摘要随着经济的迅速发展和人民生活水平的提高,越来越多的人热衷于房地产投资,极大地刺激了建筑业的发展,同时国外的建筑市场对我国开放使我国的建筑业获得更大发展空间。本文从商务标和技术标两个方面系统的介绍了标书的编制过程、方法和依据,全面地介绍了标书的制作步骤,清晰的说明了工程量的计算过程和计算方法,通过工料分析、单价分析,说明了影响工程造价的主要因素,同时对设计方案进行优化,提出降低成本的措施。关键词:技术标;商务标;建筑工程
AbstractAlongwiththeeconomicalrapiddevelopmentandthelivesofthepeoplelevelenhancement,moreandmoremanypeoplecravetotherealestateinvestment,enormouslyhasstimulatedthearchitectureindustrydevelopment,simultaneouslytheoverseasconstructionmarketcausesourcountrytoourcountryopeningthearchitectureindustrytoobtainthebiggerdevelopmentspace.Thisarticlefromthecommercialsignandthetechnicalsigntwoaspectssystemsintroductionsignbookestablishmentprocess,themethodandthebasis,comprehensivelyintroducedthesignbookmanufacturestep,theclearshowingresiliencecomputationprocessandthecomputationalmethod,throughthemanpowerandmaterialsanalysis,theunitpriceanalysis,showedtheinfluenceprojectconstructioncostprimaryfactor.Thesemeasurescanserviceforconstruction.atthesametime,itisnecessarytoimprovetheprogrammeofdesignandputforwardstepsofreducingthecostofproject.KEYWORDS:commercialbid;technicalbid;architectural 投标函**市**5#地块项目24#住宅楼工程指挥部:根据已收到的**市**5#地块项目24#住宅楼工程的招标文件和施工图纸,遵照《中华人民共和国招投标法》等有关文件的规定,实施地勘察和认真研究上述招标文件的投标须知、合同条款、图纸、工程建设标准和工程量清单关后,我方愿以工程总造价为1363160元来承包工程并承担上述全部工程的施工和维修费用。我方特此同意所递投交的文件90天内有效。在此期间内我方将受本标书的制约,愿在该期间的任何时间接受贵单位的中标通知。一旦我方的投标被接纳,我方将派代表与贵单位共同协商,按照招标文件所列的条款的内容和格式正式签署**市**5#地块项目24#住宅楼工程施工合同,并切实按照合同的要求进行施工,保证按质、按量、按时完成工程。我方承诺,本标书一经寄出,不得以任何理由更改,中标后不得拒绝签订施工合同和施工;一旦投标书中标,在签订正式合同之前,本标书连同贵单位的中标通知,将构成我们与贵单位之间有法律约束力的协议文件。如果我方中标,我方将按规定提交总造价的10%银行保函,作为履约保证金,共同和分别地承担责任。我方金额为人民币为14万元的投标保证金,已按招标文件的有关要求递交。投标人:(盖章)法人代表:(盖章)2006年XX月XX日
投标承诺我方(****置业有限公司)对**市**5#地块项目24#住宅楼工程的招标文件的内容已完全理解并无异议,在此投标过程中服从本文件的有关规定,接受本工程招标文件所列合同主要条款及附加条款的全部内容。特此承诺投标人:(盖章)法人代表:(盖章)2006年XX月XX日第1篇商务标书的编制第1章编制的范围和依据1.1编制的范围1.1.1工程概况工程概况:****5#地块项目24#住宅楼设计单位:**建筑设计有限公司建设单位:****置业有限公司建设地点:**市东区六路以东,西五号路以南,西一路以南,西一路以西,荷泽路以北建筑类型、等级:居住建筑,二级工程建筑设计使用年限:50年防火分类:民用建筑,耐火等级为二级结构类型:砖混结构建筑面积:3783.75㎡、基地面积为683.25㎡建筑层数、高度:五层带储藏室和阁楼(19.819)1.1.2设计标高(1)本工程±0.00相当于绝对标高6.7m(2)各层标注标高为完成面标高(3)本工程标高以米为单位,总平面尺寸以m为单位,其他尺寸以mm为单位。1.1.3墙体工程(1)除注明外,墙体均采用KP1粘土多孔砖,120墙均采用粘土空心砖。