1、QUALITY MANAGEMENT REVIEW管理评审报告Meeting Date : May-15, 2009Time : 2:00PM- 4:30PMVenue : DG office 5B conference roomChairperson : Attendees: MinutesThis management system review covers all XXXXXfunctions, including the Chemical-lab and Microbiological-lab. 1. Review the suitability and effectiveness
2、of quality system A. External-Assessment Results The external assessments have not been conducted through CNAS until the application documents have been gone through and the laboratory audited by the CNAS auditors. CDLL chemical laboratory has been certified as ISO17025 requirement by SGS-CSTC Stand
3、ards Technical Services Co., Ltd. from Dec-08, 08 to April-29, 09, training program of total 11 days divided to 11 sections including US / EU Standard Methods training, Laboratory staff technical training, ISO-17025 system set up and SOP documents written up, the meeting record referring to CDLL/A-1
4、3-02 of 程序文件.B. Internal Audit The internal-audit had been conducted by the CDLL laboratory Manager on April-30, 2009, the report has been summarized the control and set straight of Chemical Lab and Microbiological Lab running system per ISO-17025 criteria. All the correction actions is taking place
5、 and will be closed the end of May, 09. The audit focus on the following: 1. Corrective action on technical deficiency from staff were not trained and set back full skill on test methods compliance with ISO-17025 to fulfill the applied EU / US testing requirement from CNAS-AL-01-02 shown.2. Complete
6、 the 程序文件CDLL/A-(00-29)records for Chemical and Microbiological laboratory and make sure to continue assess from time being when necessary to keep record. The internal audit内审 was cooperated with SGS auditor, Henter Huang, throughout the above 11 sections set time and the corrective actions had been
7、 done in time and accept by auditors. The internal audit内审 report is referring to CDLL/A-11-03 of 程序文件CDLL/A-(00-29).C. Proficiency Test 能力认可and internal Correlation programsProficiency Test (PT): The lab had finished all the 2 rounds PT tests in 2009, including 2 major category EN71 and RoHS requir
8、ement that were organized by CNAS authorized _ organizations. The PT was highlighted and taken corrective action by P-lab. The action report No. is _ with report received on _ and the results were match and pass with their set data from their given samples. External-lab correlation testing (IQC):The
9、 lab had taken part in a lot of correlation tests including RoHS and 6 Phthalates during 2008-09. The results are satisfied (see the following summary): No.Name of RRTInitiatorEndLab listdescription1CDec 06RSTS Jan. 2007SZ, GZ, SH, total heavy metal content of fabric sample2Cadmium-001Guangzhou LabJ
10、an. 2007GZ, SZCadmium content in Rubber material. 3CANONJapan labJan. 2007SZ, GZ, HK, Pb/Ni+P in plating on Ni/SPCC sample4Inter-lab correlation exercise Jan 2007 - SoftlineRSTS HKMar,2007Phthalates & Azo dyes test in standard solution and samples 5SGS-BFR-PAT-011 RSTS TWApr.,2007PBBs&PBDEs
11、in standard solution and samples6SGS-HM-PAT-012 (RoHS) / SGS-ELV-PAT-001 (ELV) RSTS E&E May, ,2007Heavy metal testing7Nintendo Round Robin Test Japan labJun. 2007phthalates content in pellet & powder by Nintendo method8EE/HL/SL 0708RSTSAug,2007phthalates9RRTP-0701Nov.2007Heavy metals (Pb, Cd
12、, Hg, Cr)PBBs & PBDEsRoHS 6 items10Physical & Mechanical, Flammability Test SH-HGNov 2007HG,HKASTM F963-07,Canada Crc.931BS7272-1,2Internal Comparison Test from Technicians Comparison tests were completed and continue monthly according to the record on _ throughout year 2009 May. The referen
