版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Review Questions for PPMaster Data Organizational StructuresWhat are the various organizational structures in the R/3 System?Which R/3 organizational structures are used primarily for PP?What is the relation between controlling area, company code, valuation area, plant and storage locationMaterial M
2、asterWhat is the purpose of different material master views?Which views are available?Which views are used primarily for PP?What is the relationship between material master views and individual organizational structures?How does the industry sector influence the material master maintenance?How does
3、the material type influence the material master maintenance?What is the difference between external and internal number assignment and how is it set up in Customizing?Which other factors can influence the selection of fields in the material master?How can MRP profile and forecast profile be used to
4、optimize material master maintenance?How can a material master be reorganized (deleted/archived)?Which units of measure can affect processing in the material master (base unit of measure, production unit, order unit, etc.)?What is the material status used for and on which levels could it be maintain
5、ed?Review the usage of the following settings?MRP groupMRP typeReorder pointPlanning time fenceMRP controllerLot sizeProcurement typeSpecial procurement typeProduction storage locationBackflush flagStock determination groupBulk materialScheduling margin keySafety stockStrategy groupConsumption mode
6、and consumption periodAvailability checking groupAlternative selection flagDependent requirement flag for individual and collective requirementsProduction schedulerProduction scheduling profileUnderdelivery/overdelivery toleranceIn-house production time (lot size dependent/independent)Valuation clas
7、sPrice control indicatorMoving average price/standard priceBills of MaterialWhat is determined by BOM usage?What technical types of BOM are available? Can the technical type of a BOM be changed?During which processes will BOM usage and status be considered? When would it be useful to make use of a G
8、roup BOM?What is meant by area of validity and effectivity of a BOM?Which item categories are available and what are their specifications?What is a sub-item?Under which circumstances could a BOM be recursive and what the usage of the recursive indicator?What is the usage of the following BOM setting
9、s?Explosion type Relevant to production Relevant to costing Material provision indicatorBulk materialProduction storage locationWork CentersWhat is a work center category?What data can be maintained on the various views (basic, default, capacity, scheduling, costing, etc.)?What is the purpose of a s
10、tandard value key?What role does the operation control key play?What does referencing mean?Why to use a work center hierarchy?What is a pooled capacity?Analyze the usage of the following fields?Backflush indicatorCapacity categoryFormulas for determining capacity requirementsRate of capacity utiliza
11、tionRelevant to finite scheduling indicatorOverloadFormulas for schedulingLocation group (move time matrix)Queue times (normal and minimum)Cost centerActivity typesFormulas for costingRoutingsWhat does a routing define?How is a routing structured?What task list types are available in the R/3 System?
12、What is a routing group and group counter?What is a routing sequence, and what types of sequence are available?What could be reasons to use sequences?What are the various options to assign materials to routings?Under which conditions would it make sense to assign components to operations?What is a r
13、eference operation set?How could the lotsize-dependend inhouse production time be calculated and updated into the material master?Production Resources/ToolsWhat types of PRT are available?What is the relationship between PRTs and a routing/operation?Engineering Change ManagementWhat are the objectiv
14、es of Engineering Change Management?What is the significance of changes with a history?Which PP objects can be managed using Engineering Change Management?What is the purpose of an engineering change request/order?How is a change master record structured?What is a revision level compared to engineer
15、ing change master?Other IssuesWhich scheduling options are available, and how do they differ from each other?Which time components are taken into account during scheduling?How are basic order dates determined?How are the scheduled dates determined?Which scheduling types are available in lead time sc
16、heduling?What role do reduction measures play in scheduling?What types of scrap can be maintained in PP basic data and how would they be considered during MRP repectively scheduling?What is external processing, and what conditions must be fulfilled before external processing can take place?What are
17、co-products?Production Planning General IssuesWhat are the various planning levels available in R/3 PP?What are the dependencies between Sales and Operations Planning, Demand Management, Long-Term-Planning and Material Requirements Planning?Sales and Operations Planning What is the purpose of Sales
18、and Operations Planning?What is the structure of product groups and how could they be used in SOP/DM/LTP/MRP?What is the purpose of proportion factors and aggregation factors within product groups?Which planning methods are available in SOP?Which sources are available as input data for SOP?Which opt
