车辆修理项目明细表_第1页
车辆修理项目明细表_第2页
车辆修理项目明细表_第3页
车辆修理项目明细表_第4页
车辆修理项目明细表_第5页
已阅读5页,还剩9页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、车辆修理项目明细表序号 维修及更换配件内容数量 维修要求 1 大修发动机全车板金喷漆修变速箱更换压缩机空调散热器节气门四根减震总成原 8 大灯总成 2 个厂 9 前后刹车盘10 刹车片 配 11 上支臂件 12 下支臂全车球头前后保险杠汽油泵保养修理发电机起动机全车门锁项目一to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the w

2、all. According to the template install spell number . Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than no

3、rmal concrete mixing 2030S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the co

4、nstruction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wi

5、re, tie all steel wire headto the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number . Structures in fair-faced concrete construction process mu

6、st use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 2030S. Into concr

7、ete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the constructionsite should be less than 1.5

8、 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head项目二to the ke

9、el, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number . Structures in fair-faced concrete construction process must use the same manufacturer in the

10、same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 2030S. Into concrete, by testing the slump, Visual co

11、ncrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, add

12、ing unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head序号 维修及更换配件内容数量 维修要求 1 发动机大修2 全车板金喷漆大修变速箱更换压缩机空调

13、散热器水箱大灯总成 2 个四根减震总成原 9 前后刹车盘厂 10 刹车片11 化油器 配 12 前后保险杠件 13 刹车总泵四个分泵上支臂下支臂全车球头分电器警灯全车门锁to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number .

14、 Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer shouldbe used, and the extens

15、ion of time than normal concrete mixing 2030S.Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stir

16、ring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zi

17、nc-coated steel wire, tie all steel wire headto the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number . Structures in fair-faced concrete const

18、ruction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing

19、 2030S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site shou

20、ld be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcementreinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wir

21、e head项目三to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number . Structures in fair-faced concrete construction process must use the same ma

22、nufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 2030S. Into concrete, by testing th

23、e slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hours, in the po

24、uring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head序号 维修及更换配件内容数量 维修要求1 发动机大修2全车

25、板金喷漆更换压缩机空调散热器水箱大灯总成 2 个四根减震总成前后刹车盘刹车片 原化油器厂 11 前后保险杠刹车总泵 配四个分泵件 14 上支臂下支臂全车球头分电器警灯全车门锁起动机发电机轮胎四条to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install sp

26、ell number . Structures in fair-faced concrete construction process mustuse the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, an

27、d the extension of time than normal concrete mixing 2030S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pou

28、r from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using

29、rust-proof zinc-coated steel wire, tie all steel wire headto the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number . Structures in fair-faced c

30、oncrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal co

31、ncrete mixing 2030S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the watercement ratio. Concrete mix pour from a stirring end to the constructi

32、on site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie

33、all steel wire head项目四to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number . Structures in fair-faced concrete construction process must us

34、e the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 2030S. Into concrete,

35、by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construction site should be less than 1.5 hou

36、rs, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie all steel wire head序号 维修及更换配件内容数量 维

37、修要求 1 发动机大修全车板金喷漆修空调发电机起动机更换四根减震总成原 7 大灯总成厂 8 前后保险杠9 警灯 配 10 前后刹车总成件 11 上支臂下支臂全车球头化电器大修变速箱检修全车线路to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spe

38、ll number . Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, an

39、d the extension of time than normal concrete mixing 2030S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drainthe barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour

40、 from a stirring end to the construction site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious rust stains. Tie wire reinforcement should be using r

41、ust-proof zinc-coated steel wire, tie all steel wire head附件to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to the template install spell number . Structures in fair-faced

42、concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal c

43、oncrete mixing 2030S. Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affecting the water cement ratio. Concrete mix pour from a stirring end to the construc

44、tion site should be less than 1.5 hours, in the pouring process, adding unexpected water mix or additive is prohibited. Before the reinforcement reinforcement must first clean up the bar, keep clean, no obvious ruststains. Tie wire reinforcement should be using rust-proof zinc-coated steel wire, tie

45、 all steel wire head车辆维修报价明细表车型 : 单位 : 元 序号 配件名称 规格 品牌 价格 工时费 管理费 合计 1维修总合计:最终报价 :注:工 期:售后服务及其它承诺:维修单位名称, 公章 ,:联系人 : 电话 :to the keel, ensure the joist space to meet design requirements. In addition, check for coating release agent, Panel clean or not, no templates with dirt on the wall. According to

46、 the template install spell number . Structures in fair-faced concrete construction process must use the same manufacturer in the same variety of admixture and admixture of the same manufacturer in the same fineness. Concrete mixer control of concrete mixing time of fair-faced concrete mixing forced mixer should be used, and the extension of time than normal concrete mixing 2030S.Into concrete, by testing the slump, Visual concrete surface color, no bleeding and segregation, and completes the record. Mixer should drain the barrel of water after each cleaning to avoid affec

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

最新文档

评论

0/150

提交评论