版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Standard Cost CalculationSAP Best PracticesPurpose, Benefits, and Key Process StepsPurpose Reflect the changes in the prices of purchased parts, change in labor and overhead costs and change in bills of materials and operations needed to manufacture the semi-finished and finished goods. Benefits Pri
2、ces are updated as future planned costs in the respective material master records Revaluation of existing inventory to the new standard prices Key Process StepsCreate costing run Execute costing run Review errors Analyze proposed standard prices Repeat annual operating plan scenarios Edit cost run a
3、nd execute AOP revenue cost of sales transfer Create frozen costing run Execute costing run Mark as future planned price Release standard cost estimate and revalue stock at start of new fiscal year Required SAP Applications and Company RolesRequired SAP ApplicationsSAP enhancement package 5 for SAP
4、ERP 6.0Company RolesCost ControllerMaster Data ControllerDetailed Process DescriptionStandard Cost CalculationAnnually, the standard costs for products are updated as part of the annual operations planning (AOP). This is necessary to reflect the changes in the prices of purchased parts, change in la
5、bor and overhead costs and change in bills of materials and operations needed to manufacture the semi-finished and finished goods.Once the planned prices for purchased parts are updated and planned activity prices are calculated, a costing run is done to calculate the new standard planned prices of
6、the materials. The calculated standards are checked. The responsible persons are asked to make necessary corrections, e.g. in master data. Once the calculations are considered to be correct, the prices are updated as future planned costs in the respective material master records.When the current yea
7、r is closed, the marked cost estimates are released. This results in a revaluation of existing inventory to the new standard prices.Process Flow DiagramStandard Cost CalculationMaster Data ControllerEventCost ControllerErrors?AOP Revenue Cost of Sales Transfer (173)AOP Cost Center Planning (175)Rele
8、ase Future Planned Price as Current Version and Revalue StockStart of New Fiscal YearAOP= Annual Operating PlanningFROZEN Annual Operating PlanAnnual Operating PlanAOP - Purchased Material Price Planning (174)Manufacturing Cost Center Planning(176)Correct Errors, Edit Costing Run and ExecuteRepeat A
9、OP Scenarios as RequiredEdit Costing Run and ExecuteEmail Cost Controller after Error SolutionReview Errors and Correct Master Data ErrorsReview Errors and E-Mail Unresolved Errors to Master Data TeamCreate Costing Run and ExecuteUpdate Future Planned PriceCreate Frozen Costing Run and ExecuteProduc
10、t Cost Correct?Errors?Analyze the Proposed Standard PricesYesYesYesNoNoNoDebit/Credit Inventory, Debit/Credit RevaluationLegendSymbolDescriptionUsage CommentsTo next / From last Diagram: Leads to the next / previous page of the DiagramFlow chart continues on the next / previous pageHardcopy / Docume
11、nt: Identifies a printed document, report, or form Does not correspond to a task step in a document; instead, it is used to reflect a document generated by a task step; this shape does not have any outgoing flow linesFinancial Actuals: Indicates a financial posting document Does not correspond to a
12、task step in a document; instead, it is used to reflect a document generated by a task step; this shape does not have any outgoing flow linesBudget Planning: Indicates a budget planning document Does not correspond to a task step in a document; instead, it is used to reflect a document generated by
13、a task step; this shape does not have any outgoing flow linesManual Process: Covers a task that is manually done Does not generally correspond to a task step in a document; instead, it is used to reflect a task that is manually performed, such as unloading a truck in the warehouse, which affects the
14、 process flow. Existing Version / Data: This block covers data that feeds in from an external process Does not generally correspond to a task step in a document; instead, this shape reflects data coming from an external source; this step does not have any ing flow lines System Pass / Fail Decision:
15、This block covers an automatic decision made by the software Does not generally correspond to a task step in the document; instead it is used to reflect an automatic decision by the system that is made after a step has been executed. External to SAPBusiness Activity / EventUnit ProcessProcess Refere
16、nceSub-Process ReferenceProcess DecisionDiagram ConnectionHardcopy / DocumentFinancial ActualsBudget PlanningManual ProcessExisting Version / DataSystem Pass/Fail DecisionSymbolDescriptionUsage CommentsBand: Identifies a user role, such as Accounts Payable Clerk or Sales Representative. This band ca
17、n also identify an organization unit or group, rather than a specific role.The other process flow symbols in this table go into these rows. You have as many rows as required to cover all of the roles in the scenario.Role band contains tasks common to that role.External Events: Contains events that s
18、tart or end the scenario, or influence the course of events in the scenario.Flow line (solid): Line indicates the normal sequence of steps and direction of flow in the scenario.Flow line (dashed): Line indicates flow to infrequently-used or conditional tasks in a scenario. Line can also lead to docu
19、ments involved in the process flow.Connects two tasks in a scenario process or a non-step eventBusiness Activity / Event: Identifies an action that either leads into or out of the scenario, or an outside Process that happens during the scenarioDoes not correspond to a task step in the document Unit Process: Identifies a task that is covered in a step-by-step manner in the scenarioCorresponds to a task step in the docume
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026广州发展新能源集团股份有限公司校园招聘备考题库完整答案详解
- 2026重庆市九龙坡区统计局统计调查公益性岗位招聘1人备考题库带答案详解(完整版)
- 2026云南玉溪易门兴福村镇银行招聘工作人员3人备考题库参考答案详解
- 2026北京协和医院检验科王瑶团队合同制科研助理招聘1人备考题库含答案详解(新)
- 2026中国地质调查局烟台海岸带地质调查中心招聘备考题库(第二批)附答案详解(典型题)
- 2026广西柳州市融水苗族自治县汪洞招聘专职禁毒社工的3人备考题库及答案详解(有一套)
- 2026年湖南吉首市教育和体育局下属学校引进12名急需紧缺学科教师备考题库及答案详解1套
- 2026江西省江铜铜箔科技股份有限公司第二批次春季校园招聘10人备考题库有答案详解
- 2026浙江宁波市慈城镇人民政府招聘合同制人员11人备考题库及答案详解(易错题)
- 2026广东佛山顺德区职工解困基金会选聘专职秘书长人选的1人备考题库及答案详解(考点梳理)
- 抽水蓄能电站地下厂房岩锚梁开挖施工方案
- 电商直播运营总监KPI绩效考核指标表
- (高清版)JTGT 3374-2020 公路瓦斯隧道设计与施工技术规范
- 中华民族共同体概论课件专家版3第三讲 文明初现与中华民族起源(史前时期)
- 创业培训服务投标方案(技术方案)
- 高速公路机电系统管理与维护
- 初始过程能力分析报告(PPK)
- 04FD02防空地下室电气设备安装图集
- ZJ50D电动钻机绞车驱动控制系统设计1916
- GB/T 41791-2022塑料制品薄膜和薄片无取向聚对苯二甲酸乙二醇酯(PET)片材
- GB/T 26610.4-2022承压设备系统基于风险的检验实施导则第4部分:失效可能性定量分析方法
评论
0/150
提交评论