1、Part 2Work Scope and Responsibility ofthe Contractor承包商的工作内容和责任DURAVIT New ProjectTender-Steel Cladding WorkWork Scope and Responsibility of the Contractor承包商的工作内容和责任Work Scope and Responsibility of the Contractor1. 承包商的工作内容Work Scope of Contractor本项目包括以下几项工作内容:This project includes the following wo

2、rks:生产厂房(包括生产厂房和办公楼/综合楼之间的连廊)的全部彩钢板围护工作装彩钢板所需的檩条和拉杆等All steel cladding work and nesary purlins & tie rods of Workshop (incl. thecorridors betn Workshop and Office Building/Sol Building)生产厂房(包括生产厂房和办公楼/综合楼之间的连廊)的全部门窗工作,包括天窗All windows and doors work of Workshop (incl. the corridors betn Workshopand O

3、ffice Building/Sol Building), including skylights品仓库的全部彩钢板围护工作All steel cladding work and ne Storage装彩钢板所需的檩条和拉杆等sary purlins & tie rods of Dangerous Material品仓库的全部门窗工作All windows and doors work of Dangerous Material Storage房的全部门窗工作All windows and doors work of Garbage污水处理站的全部门窗工作All windows and doo

4、rs work of Waste Water Treatment Plant自行车棚的全部彩钢板围护工作装彩钢板所需的檩条和拉杆等All steel cladding work and nesary purlins & tie rods of Bicycle Shed为完成以上提及的工作,承包商的工作范围具体应包括但不限于以下内容:For the above works, the Contractor workscope should include but not limited to the following works:1.1工程设计Design workBS Engineering

5、Consulting Shanghai Co.,.Work Scope and Responsibility - 1DURAVIT New ProjectTender-Steel Cladding WorkWork Scope and Responsibility of the Contractor承包商应提供本项目的全部的必要的制作图及详图、项目实施完成后的竣工图。The Contractor should provide all nesary shop drawings/details during projectconstruction, as-buirawings when proje

6、ct final acceptance.1.1.1必要的制作图详图Nesary shop drawings承包商应在项目施工期间提供设计配合,并在施工图的基础上对重要的工作提供制作详图供业主。这些详图应至少包括但不限于:Teral contractor shall supply design support during construction period, andmake detailed shop drawing for the important civil work based on the detailed drawingto cnt for approval. These de

7、tailed shop drawings shouldlimited to following items:east include but not彩钢板外墙及内墙的构造详图,包括各类收边板;Shop drawing for steel exterior wall anderior wall, includingdifferent edge clos;彩钢板屋面的构造详图;Shop drawing of roof steel cladding;各类窗的构造详图和安装详图;Shop drawing and installation drawing of different windows;各类门

8、的构造详图和安装详图;Shop drawing and installation drawing of different doors;等等etc.1.1.2As-buirawing项目最终完工时的竣工图According to the actual situation of final acceptance of this project and requirementsof relevant authorities, The Contractor shall make as-buirawing and supply all thesoft-copy of as-buirawings of

9、this project. Details refer to definition regarding as-buioucmentshis Tender.承包商应根据工程最终竣工验收的实际情况,按照相关部门的要求绘制最终竣工图并提供所有工程内容的竣工图电子文件。具体要求详见本招标文件对竣工资料的定义。承包商应确保其完成的竣工图获得设计院和业主以及当地部门的认可。BS Engineering Consulting Shanghai Co.,.Work Scope and Responsibility - 2DURAVIT New ProjectTender-Steel Cladding Work

10、Work Scope and Responsibility of the ContractorThe Contractor should make suret the approval from LDI and the Cnt, as well aslocalernments, can be received about the as-buirawings.1.2部门的及申请ernment approvals and application ies承包商应完成实施其工作内容所需的全部收工作,它们主要是:与申请事宜,以及其工作完成后的验The Contractor shall be respon

11、sible for all application and approval needed by localauthorities for the works to be done him, as well asworks are done, mainly:ernmental acceptance after the其工作实施所需的施工Construction permit nesary for his work外地施工队伍进项目所在地施工所需的所有申请与手续。All applications and approvals for permit of working in project loc

12、ationfor the non-local contractors.施工期间各种隐蔽工程的验收The acceptance of each kind of unex construction perioded work during the施工期间各分部工作的阶段性验收The acceptance of part work during the construction period其工作相关的最终验收Final acceptance nesary for his work任何其它必要的Any other ne和验收事宜saryernmental approval and acceptanc