(2)地下室外墙及地板穿洞均应符合《地下工程防水技术规范》GB501082001(3)所有室外地坪以下的墙体外侧均作材料为1:2水泥防水砂浆20厚,水泥砂浆防潮层内掺5%防水剂,顶部抹至墙身水平防潮层。(4)室内所有墙面阳角及门窗侧壁均作1:2.5水泥砂浆护角。(5)所有卫生间、厨房墙身底部浇C25混凝土高出卫生间楼地面150。1.1.4屋面工程(1)本工程的屋面防水等级三级,防水层合理使用年限为10年。(2)屋面做法及屋面节点索引见建施屋面平面图,露台、雨蓬等见各层平面图及有关详图。1.1.5室内装修工程(1)本次设计仅含公共部分及户内粗装修,室内装修表以外的装修有甲方另行二次委托。(2)厨房标高比同层楼面低30,卫生间比室内楼面低50。(3)室内油漆工程1.1.6室外装修(1)外墙面装修详见立面图及外墙详图。(2)外墙装修采用的多项材料均由施工单位提供样板,经建设和设计单位确认后进行封养,并据此验收。1.1.7防潮防水工程认真做好卫生间、厨房及屋顶防水层,厨房、卫生间防水层做好后要蓄水试验,蓄水深度20-30厚。1.2编制依据(1)依据河南省建筑设计有限责任公司提供的设计文件内的全部工程内容。(2)依据《山东省建筑工程消耗量定额》、《山东省建筑工程价目表》、《山东省建筑工程费用及计算规则》,以及相配套的费用定额和有关文件编制而成。(3)工程量清单计价根据《建设工程量清单计价规范》(GB50500—2003)。第2章工程量计算过程及说明本工程商务标书只编制土建和装饰部分。工程量计算过程见表2-1工程量计算表。表2-1工程量计算表序号各项工程名称计算公式单位数量土石方土方开挖59.95*15.65*2.75立方米2580.089冻土开挖59.95*15.65*0.65立方米609.84筏板基础C3059.95*15.65*0.4立方米938.218C30Z10.45*0.45*2.75*0.15*18立方米9.842竣工清理59.95*15.65*(14.5+3.25+2.7)立方米19186.548地基与边坡处理59.95*15.65*0.15立方米140.73.3砌筑工程储藏室外墙(4.2+3.6+2.1+0.6+4.2+8.1+2.2+3.1+1.38)*0.37*2.9-1.5*0.6*0.37*5*6立方米179.802内墙[(3.3+2.2+3.1+3.5+2.1+3.3+3.6+4.2+4.2+2.2)(7.5+10.84+1.2+1.2+1.4+1.3+0.48)*2]*2.9-3*0.24-3*0.9*1.9*12*0.24-0.6*1.2*2*0.24*3立方米307.41外墙(6.9+1.2+4.2+1.2+3.2+3.3+0.6+2.2+1.3+2.7+0.4+5.1)*6*2.9*0.24-1.8*1.9*3*2*3*0.24-1.5*0.6*1*6*0.24立方米109.32外墙合计715.8内墙(3.3+0.24+1.1+2.2+0.24+3.6+0.24+1.1+0.48+0.24+1.6)*2(1.1+3.6)*2.9*3*0.24-0.95*2.2*3*2*3*0.24-0.85*2.2*2*3*0.24-1.05*2.2*2*3*0.2446.62内墙合计立方米539.51现浇钢筋混凝土储藏室3.68*2.6-0.6*2.86平方米7.852一至五层(3.88*2.6-0.6*2.34)*5平方米43.42合计平方米51.272钢筋基础1Ф12@200[(2.1+3.6+4.2+4.2+3.6+2.1-2*0.35)/0.2+1]米1580.04*2.6+2*5*0.012-2*0.035)*62Ф12@200[(3.6+0.2-2*0.035)/0.2+1]*6*(2.2+2*5*0.012-2*0.035)米257.643Ф12@200[(3.3+2.2+3.1+3.1+2.2+3.3+3.3+3+3.6-2*0.035)/0.2+1]*(3+2*5*0.012-2*0.035)*6米2542.864Ф12@200[(3.3+3.6-2*0.035/0.2+1]*(1.8+2*5*0.012-2*0.035)*6米55.8
续表2-1工程量计算表5Ф12@200[(1.548+3.6+1.3-2*0.035)]/0.2+1)*6(2.4+2*5*0.012-2*0.035)+[(4.7-2*0.035)/0.2+1]*3*(2.4+2*5*0.012-2*0.035)米501.847Ф12@200[(3.1-2*0.035)/0.2+1]*6(2.4+1.4+2*5*0.012-2*0.035)372.48合计5310.665310.66*0.888吨4.715Ф14@200[(3.1-2*0.015)/0.2+1]*6*米1363.2(15.67-1.7+2*5*0.014-2*0.035)Ф12@150[(3.4-2*0.015)/0.15+1]*3(15.65+2*3*0.012-2*0.035)米1082.73Ф12@120[(3.9-2*0.015)/0.12+1](59.95+2*5*0.012-2*0.035)米1560.26Ф16