19、ions are available for creating a sales plan in SOP?Which options are available for creating an operations plan in SOP?What is disaggregation?How could the result of SOP be passed on to different planning tools within the PP planning environment?Demand ManagementWhat is the purpose of Demand Managem
20、ent?At which points is Demand Management integrated with Sales and Distribution?Explain the main strategies in Make-to-Stock as well as in Make-to-Order planning logic. Pay attention to master data settings.What does consumption respectively reduction mean in the context of planning strategies?What
21、role does the individual/collective requirements indicator in the material master have during make-to-order production?What is a stocking level, and how can it be influenced?Which types of availability check are available (ATP and check against planning) and what are the characteristics of these che
22、cks?Explain the link between MRP group, strategy group, strategy and requirement class.What settings could be made in requirements classes (on PP as well as on SD side)?Explain the purpose of version management in Demand Management?Master Production Scheduling Under which circumstances would you rec
23、ommend the usage of MPS?Compare the functionality of MPS with MRP?What is meant by the firming of procurement proposals, and how can this effect be achieved?What is a planning time fence, and where is it defined?What is a manual firming date, and where is it defined?How can a planned order be firmed
24、, and which firming indicators are available in a planned order?Material Requirements Planning What is the purpose of MRP and how does it fit into the PP planning environment?How would you organize MRP runs? Discuss the different optionsMRP for a plant onlineMRP for a plant in backgroundMRP for a ma
25、terial (individual planning) - onlineWhich planning types are available (NEUPL, NETCH, NETPL)?Which planning parameters are to be set in the application itself?What is the function of the planning file?What is meant by single-level planning, multi-level planning?What is meant by interactive MRP?What
26、 are the characteristics of an MRP scenario that is performed in simulation mode?What is meant by low-level code and how is it considered in MRP?What is a net requirements calculation?Which buffers can be taken into account for the net requirements calculation in MRP (quantity buffer: safety stock,
27、time buffer: safety time)?What does lot-size calculation entail?Which lot-sizing procedures are available in the R/3 System (static, periodic and optimizing procedures)? What are the characteristics of these lot-sizing procedures?How does the procurement type defined in the material master affect MR
28、P?What is backward scheduling? What are the characteristics of backward scheduling?What is the difference between basic scheduling and lead time scheduling?How are the order due dates determined in basic scheduling?How are the order due dates determined in lead time scheduling?How does the in-house
29、production time defined in the material master affect scheduling?How does the scheduling margin key affect scheduling?How are BOMs selected in MRP? Which criteria are taken into account during BOM selection?What is a BOM selection ID?How are alternative BOMs selected?What is a production version?How
30、 are routings selected in MRP? Which criteria are taken into account during routing selection?What is an MRP list? What is a stock/requirements list? How are these lists structured? What are the differences between these lists?What is the function of exception messages?What are planned orders?What i
31、s meant by the individual/collective conversion of planned orders?What is meant by “days supply” and “receipt days supply”?How can component discontinuation be managed in MRP?Production Order Processing General IssuesWhat are the characteristics of work-to-order production?What is defined in a produ
32、ction order?What is a document type, an order category and an order type?What are the various elements that a production order contains?Which functions are executed when an order is created?What are the various options available for creating an order?Describe the system logic during routing selectio
33、n?Describe the system logic during BOM selection?At which point in time are reservations generated and what information does it contain?What can be achieved by performing the “Read master data” function?How could routing sequences be considered during production order creation?Describe the conversio
34、n of planned orders into production orders with focus on scheduling aspects?Order ReleaseWhat happens when an order is released?Which operations are made possible and which are prevented when an order is released?What is meant by status management?What are business transactions?What are the differen
35、ces between system status and user status?At which points in time can availability checks be performed? Which settings can be made, and which must be made? On which objects can the availability check be run?What is meant by machine commitment?What is meant by midpoint scheduling?PrintingWhich shop f
36、loor papers can be printed?Which print modes are available (online, update, background)?What does “reprinting” mean?Which conditions must be fulfilled before order documents can be printed?Which conditions must an operation fulfill before shop floor papers (and in particular confirmation slips and t
37、ime tickets) can be printed?Goods IssueWhich control indicators influence the behavior of the components in the production order (bulk material, backflush, phantom assembly, etc.)?What is meant by picking?What is meant by stock determination? Which settings have to be made for stock determination du