13、e requiredby localernments在完成以上与申请事宜时,业主将提供协助,比如提供必须由业主准备的文件资料和签字盖章等。申请与所发生的所有规费,凡应由业主承担的,将由业主支付,凡应由承包商承担的,则由承包商支付。办理上述事宜所需的成本开销,如交通费,通讯费等,均由承包商承担。The cnt will help the Contractor for the application and approval ies, such assupply of the nesarys, signs and seals what must be prepared by thecnt. If

14、the fees of application and approval shall be paid by cnt, it will be done bycnt. The Contractor shall pay his duty. The costs and spends caused due to theBS Engineering Consulting Shanghai Co.,.Work Scope and Responsibility - 3DURAVIT New ProjectTender-Steel Cladding WorkWork Scope and Responsibili

15、ty of the Contractorworkch as transport cost, the communication spends and so on shall be borne bythe Contractor.1.3提供用于现场施工和安装的临时设施The temporary facility used for site work为了确保现场的施工活动,承包商将提供必要的临时设施,临时设施必须满足施工要求以全要求,其费用由承包商承担。In order to guarantee the regular construction, the Contractor shall suppl

16、y following temporary facilities. The temporary facilities have to satisfy the requirements for siteconstruction and safety. The relevant cost should be borne by the contractor.1.4现场文明施工Site safety and cleaning承包商应确保施工现场在任何时候都没有废料,瓦砾或其它的堆积, 并始终保持工作场所和材料区域相当整洁,有条理,不存在任何和隐患。The Contractor shall ensure

17、 in all timet the construction site is kept free ofaccumulations of waste materials, rubble and other rubbish, and maahe workingand storage areas in a reasonable proper and non-hazardous condition without anydanger and hidden trouble.1.5现场的安全工作Site security承包商应对其自己的材料、设备、的安全负责。The Contractor is resp

18、onsible to the security for his own materials, equipment ands on the sites.在建筑施工期间,应除某项或部分设施。好工地设施。要按业主的要求或仅在业主允许的情况下方可拆During the construction period, the site facility shall be maained. They will bedemolished (also in part) wigreement or requirement of the Cnt.承包商应承担安全实施的主要责任人职责,比如与他的所有分包商和由业主直接委托

19、的承包商按当地规定签订安全分包协议,在当地安监与质监部门办理各种有关登记手续,提供与安全责任人相关的各种服务与措施等等。这些工作所需的费用应包含在承包商的报价中。The Contractor should bear the primary responsibility for the implemenion of humansecurity duties, such as signing security subcontractors agreement according to localBS Engineering Consulting Shanghai Co.,.Work Scope a

20、nd Responsibility - 4DURAVIT New ProjectTender-Steel Cladding WorkWork Scope and Responsibility of the Contractorregulations will hibcontractors and contractors commised by the cntdirectly, handling various aspects of registration procedures in local safety superviand quality supervi measures of sec

21、urityshould be includeddepartments, providing relevant different serviands responsible of Contractor etc. The cost for these workshe quoion of Contractor.1.6施工与安装Construction and installation承包商应完成以上提及的全部施工工作,具体如下:The Contractor should finish all abovementioned construction works. Details refer to t

22、he follows:1.6.1彩钢板屋面工程Roofing steel cladding works承包商应完成所有彩钢板屋面的全部工作,包括屋面内外层彩钢板、屋面檩条和拉杆、保温层等,以及所有彩钢防水收边板、檐沟等屋面相关工作。The Contractor shall be responsible for construction of roof steel cladding works,includingernal & external roof steel cladding, roof purlins and tie rods, insulationlayer and so on, a

23、s well as other roof related work such as steel flashing and gutter.雨篷彩钢板和檩条等相关工作同样属于本次招投标的范围。Such works as steel cladding and purlins on canopy are also included scope.he bidding生产厂房的屋面钢结构布置图(图号:S5025SC-01-210 和 S5025SC-01-211)中包括的所有屋面杆件都将由主体钢结构的承包商施工完成,不属于本次招投标的范围,屋面檩条布置图(图号:S5025SC-01-212 和 S5025

24、SC-01-213)中包括的所有檩条以及檩条之间的拉杆隅撑等都属于本次招投标的范围。此工作界面的定义原则同样适用于品仓库和自行车棚。In Workshop, all roof steel members included in Roof Structural Layout (Drawings No. S5025SC-01-210 and S5025SC-01-211) will be done by the contractor for main steelstructure, not includedhe bidding scope; all purlins and tie rods inc