@200[(3.93.9-2*0.015)/0.12+1]*(59.95+2*5*0.016-2*0.035)*6米1200.2合计141363.2*1.208吨1.64712(1082.73+1560.26)*0.888吨2.347161200.2*1.578吨1.894一层钢筋1φ8@200[(6.7-2*0.015)/0.2+1]*(3.3+2*5*0.008-2*0.015)*6米703.52φ8@200[(3.3-2*0.015)/0.2+1]*(6.72*5*0.008-2*0.015)*6米689.523φ8@200[(6.3+2*0.015)/0.2+1]*(0.75+2*3*0.008-2*0.015)*6米148.6084φ10@200[(3.3-2*0.015)/0.2+1]*(0.83*+2*3*0.01-2*0.015)*6米172.386φ8@200[(3.3-2*0.015)/0.2+1]*(3.9+2*5*0.008-2*0.015)*6米402.97φ8@200[(5.9-2*0.015)/0.2+1]*(0.83+0.24+2*3*0.008-2*0.015)*6米195.848φ8@200[(2.6-2*0.015)/0.2+1]*(0.83+0.24+2*3*0.008-2*0.015)*6米86.864108@180[(4.2-2*0.015)/0.2+1]*(3.6+2*5*0.008-2*0.015)*6米525.611φ8@200[(3.6-2*0.015)/0.2+1]*(0.78+2*5*0.008-2*0.015)*6米629.6412φ8@200[(7.4-2*0.015)/0.2+1]*(1.02+2*3*0.008-2*0.015)*6米230.43613φ8@200[(4.2-2*0.015)/0.2+1]*(2.1+2*3*0.008-2*0.015)*6米495.1815φ8@200[(3.1-2*0.015)/0.2+1]*(5.12*+5*0.008-2*0.015)*6米494.420φ8@200[(2.72-2*0.015)/0.2+1]*(3.95+2*3*0.008-2*0.015)*6米333.31221φ8@200[(2.72-2*0.015)/0.2+1]*(0.84+2*3*0.008-2*0.015)*6米145.11626φ10@200[(4.2-2*0.015)/0.2+1]*(2.4-2*0.015)*6米296.6227φ8@180[(2.2-2*0.015)/0.18]*[2.4-2*0.015)*6米184.6828φ8@200[(4.2-2*0.015)/0.2+1]*(1.29+2*3*0.008-2*0.015)*6米164.80829φ8@180[(4.2-2*0.015)/0.18+1]*(7.3+2*5*0.008-2*0.015)*6米1058.630φ8@200[(3.9-2*0.015)/0.2+1]*(3.1+2*5*0.008-2*0.015)*6米37831φ8@200[(3.1-2*0.015)/0.18+1]*(5.2+2*5*0.008-2*0.015)*6米542.432φ8@200[(5.8-2*0.015)/0.2+1]*(0.92+2*3*0.008-2*0.015)*6米163.21233φ8@200[(1.4-2*0.015)/0.2+1]*(0.92+2*3*0.008-2*0.015)*6米39.39634φ8@200[(5.5-2*0.015)/0.2+1]*(0.18+2*3*0.008-2*0.015)*6米123.984
续表2-1工程量计算表37φ8@180[(5.8-2*0.015)/0.18+1]*(4.8+2*3*0.008-2*0.015)*6米419.6639φ8@180[(2.6-2*0.015)/0.18+1]*(1.53+2*3*0.008-2*0.015)*6米120.74440φ8@200[(2.2-2*0.015)/0.2+1]*(4.62+2*3*0.008-2*0.015)*6米306.10841φ8@180[(5.78-2*0.015)/0.2+1]*(4.2+2*3*0.008-2*0.015)*6米733.93246φ8@150[(6.9-2*0.015)/0.15+1]*(1.88+2*3*0.008-2*0.015)*6米135.1φ8米9922.72φ10米471梁钢筋L1-1φ14(3.34+0.24-2*0.025)*5*6米34.08φ8@150[(3.34-0.025*2)/0.15+1](1.18-8*0.025+4*0.008+2*4.9*0.008)*6米137.391L1-2φ122.84*2*6米34.08φ162.84*2*6米φ6@100(2.84/0.1+1)*(1.1-8*0.025+4*0.006+2*4.9*0.006)*6米170.01L1-3φ143.1*2*6米37.2φ183.1*2*6米37.28@100