成果finished已完成检ha33-ca2509_第1页
成果finished已完成检ha33-ca2509_第2页
成果finished已完成检ha33-ca2509_第3页
全文预览已结束

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、Airlines Limited航空03110-01Airlines MEDAirlines LimitedWO NO/工作指令号SEQ NO/序列号培训方式通用类/GenericTitleThe lavatory refurbishmentMcd&Rev/厂家工卡&修订日期NONE标题厕所翻新A/C/飞机号Subtask No/工JC Rev/工卡版本号Work area/工作区域Skill/工种Man Hour/工时Rev. 00RIM120:00HA33-CA-25-09-420客舱/CabMP Item/MP 号Baseline/依据MP REV/ MP 版本号Sion/维修站Thre

2、shold/首检erval/重复检-4C4CAcs Panels/接近盖板Zones/区域Written/编写Approved/批准NONE2002016-04-112016-04-11TOOLS/工具TOOLS NESARY/必须工具ITEM项目P/N件号DESCRIPTION名称EQTP类型QTY数量APP适 用性Conditions note互换信息及备注TOOLS IF NESARY/视情工具ITEM项目P/N件号DESCRIPTION名称EQTP类型QTY数量APP适 用性Conditions note互换信息及备注PARTS AND MATERIAL/航材NOTE: OPERATO

3、R MUST GET AND INSTALL THE PARTS注释:请工作者严格按照工作指令号领取预定的航材装机T CORRESPOND TO THE RELATIVE WORK ORDER NO.PARTS AND MATERIAL NESARY/必须航材ITEM项目P/N件号DESCRIPTION名称EQTP类型QTY数量APP适 用性Conditions note互换信息及备注1A425400470-156LAV MIRRORAS1ALL(必须/Nesary)270F1-0216M3N1WallprAS1ALL(必须/Nesary)355980216B005KPafor decorat

4、ive panels & Toilet bowlAS1ALL(必须/Nesary)4A825400468-500Toilet Seat Cover AssyAS1ALL(必须/Nesary)555980249B005KSide wall paAS1ALL(必须/Nesary)605850132Solo Bombay Welding RodCH1ALL(必需/Nesary)705850160Dark Brown 2937 Welding RodCH1ALL(必需/Nesary)8498G0212AVM282 G Wood Regal Mahogany Adh 1.5mX30mCH1ALL(必需/

5、Nesary)9498R6415AVM282 G Solo Bombay Adh 1.5mX30mCH1ALL(必需/Nesary)10DAN493A05AAirVolt LaminateCH1ALL(必需/Nesary)PARTS AND MATERIAL IF NESARY/视情航材ITEM项目P/N件号DESCRIPTION名称EQTP类型QTY数量APP适 用性Conditions note互换信息及备注IMPORTANT NOTE:he event of any discrepancies betn the Chiinstruction and the English instruc

6、tion, the English procedure should prevail.HA33-CA-25-09-420 Rev. 00 2016-04-111 / 3页码,HA33-CA-25-09-420 Rev. 00 2016-04-112 / 3页码,Record Additional Work/Findings(If Applicable) Reference No.of Release to Service(* Tick as appropriate# Different crews should perform the work on each of the systems)C

7、ertifiest the work specified, except as otherwise specified, was carried out in accordance with HKAR-145 and in respect tot work, The aircraft / aircraft components are considered ready for Release to Service.HKA Approval No: AI / 135 / 706 * HNAT Approval No.: JMM 076, D3039 * HNAT Approval No.: JM

8、M 047, D101115*HNAT Approval No.: JMM 049, D500023 * CASL Approval No: AI / 101 / 798 * TAECO Approval No.: DAI / 89 / 1295 *HAECO Approval No: DAI / 1 / 853 * SIAEC Approval No: AWI / 01 * STARCO Approval No.: JMM 039, D.200078 *SMECO Approval No: JMM 081, D.400009 * AMECO Approval No.: JMM001,D101

9、131*Other: *Signature:Authorization No.:Date:HA33-CA-25-09-420 Rev. 00 2016-04-113 / 3页码,工卡 Job card:TITLEThe lavatory refurbishmentPerfInsp标题厕所翻新工作者检查者WARNING: PLEASE OBEY ALL WARNING AND CAUTION OF REFERENCE MANUAL, OTHERWISE IT SHOULD CAUSEAL INJURE OR DAMAGE TO EQUIPMENT.Job Set-upA. Aircraft Ma

10、enance ConfigurationRemove the partshe lavatories.ProcedureMake sure the lavatories parts without damage or crack.Check and repaall theerior walls of the lavatory (Curved side wall panels) if needed.Repathe Lavatory toilet bowl exterior surface.Remove the baby tables (if any) inside the lavatories for repa.Check and replace all the damaged lavatories door wallpr if needed.Check the wash basin panel for damages. Replace if found damaged.Remove and clean the lamp shades.Replace the NTFhe lavatory.Check the lavatories rubbish bin spring hinge, replace if required.3. Close-upA. Put the A

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论