25、luded in RoofPurlin Layout (Drawings No. S5025SC-01-212 and S5025SC-01-213) should be onepart of the bidding scope. This workingMaterial Storage and Bicycle Shed.erface principal is also valid for Dangerous为配合其它承包商的屋面板的开孔和封堵工作同样属于承包商的工作范围,如穿屋面的机电管线和天沟处的雨水斗等。BS Engineering Consulting Shanghai Co.,.Wo

26、rk Scope and Responsibility - 5DURAVIT New ProjectTender-Steel Cladding WorkWork Scope and Responsibility of the ContractorThe opening and closing on roof is also one part of the Contractors workscope, whichare required by other contractors, for exrainwater head and etc.le, for the cabling going thr

27、ough roof,1.6.2彩钢板工程Wall steel cladding work承包商应提供所有彩钢板的全部工作,包括内外层彩钢板、檩条、保温层等,以及所有彩钢防水收边板等相关工作。The Contractor shall be responsible for construction of wall steel cladding works,includingernal & external wall steel cladding, wall purlins, insulation layer and so on,as well as other wall related work

28、such as steel flashing.所有小单体(废水处理站、废料场和品仓库)的女儿墙压顶的制作和安装也属于承包商的工作范围。节点详见第六部分“招标图纸”中的“Part Cover”。The cover of the part in all small individual buildings (Waste Water Treatment Plant,Waste Storage, and Dangerous Material Storage) is also one part of the Contractorsworkscope, including manufacture and

29、installation. About the details, refer to “PartCover” in Part 6 “Tender”.为配合其它承包商的板的开孔和封堵工作同样属于承包商的工作范围,如穿的机电管线、外立面的检修钢梯等。The opening and closing on wall is also one part of the Contractors workscope, whichare required by other contractors, for exinspection ladder on facade and etc.le, for the cabli

30、ng going through wall,1.6.3门窗安装工程Windows & doors installation work承包商应提供除办公楼和门卫室以外的所有的门窗工作,包括门窗洞口的收边板、五金件和所有相关工作。The contractor should provide all windows & doors work except in Office Building and Guardhouse, including flashing around windows & doors opening, hardware and allrelating works.门窗安装工作所必

31、需的钢骨架属于本次招投标的范围,如生产厂房标准节点详图(图号: S5025SC-01-229)中的 C 型门梁门柱。对于其它招标图纸没有明确,但是门窗安装所必需的工作,投标者同样应将相关成本计入投标总价,施工中不得以图纸深化为由要求额外费用。Steel frame nesary for installation of windows & doors is includedhe biddingBS Engineering Consulting Shanghai Co.,.Work Scope and Responsibility - 6DURAVIT New ProjectTender-Stee

32、l Cladding WorkWork Scope and Responsibility of the Contractorscope, such as the C-type door beam and door column in “Standard Detail Jo” ofWorkshop (Drawing No. S5025SC-01-229). For other work nesary for installationof windows & doors, but not clearhe tender drawings, the bidders should includethe

33、relevant costhe bid price and not ask for additional claim during site constructionthrough shop drawings.1.6.4所有其他以上未提及的但在图纸上或在其他文件里有说明的施工内容All other works not mentioned above, but definedtender drawingshis tendersuch as承包商完成上述所有工程所需要的材料及达到的技术质量标准应符合本标书技术标部分各种要求,并符合中国和当地相关的规范。The required material a

34、nd achieved technical quality standards Contractor completesall of the above works are requested to meet the various requirements of tendartlyand the regulation of relevant Chiand local Code.以下工程将由业主直接委托其它承包商完成,不属于本次招投标范围:For the following works, Cnt will sign direct contract with otherrs. Thesework

35、s are not includedhe bidding scope of this time:(1)桩基工程Piling work(2)钢筋砼工程R. C. work(3)砌筑工程Masonry work(4)钢结构主体工程Main steel structural work(5)办公楼/综合楼和门卫室的外立面工程(包括外立面饰面以及外立面骨架/檩条)Faade work of Office Building/Sofaade finishing and frames/purlin)lBuilding and Guardhouse (incl.(6)办公楼/综合楼和门卫室的门窗工程Window

36、s & doors of Office Building/Sol Building and GuardhouseBS Engineering Consulting Shanghai Co.,.Work Scope and Responsibility - 7DURAVIT New ProjectTender-Steel Cladding WorkWork Scope and Responsibility of the Contractor(7)办公楼/综合楼和门卫室的室内装饰工程erior decoration work of Sol Building/Office Building and