(1.1/0.1+1)*(1.18-8*0.025+4*0.008+2*4.9*0.008)*6米71.96φ8@200(1.72/0.2+1)*(1.18-8*0.025+4*0.008+2*4.9*0.008)*6米58.882L1-5121.66*5*6米49.8φ6@150(1.66/0.15+1)*(0.98-8*0.025+4*0.006+2*4.9*0.006)*6米62.122φL1-6米φ162.84*2*6米34.08φ182.84*3*651.12φ8@100(2.84//0.1+1)*(1.28-8*0.025+4*0.008+2*4.9*0.008)*6L1-7φ62.44*2*6米29.28φ122.44*2*6米29.28φ162.44*5*6米73.2φ8@200(1.18-8*0.025+4*0.008+2*4.9*0.008)*6(2.44/0.2+1)米85.052φ6@200(2.44/0.2+1)*(1.65+6.25*0.006+3*2*0.006-2*0.025)*6米129.129L1-8φ61.4*2*6米16.8φ121.4*2*6米16.8φ161.4*5*6米42φ8@200(1.18-8*0.025+4*0.008+2*4.9*0.008)*6(1.4/0.2+1)米45.797φ8@100(1.4/0.1+1)(0.24+6.25*2*0.008-2*0.025*6)米24.36φ6@200((1.4/0.2+1)(1.65+6.25*0.006+3*2*0.006-2*0.025)*6米69.521
续表2-1工程量计算表L1-9φ61.65*2*6米19.8φ121.65*2*6米19.8φ8@200(1.18-8*0.025+4*0.008+2*4.9*0.008)*6*(1.62/0.2+1)米58.882φ8@400(1.65/0.4+1)*(0.24+6.25*2*0.008)*6米10.2φ6@200L1-10φ126*2.145*6米25.74φ146*2.145*277.22φ8@150(2.145/0.15+1)*(1.38-8*0.025+4*0.008+2*4.9*0.008)*6米116.136φ8@400(2.145/0.4+1)*(0.24+6.25*2*0.008)*6米12.24LL1-19.06*2*6米108.729.06*2*6米108.729.06*3*6米163.08φ8@200(9.06/0.2+1)*(1.18-8*0.025+4*0.008+2*4.9*0.008)*6米300.95φ8@400(9.06/04+1)*(0.24-6.25*2*0.008)*6米46.92φ6@200(9.06/0.2+1)*(6.25*0.006+0.45+0.12+3*0.006)*6米172.6386米439.879φ8米129.115φ12米293.22φ14米143.1φ16米183.36φ18米51.12φ20米192.78二层钢筋1φ8@200[(6.7-2*0.015)/0.2+1]*(3.3+2*5*0.008-2*0.015)*6米703.52φ8@200[(3.3-2*0.015)/0.2+1]*(6.72*5*0.008-2*0.015)*6米689.523φ8@200[(6.3+2*0.015)/0.2+1]*(0.75+2*3*0.008-2*0.015)*6米148.6084φ10@200[(3.3-2*0.015)/0.2+1]*(0.83*+2*3*0.01-2*0.015)*6米172.386φ8@200[(3.3-2*0.015)/0.2+1]*(3.9+2*5*0.008-2*0.015)*6米402.97φ8@200[(5.9-2*0.015)/0.2+1]*(0.83+0.24+2*3*0.008-2*0.015)*6米195.848φ8@200[(2.6-2*0.015)/0.2+1]*(0.83+0.24+2*3*0.008-2*0.015)*6米86.864108@180[(4.2-2*0.015)/0.2+1]*(3.6+2*5*0.008-2*0.015)*6米525.611φ8@200[(3.6-2*0.015)/0.2+1]*(0.78+2*5*0.008-2*0.015)*6米629.6412φ8@200[(7.4-2*0.015)/0.2+1]*(1.02+2*3*0.008-2*0.015)*6米230.43613φ8@200[(4.2-2*0.015)/0.2+1]*(2.1+2*3*0.008-2*0.015)*6米495.1815φ8@200[(3.1-2*0.015)/0.2+1]*(5.12*+5*0.008-2*0.015)*6米494.420φ8@200[(2.72-2*0.015)/0.2+1]*(3.95+2*3*0.008-2*0.015)*6米333.312
