付费下载
下载本文档
版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、英文涉外借贷合同范本loan contractcontract number: _borrower: _address: _lender: _address: _in accordance with provisions of contract law of the peoples republic of china and bank of china, after reviewing the status and the request of the borrower, the lender agrees to grant the borrower a line of credit on .
2、 the borrower, lender and guarantor, through friendly negotiation, have executed this contract as follows:article 1 currency, amount and term of the loan:1. the currency under this loan is reiminbi.2. the line of the loan is yuan.3. the period of this loan is 12 months from the date of effectiveness
3、 of this contract.article 2 the purpose of the loan:1. the purpose of this loan is used for working capital turnover.2. without written approval of the lender, the borrower could not use the loan out of the scope of the purpose.article 3 interest rate and calculation of interest:1. interest rate: th
4、e interest rate shall be * during the loan term, if the countrys related authority adjusted the interest rate or the manner of calculation of interest, the interest of this contract shall be adjusted accordingly after one yearfrom the date of execution of this contract. the adjustment shall be condu
5、cted when the interest rate are executed one year.it is not obliged to inform the borrower when the adjustment of interest.2. the interest shall be calculated from the date of first drawdown and the actual days the borrower use. one year shall be calculated as 360 days.3. the payment of interests: t
6、he borrower shall pay the interests per quarter. the payment date shall be , and. if the payment for the last installment is not on the payment date,the interests shall deduct the interest from the bank account of the borrower. in the event that the borrower fails to pay the interests on time and th
7、e balance of the account of the borrower is not enough for the payment of interest, the lender shall have rights to collect a penalty being * of the outstanding amount per day for the borrowers breach of contract.article 4 overdue interests and misusing interests1. if the borrower fails to repay the
8、 loan and can not reach a agreement with the lender regarding the extension, the lender shall collect an overdue penalty for * of the overdue amount per day.2. if the borrower fails to uses the loan in accordance with the provisions set forth in this contract, the lender shall have right to charge a
9、 interests for the misusing part at a rate of * per day.article 5 accountthe borrower shall open reiminbi basic account and/or foreign currency account at the lender or lenders branch for the use of draw-down, repayment,payment of interests and fees.article 6 draw-down1. the loan under this contract
10、 is revolving, the balance of this contract shall not more than the line of credit.2. the borrower shall send a draw-down application as the form herein attached in this contract 7 days before the date of draw-down.3. the borrower shall not draw the loan less than 1 million.article 7 conditions for
11、draw-downthe following conditions shall be satisfied in advance of the draw-down date:1. the borrower has opened foreign account and reiminbi account at the office of the lender or the branch of the lender;2. this contract and the appendices have been effective;3. the borrower has provided the recog
12、nition of the investment or certificate of the investment to the lender;4. the borrower has provided the board resolution and power of attorney regarding this loan contract;5. the borrower has provided the list and the signature sample of the authorized person who empower to sign this contract and d
13、ocuments;6. the guaranty under this contract has been effective;7. the borrower has been satisfied the warrants under article 11 of this contract;8. the other requirement for the draw-down have been satisfied.article 8 repayment plan and prepayment1. the borrower shall repay the loan in accordance w
14、ith the status of its cash. the borrower shall inform the lender the payment amount and date * prior to make the payment. the borrower shall be obliged to repay the principal and related interests on due date without any condition.2. the payment made by the borrower and the deduction from the accoun
15、t of the borrower shall be used for repaying the interest at first and then for repaying the principal.3. in the event the borrower fails to repay the loan, the lender shall have rights to deduct the debt from the bank account of the borrower at the lender or empower the branches of the lender to deduct the debt from the bank account of the borrower at the lenders branches;4. the installment of repayment shall not less than 1 million.article 9 debt certificatethe lender shall keep record in the lenders account for the prin
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 酒店员工培训课程
- 酒店公寓消防安全
- 语言赏析方法
- 钢筋间距检查方法
- 纸板创想成型方法
- 2025-2026学年北京市房山区初二政治上册期中考试试卷及答案
- 招聘外包协议书
- 孕妇营养漫画指南
- 2025版肾结石症状及护理要点详解
- 药学常见疾病症状及护理技巧
- DB11∕T 1448-2024 城市轨道交通工程资料管理规程
- 品种授权协议书范本
- 水泵节能设备项目可行性研究报告立项申请报告范文
- 律师职业道德专题课件
- 2025版《农机专业合作社事故隐患内部报告奖励制度》修订版
- 壳牌加油站建设项目方案投标文件(技术方案)
- “新能源汽车”重点专项2024年度项目申报指南
- 2024-2030全球AI驱动的智能文档处理 (IDP)行业调研及趋势分析报告
- 《聚乙烯聚合工艺》课件
- 《质谱分析法》课件
- 人工智能技术在火炮故障诊断与预测性维护中的应用研究
评论
0/150
提交评论