37、Guardhouse(8)全部机电工程All MEP work(9)景观和室外景观照明工程Landscand outdoor landsclighting work(10)桁车等生产设备Production equipment such as cranes(11)The 2nd grouting for production equipment foundation生产设备基础的二次灌浆(12)Furniture家具(13)Kitchen equipment厨房设备(14)Road signs道路指示牌(15)位于地块处的 LOGO 以及建筑物外立面的 LOGOLOGO at the plot

38、 entrance and on building facade承包商除了要完成上文所涉及的工作内容外,还有义务完成业主另外委托的工作。The Contractor shall not only complete all works mentioned, but also has theobligation to execute additional work ordered by the Cconstruction.nt during the业主The C利取消承包商的任何合同工作而无需承包商同意,并相应调整合同价格。ns the right to cancel any contract w

39、ork of the Contractor withoutagreement of the Contractor, and then adjust the Contract Price accordingly.1.7测试,与验收等Tests, reports, acceptan, etc.承包商项目实施期间应完成并提供如下内容:BS Engineering Consulting Shanghai Co.,.Work Scope and Responsibility - 8DURAVIT New ProjectTender-Steel Cladding WorkWork Scope and Re

40、sponsibility of the ContractorThe Contractor shall provide following works during the project execution period:1.7.1合同签订后一周,提供完整的项目组织设计,其中应主要包括:Withineek after the Contract is signed, the complete project concept shallbe provided, mainly including:(1)主要工程的设计施工方法,技术要求和质量控制措施The design & construction

41、methods for the main works, the technicalspecifications and the quality control measures(2)总进度计划Overall time schedule(3)与总进度计划相应的材料供应计划Schedule of material supply in accordance with the overall time schedule(4)与总进度计划相应的及设备投入计划Plan of manscheduleer and equipment in accordance with the overall time(5)

42、施工总平面布置图General siayout(6)安全措施全管理制度Security measures and safety control regulations.(7)项目管理及组织结构A list of project management team andanization chart1.7.2在施工期间对材料和产品的各类测试,测试内容原则上按有关中国规范执行,但业主的第要求承包商提供其他的测试。这类测试必须在规定的时间内由有资格完成。其费用由承包商承担,不另计。Various tests of materials and equipment during the construct

43、ion period shall bedone according to Chitechnical codes. The Cns right to request theContractor to supply other tests. The tests must be completed by qualified third party in a stipulated time. Its expense shall be borne by the Contractor, withoutreward in addition.1.7.3承包商在设计施工期间应提供各种材料的样品和各种设备的详细技

44、术说明。只有当样品和设备说明被业主认可后,承包商才被允许采购这些物品,否则业主将拒BS Engineering Consulting Shanghai Co.,.Work Scope and Responsibility - 9DURAVIT New ProjectTender-Steel Cladding WorkWork Scope and Responsibility of the Contractor绝这些物品进场。被认可的材料样品和设备技术文件将由业主代表签字,并封存于专门陈列室内,供施工时检查。During the design & construction periods, th

45、e Contractor shall provide sles foreach kind of material and equipment with detailed technical specifications. Onlyafter the sles are accepted by the Cnt, the Contractor is then allowed topurchase. Otherwise the Cnt will refuse suaterials and equipment to bedeliveredo the construction site. The sles

46、 and technicals ofapproved materials & equipment will be signed by the represenin sle room for checking during the construction.ive of Cnt, kept1.7.4承包商在设计与施工期间应向业主提交周和月。的主要内容为:During the design and construction periods, the Contractor shall submit thereport and the monthly report to the Cnt. The re

47、quirements of the report:kly(1)进度情况应通过计划进度和实际进度对照表来说明。The progress situation shall be explained through the comparisonbetn the planed schedule and the actual progress.(2)质量情况,必须对所附测试、检测加以说明。The quality situation shall be reported. The test and examination reportsmust by attached and explained.(3)安全施

48、工情况The construction safety situation shall be reported.(4)需要业主解决The problems need to be solved by the Cnt.1.7.5承包商应组织各类验收工作,主要为:The Contractor shallanize each kind of acceptance work, mainly:(1)施工期间各种隐蔽工程的验收The acceptance of each kind of unex perioded work during the construction(2)施工期间各分部工作的阶段性验收Th