38、ring production order processing?What is a goods issue posting?How can goods issues be entered (reference to order, reference to reservation, unplanned, etc.)?What is the purpose of movement types?What are the effects of a goods issue posting from an integrational point of view (MM, FI, CO)?What is
39、meant by the backflushing of components and how can this be achieved?ConfirmationWhich conditions must be fulfilled before confirmations can be entered?What is a confirmation?Which functions are linked to confirmations?Which confirmation procedures are available?What data can be entered during confi
40、rmations?What is a milestone confirmation?What is an unplanned milestone?What identifies a progress confirmation?What role does the control key defined in the operation play during confirmation?Is it possible to link a confirmation with a goods movement posting?What is a goods receipt?What are the e
41、ffects of a goods receipt posting?What is the relevancy of the “delivery completed” indicator?What is the function of overdelivery/underdelivery tolerance in the material master play?Order Settlement / Archiving and DeletingWhat is meant by order settlement?What causes a production order to be debit
42、ed/credited?What is the difference between prelimenary costing and actual costing?Which are the usual steps during order settlement?What means variance calculation?How is an order settled if the header material is a standard price material?At which points in time can an order be settled?Which condit
43、ions must be fulfilled before an order can be archived?How are orders archived/deleted?What is meant by “residence times”?Order Information SystemsWhich information systems can be used for order management?What are the characteristics of the order information system?What are variable object overview
44、s?What are the special characteristics of a (multi-level) order report?What is the difference between the order information system and the Shop Floor Information System?Which functions are available from the order progress report?Automation OptionsWhat options are available for automating the proces
45、sing of orders?What role does the production scheduling profile play?Describe the most lean production order and the necessary settings to achieve it?Which functions could be executed in the mass processing?Collective OrdersWhat are the characteristics of collective orders?How can collective orders
46、be created? Which conditions must be fulfilled?What are the advantages of working with collective orders?Which functions can be performed on collective orders?How is scheduling for a complete collective order done?What happens if a date/quantity for an order is changed within the collective order?Pr
47、oduct Cost PlanningGeneral IssuesWhat is a cost element (primary/secondary)?What is a cost component?What is a cost component split?Explain the Costing Variant and the main settings in customizing.What is a costing type?What settings can be done in a valuation variant?How is a costing sheet structur
48、ed?Base unit costingDescribe base unit costingWhich master data are required for base unit costing?How can results of BUC be used in further calculations?Cost estimation without quatity structureWhat is meant by quantity structure?Describe costing w/o quantity structureWhich master data are required
49、 for that costing logic?Cost estimation with quantity structureDescribe cost estimation with quatity structureHow can the quantity structure be determined?What is activity based costing?How could results from standard cost estimation be updated into the material master?What happens if stock is on ha
50、nd during that price update?Repetitive Manufacturing General IssuesWhat are the differences between discrete manufacturing and repetitive manufacturing?What are the characteristics of make-to-stock repetitive manufacturing and make-to-order repetitive manufacturing?Master Data for Make-To-Stock Repe
51、titive ManufacturingWhat master data are necessary in repetitive manufacturing (material master, bill of material, production line, routing)?Describe the the following material master data:Repetitive manufacturing indicator?Repetitive manufacturing profile?Production versions?Which object is used to
52、 collect the material costs and production activities?What are the various options available for establishing a link between the cost collector and the production version of a material? What role doe the repetitive manufacturing profile play here?Planning Make-To-Stock Repetitive ManufacturingWhat i
53、s the planning table in repetitive manufacturing? What functions can be executed from here?Material ProvisionDescribe the usage of pull list and stock determination as one of its function.Which other ways are available to make sure that sufficient components are provided to the shop floor?BackflushWhat does backflush mean in a repetitive manufacturing context?Explain the functions of final backflush.How can p
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 挫折教育小课堂抗挫能力大提升
- 简笔画入门教程简笔绘画大公开
- 人教版高二生物选必三生物技术预习 新学期预科精讲课件
- 学校消防安全工作方案
- 学校仓库管理制度
- 学籍管理制度
- 物业扬尘治理监理实施细则
- 新学期前置学习|时序搭建与古代史脉络梳理资料
- 临床助理医师标准化模考题库卷含完整答案
- 导游文旅常识仿真模拟摸底冲刺卷含完整答案
- STEM教学设计心得体会(三篇)
- BS EN ISO 15848-1-2015 工业阀-逸散性排放的测量、试验和鉴定程序(中文)
- 首饰失蜡铸造工艺流程
- 新人教版七年级上册英语预备篇测试题附答案
- SB/T 11091-2014冷库节能运行技术规范
- GB/T 5185-2005焊接及相关工艺方法代号
- GB/T 34910.2-2017海洋可再生能源资源调查与评估指南第2部分:潮汐能
- 信用风险缓释工具课件
- 颅脑手术的麻醉课件
- 写字楼验收移交工作方案
- eicad教程用户手册3droad
评论
0/150
提交评论