续表2-1工程量计算表21φ8@200[(2.72-2*0.015)/0.2+1]*(0.84+2*3*0.008-2*0.015)*6米145.11626φ10@200[(4.2-2*0.015)/0.2+1]*(2.4-2*0.015)*6米296.6227φ8@180[(2.2-2*0.015)/0.18]*[2.4-2*0.015)*6米184.6828φ8@200[(4.2-2*0.015)/0.2+1]*(1.29+2*3*0.008-2*0.015)*6米164.80829φ8@180[(4.2-2*0.015)/0.18+1]*(7.3+2*5*0.008-2*0.015)*6米1058.630φ8@200[(3.9-2*0.015)/0.2+1]*(3.1+2*5*0.008-2*0.015)*6米37831φ8@200[(3.1-2*0.015)/0.18+1]*(5.2+2*5*0.008-2*0.015)*6米542.432φ8@200[(5.8-2*0.015)/0.2+1]*(0.92+2*3*0.008-2*0.015)*6米163.21233φ8@200[(1.4-2*0.015)/0.2+1]*(0.92+2*3*0.008-2*0.015)*6米39.39634φ8@200[(5.5-2*0.015)/0.2+1]*(0.18+2*3*0.008-2*0.015)*6米123.98437φ8@180[(5.8-2*0.015)/0.18+1]*(4.8+2*3*0.008-2*0.015)*6米419.6639φ8@180[(2.6-2*0.015)/0.18+1]*(1.53+2*3*0.008-2*0.015)*6米120.74440φ8@200[(2.2-2*0.015)/0.2+1]*(4.62+2*3*0.008-2*0.015)*6米306.10841φ8@180[(5.78-2*0.015)/0.2+1]*(4.2+2*3*0.008-2*0.015)*6米733.93246φ8@180[(6.9-2*0.015)/0.15+1]*(1.88+2*3*0.008-2*0.015)*6米135.1φ8米9922.72φ10米471梁钢筋L1-1φ14(3.34+0.24-2*0.025)*5*6米34.088@150[(3.34-0.025*2)/0.15+1](1.18-8*0.025+4*0.008+2*4.9*0.008)*6米137.391L1-2φ122.84*2*6米34.08φ162.84*2*6米6@100(2.84/0.1+1)*(1.1-8*0.025+4*0.006+2*4.9*0.006)*6米170.01L1-3φ143.1*2*6米37.2φ183.1*2*6米37.28@100(1.1/0.1+1)*(1.18-8*0.025+4*0.008+2*4.9*0.008)*6米71.96φ8@200(1.72/0.2+1)*(1.18-8*0.025+4*0.008+2*4.9*0.008)*6米58.882L1-5φ121.66*5*6米49.8φ6@150(1.66/0.15+1)*(0.98-8*0.025+4*0.006+2*4.9*0.006)*6米62.122φL1-6米φ162.84*2*6米34.08182.84*3*651.128@100(2.84//0.1+1)*(1.28-8*0.025+4*0.008+2*4.9*0.008)*6L1-7φ62.44*2*6米29.28φ122.44*2*6米29.28φ162.44*5*6米73.2
续表2-1工程量计算表φφ8@200(1.18-8*0.025+4*0.008+2*4.9*0.008)*6(2.44/0.2+1)米85.052φ6@200(2.44/0.2+1)*(1.65+6.25*0.006+3*2*0.006-2*0.025)*6米129.129L1-8φ61.4*2*6米16.8φ121.4*2*6米16.8φ161.4*5*6米42φφ8@200(1.18-8*0.025+4*0.008+2*4.9*0.008)*6(1.4/0.2+1)米45.797φφ8@200(1.4/0.1+1)(0.24+6.25*2*0.008-2*0.025*6)米24.36φ6@200((1.4/0.2+1)(1.65+6.25*0.006+3*2*0.006-2*0.025)*6米69.521L1-9φ61.65*2*6米19.8φ121.65*2*6米19.8φ8@200(1.18-8*0.025+4*0.008+2*4.9*0.008)*6*(1.62/0.2+1)米58.882φ8@400(1.65/0.4+1)*(0.24+6.25*2*0.008)*6米10.2φ6@200L1-10φ126*2.145*6米25.74φ146*2.145*277.22φ8@150(2.145/0.15+1)*(1.38-8*0.025+4*0.008+2*4.9*0.008)*6米116.136φ8@400(2.145/0.4+1)*(0.24+6.25*2*0.008)*6米12.24LL