49、e acceptance of part work during the construction period(3)施工结束后质监站总验收The acceptance by the Quality Control Authority after construction isBS Engineering Consulting Shanghai Co.,.Work Scope and Responsibility - 10DURAVIT New ProjectTender-Steel Cladding WorkWork Scope and Responsibility of the Contr

50、actorfinished.上述验收工作若发生费用,应由承包商承担,承包商应作各种准备工作并参与业主工程的最终验收。If there are any expenseshe acceptanmentioned above, they shall beborne by the Contractor. The Contractor shall supply each kind of preparationand participatehe final acceptance made by the Cnt1.8竣工图,竣工资料和培训As-buirawings, as-buiocuments and t

51、raining以下竣工资料应同时以电子文件和文件两种形式、一式两份提交业主。All following as-buiocuments should be provided to the Cnt in both softcopy andformat, of two original copies.1.8.1提交部门的竣工资料As-buiocumentbmitted to theernment departments在工程结束后,承包商应整理汇总其自己的应提交部门的竣工资料,提交总承包商(土建承包商),然后由总承包商(土建承包商)形成整个项目的完整的竣工资料后提交部门。承包商应对其自己的竣工资料的

52、准确性和完整性负责。The Contractor should collect and sort out his as-buiocuments and submitted toGeneral Contractor (civil contractor), who willegrate all as-buiocuments toernment departments. The Contractor shall be responsible for the accuracy andcompleteness of his as-buiocuments承包商应服从业主和总承包商的管理,本项目将视情况可能

53、承包商和业主和总承包商签署施工承包合同,但业主直接支付合同款给承包商。为便于总承包商对所有承包商的管理,业主将要求承包商支付一定金额的保证金给总承包商,具体金额将在施工中确定。The Contractor should follow the instruction from the Cnt and General Contractor. Athree-party construction contract may be signed among the Cnt, General Contractorand Contractor, but the Cnt will directly pay th

54、e Contractor. In ordert teralContractor can better manage all the contractors, the Cnt will ask the contractors topay some amount to teral Contractor as deit. The detailed amount will bedecided later on during site construction.总承包商应该收取的总包配合费和总包已由业主支付,承包商不必考虑此项费用。The coordination and management cost

55、 maybe required by teral Contractorhas already been paid by the Cnt, so the Contractor does not need to consider aboutBS Engineering Consulting Shanghai Co.,.Work Scope and Responsibility - 11DURAVIT New ProjectTender-Steel Cladding WorkWork Scope and Responsibility of the Contractorthis anymore.应提交

56、部门的竣工资料除了按照相关的规范和法律规章提交部门以外,承包商应同时提交一份同样的竣工资料给业主。In addition to as-buiocumentbmitted toernment departments, the Contractorshould also submit the same as-buiocuments to the Cnt.1.8.2提交业主的竣工资料As-buiocumentbmitted to Cnt除了提交部门的竣工资料以外,承包商还应按照以下要求额外整理汇总至少两份竣工资料(中英文对照)提交业主:In addition to as-buiocumentbmit

57、ted to theernment departments, theContractor should also collect and sort ouleast two additional bilingual (English andChi) as-buiocuments by the following requirements:(1)竣工图:CAD 电子文件(AutoCAD 2004 格式)以及蓝图(A2 大小),竣工图必须符合最终实际施工情况,并且融合项目实施过程中出现的所有设计修改,竣工图中不得单独出现设计修改通知单等工程变更单,原则上所有的工程变更应在竣工图中直接修改后得到直接体

58、现Complete as-buirawings: CAD softcopy (in format of AutoCAD 2004)and(A2 size). As-buirawings must conform to the final actualconstruction andegration of all design changes of the projectimplemenion, and not appear alone design change notiand otherengineering change order. In principle, all the engin

59、eering changes shouldbe reflected after As-buirawings are directly modified.(2)各类检测测试Testing reports(3)各分部分项工程单项工程移交Hand-over record of all individual works and buildings(4)各分部分项工程、Acceptance单项工程质量验收文件of all individual works and buildings(5)所有分包商和材料供应商的联系Contact list of allrs and subcontractors(6)工程

60、变更汇总和结算书BS Engineering Consulting Shanghai Co.,.Work Scope and Responsibility - 12DURAVIT New ProjectTender-Steel Cladding WorkWork Scope and Responsibility of the ContractorChange orders and final settlement(7)工程Project photos(8)施工时各类和Each kind of records and reports during the construction(9)施工时各类

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论