压试验AC withstanding voltage test直流泄漏试验D
29、C leakage test介质损失角正切值Loose tgR60"/R15"吸收比Absorb-tance电压(kV)Voltage时间(min)Time电压(kV)Voltage电流(A)Currenttg(%)温度()Temp.高压低压及地HVLV/Earth低压高压及地LVHV/Earth绝缘油试验:油号 #;五次击穿电压平均值: kVIns. Oil test: oil No. , average voltage for 5 break down is 接地组别或极性检查Connection inspection备注:Remarks结论:Conclusion技术负
30、责人Check试验人Operator表H-434断路器试验报告Circuit breaker test report项目:Project装置:Unit工号:Section名称Name位号Tag. No.试验日期Test Date型号Model额定电压Rated voltagekV额定电流Rated currentA开断电流M. currentkA操动机构型号Operation mechanism操作电压Oper. voltage出厂编号Manuf. No.导电回路直流电阻测量DC Resistance of primary circuit真空断路灭弧室真空度检查Vacuum insp. for
31、 vacuum breaker六氟化硫断路器气体压力Gas press. Insp. for SF6 breaker相别Phase主触头()Main contact灭弧触头()Arc-Extinguishing contact相别Phase电压(kV)Voltage时间(min)Time相别Phase压力(Mpa)PressureAAABBBCCC机械特性:Mech. Characteristic最低合闸电压Min. close voltage最低分闸电压Min. openn voltage合闸时间Close time分闸时间Open time合闸时间Close time分闸时间Open ti
32、meVVssm/sm/s线圈试验:Coil test绝缘试验:Insulation. Test项目Item合闸接触器Close contact合闸线圈Close coil分闸线圈Open coil相别Phase绝缘电阻(M)Ins. resis.交流试验电压(kV)AC test voltage时间(min)Time直流电阻DC Resis.AB绝缘电阻Ins. resis.MMMC断路器在额定操作电压下分合闸 次,动作良好。Breaker open/close time with rated oper, voltage and operate well绝缘油五次击穿电压的平均值:Averag
33、e voltage for 5 breaking down is kV备注:Remarks结论:Conclusion技术负责人Check试验人Operator表H-435电力电缆试验报告Power cable test report项目:Project装置:Unit工号:Section名称Name试验日期Test Date规格型号Spec./Model额定电压Rated voltagekV长度Lengthm中间头数Number of connection电缆起点Start point电缆终点End point绝缘电阻Insulation resistance相别PhaseABBCCAAEBEC
34、E绝缘电阻(M)直流耐压及泄漏电流DC withstanding voltage and leakage current试验电压(kV)Test voltage时间(min)Time泄漏电流Leak, curr.(A)AB,C,EBC,A,ECA,B,E相位检查Phase inspection备注:Remarks结论:Conclusion技术负责人Check试验人Operator表H-436电压互感器试验报告P T test report项目:Project装置:Unit工号:Section名称Name位号Tag. No.额定电压Rated voltageV/V;V型号Model接线线别Con
35、nection准确等级Precision容量CapacityVA最大容量Max. Cap.VA制造厂Manufacturer出厂编号Manuf. No.A相No.Phase AB相No.Phase BC相No.Phase C试验日期Test date相别Phase绝缘电阻R60" R15"Insulation resistance交流耐压AC withstanding. Voltage.介质损耗Loose tg一次对二次,辅助及地(M)Pri. To sec., Aux. and E.二次对一次,辅助及地(M)Sec. To pri., aux. and E.辅助对一次,二
36、次及地(M)Aux. To pri. , sec. and E.电压(kV)Voltage时间(min)Timetg(%)温度()Temp.ABC绕组直流电阻 温度Wind DC R Temp.绝缘油击穿电压Oil break down voltage接线组别或极性检查Connection inspection相别Phase一次线圈()Primary coil相别Phase五次平均值(kV)Average for 5 timesABC变压比检查Transform rate inspection额定电压下的空载电流测量No-load curr. With rated voltage.相别Phas
37、e标称变比Rated rate一次电压(V)Pri. voltage二次电压(V)Sec. voltage实测变比Real rate变比误差(%)Rate error相别Phase空载电流(mA)No-load curr.AABBCC备注:Remarks结论:Conclusion技术负责人Check试验人Operator表H-437电流互感器试验报告C T test report项目:Project装置:Unit工号:Section名称Name位号Tag. No.试验日期Test date型号Model准确等级Precision电压等级Voltage电流比Curr. rate二次负荷Sec.
38、load制造厂Manufacturer出厂编号与相别Manuf. No. and phaseA相No.Phase AB相No.Phase BC相No.Phase C绝缘试验:Ins. test相别Phase绝缘电阻R60" R15"Insulation resistance交流耐压AC withstanding. Voltage.介质损耗Loose tg一次对二次及地Pri. To sec.二次()级对地Sec. coil to E.二次()级对地Sec. coil to E.电压(kV)Voltage时间(min)Timetg(%)温度()Temp.ABC变流比检查Curr. Rate inspection极性检查Polar inspection相别Phase一次电流(A)Pri. curr.二次电流(A)Sec. curr.实测变比Real rate变比误差(%)Rate error级c
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 设计师职业发展路径指南
- 2025届内蒙古呼伦贝尔市阿荣旗第五区域联合体三年级数学第一学期期末统考试题含解析
- 设计师感简历设计要点
- 行政管理中的公共关系学组织治理模型及试题及答案
- 包装设计年度总结
- 行政管理公共服务试题与答案
- 工程项目管理实施步骤试题及答案
- 二手房买卖咨询服务协议
- 担保书之担保型买卖合同
- 酒店管理与服务实战指南
- GB/T 5357-1998内六角花形扳手
- GB/T 31765-2015高密度纤维板
- GB/T 23129-2008家用咖啡机性能测试方法
- GB/T 19165-2003日光温室和塑料大棚结构与性能要求
- GA/T 268-2019道路交通事故尸体检验
- 品质管理概念培训
- 《思想道德与法治》 课件 第四章 明确价值要求 践行价值准则
- 《拟行路难》课件26张
- 小学生综合素质评价(表)【范本模板】
- DB64∕T 802-2021 有限空间作业安全技术规范
- 维修记录表模板
评论
0/150
提交评论