13、ce standard _ were used as a correlation subject to be tested by 3 technicians in laboratory.D. Complaints & feedback from customers: In _ 2009, there was one complaint received from the client xxxx. The case was on that the laboratory report, which cannot meet with the clients requirement and t
14、he record is filed on CDLL/A-06-01.Our laboratory executive has taken relevant immediate corrective actions and the client end up accepted correction. To meet with our inner management requirement, corrective action was verified further through customer satisfactory survey which referring to the rec
15、ord on CDLL/A-06-02客户抱怨登记表and CDLL/A-23-01报告更改/补发申请表E. Corrective and preventive actions initiatedThe lab can taken corrective action for SGS raised external & internal audit, clients complaint / claim and unsatisfied results coming from comparison test in time. The individual 程序文件 regarding to
16、preventive actions had been issued, and the preventive action plan need to be made in next lab meeting by 31st, May 2009.F. Inner Quality monitor resultsAll the lab quality monitors have been assigned and trained. The physical-lab and electrical-lab have issued the Inner Quality monitoring schedule
17、and the relevant monitoring have been implemented according to the LQP021 in Jan 2008. But the chemical lab and C/S havent made the Inner Quality monitoring schedule, need to be followed up by early, 2008.2. Review current lab capacities and resources for future development/ New technology or equipm
18、ent The lab shall applied for CMA accreditation for company future business development requirement. The lab technical colleagues title of relative professional engineer (English, computer exam, paper writing) should be followed up.3. Others:H. Training The quality system training shall be specified
19、 and strengthened with individual quality procedure implement to lab staff. The documents written method and the complaint /claim case etc. shall be trained in toys requirement. For the staff turnover rate is high, the new staff should be trained in technical in time. By 2010 year, the laboratory wi
20、ll increase headcount to 10 persons in total. Training program will be arranged the end of 2009 for the new staff and continuing education to old staffs. From time to time seminar hold by the third party that our staff are arranged to join for nourishing their technical knowledge.I. Household and sa
21、fety: The safety training course for all lab staffs was conducted by QA coordinator in Feb 2007. The lab safety audit works were conducted by SGS global QA manager in June and by Shenzhen QA in Sep 2007 respectively. The Shenzhen HR and QA jointly checked the lab safety works in Nov 2007.4. Output /
22、 Improvement.Followed up: ItemsAction description Followed by Completed dateRemarkCorrective action for HOKLASThe customer satisfaction survey implemented according to LQP024 including response of phone etc.At early of March 2008Overall objectives &KPISome KPIs and objectives need to be redefined in 2008.At the end of Mar2008Preventive action Preventive action plan items raised At the end of Mar2008Training Document write e.g. SOP, WI and Claim/complaint case training courses s
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2025年大学第四学年(教育学)教育行动研究试题及答案
- 2025-2026年六年级历史(模块测试)上学期期中测试卷
- 2025年大学医学影像学(学术研究实务)试题及答案
- 2025年高职石油与天然气(油气技术推广)试题及答案
- 2026年中职第二学年(中西面点工艺)西式糕点制作阶段测试题及答案
- 2025年大学第三学年(康复治疗学)康复工程基础阶段测试试题及答案
- 2026上半年外语(卢森堡语HSK四级)实战技巧
- 深度解析(2026)《GBT 18294.2-2010火灾技术鉴定方法 第2部分:薄层色谱法》
- 深度解析(2026)《GBT 18199-2000外照射事故受照人员的医学处理和治疗方案》
- 深度解析(2026)《GBT 17980.72-2004农药 田间药效试验准则(二) 第72部分杀虫剂防治旱地地下害虫》
- 切尔诺贝利核电站事故工程伦理分析
- 初中地理七年级上册第七章第四节俄罗斯
- 法院起诉收款账户确认书范本
- 课堂观察与评价的基本方法课件
- 私募基金内部人员交易管理制度模版
- 针对低层次学生的高考英语复习提分有效策略 高三英语复习备考讲座
- (完整)《走遍德国》配套练习答案
- 考研准考证模板word
- 周练习15- 牛津译林版八年级英语上册
- 电力电缆基础知识课件
- 代理记账申请表
评论
0/150
提交评论