1-19.06*2*6米108.729.06*2*6米108.729.06*3*6米163.08φ8@200(9.06/0.2+1)*(1.18-8*0.025+4*0.008+2*4.9*0.008)*6米300.95φ8@400(9.06/04+1)*(0.24-6.25*2*0.008)*6米46.92φ6@200(9.06/0.2+1)*(6.25*0.006+0.45+0.12+3*0.006)*6米172.638φ6米439.879φ8米129.115φ12米293.22φ14米143.1φ16米183.36φ18米51.12φ20米192.78以下工程量计算相同梁JL10.4*0.4*2.6*3立方米2.496JL22.4*0.4*6*0.3立方米1.584JL32*1.42*0.3*0.25*0.6立方米1.278JL43.1*0.4*0.4*2*6立方米5.952JL54.2*0.4*0.3*6立方米3.024
续表2-1工程量计算表JL64.2*0.4*0.45*6立方米4.536JL71.2*0.4*0.25*6立方米0.72JL81.8*0.4*0.25*6立方米1.08JL92.2*0.4*0.45*6立方米1.32JL101.2*0.4*0.25*6立方米0.72一层L1-10.35*0.24*6*3.34立方米1.683L1-20.15*0.4*6*2.84立方米1.022L1-30.35*0.24*6*3.1立方米1.563L1-50.25*0.24*1.66*6立方米0.598L1-60.4*0.24*2.84*6立方米1.636L1-70.4*0.24*2.2*6立方米1.056L1-80.4*0.24*1.2*6立方米0.692LL1-10.24*0.45*6*1.65立方米1.0692二层L1-10.35*0.24*6*3.34立方米1.683L1-20.15*0.4*6*2.84立方米1.022L1-30.35*0.24*6*3.1立方米1.563L1-50.25*0.24*1.66*6立方米0.598L1-60.4*0.24*2.84*6立方米1.636L1-70.4*0.24*2.2*6立方米1.056L1-80.4*0.24*1.2*6立方米0.692LL1-10.24*0.45*6*1.65立方米1.0692以下层相同外墙圈梁290.292立方米内墙圈梁547.2立方米过梁9.936+2.916+4.968+4.32+1.836+2.13立方米25.539板15.95*59.95*0.12*6立方米657.517阳台板1.8*4.2*0.1*6*6立方米27.216栏杆1.1*4.2*0.24*6*6立方米39.917阳台钢筋混凝土(4.2-0.24)*(1.8-0.24)*6*5立方米185.328厨房卫生间平方米324.096楼梯间平方米7.852地面防潮层平方米471.38内墙面平方米547.2内墙喷漆平方米9258.33顶棚抹灰平方米282.78屋面保温平方米48.135
第3章工程造价的确定**市**5#地块项目24#住宅楼商务标书工程造价的确定见表3-1、3-2。表3-1分部分项工程量清单计价表序号项目编码项目名称计量
单位工程数量金额(元)综合单价合价a.1土方工程0.0013877.661010101002001挖土方
1.土壤类别:三类土
2.挖土平均厚度:3m以内m32580.08301.283302.512010101004001冻土开挖
1.冻土厚度:1m以内m3609.840015.179251.273010101001001平整场地m2894.21000.28250.38a.2地基与边坡处理0.00388029.804010401001001带形基础
1.基础形式、材料种类:带型
2.混凝土强度等级:C30m3938.2160381.59358013.84a.3现浇混凝土基础0.0046200.495010402001001矩形柱
1.柱种类、断面:450*450
2.混凝土强度等级:C30m39.8420206.992037.206010403001001基础梁
1.断面:400*400
2.混凝土强度等级:C30m38.4880189.291606.697010403001002基础梁
1.断面:300*250
2.混凝土强度等级:C30m32.5660189.29485.728010403001004基础梁
1.断面:400*250
2.混凝土强度等级:C30m32.5200189.29477.019010403001003基础梁
1.断面:400*450
2.混凝土强度等级:C30m35.8620217.011272.1110010405001001有梁板
1.板厚:400
2.混凝土强度等级:C30m3109.5860213.0823350.5911010416002001预制构件钢筋
1.钢筋种类、规格:12t4.71502841.4313397.34续表3-1分部分项工程量清单计价表a.4现浇混凝土主体结构0.00420315.8812010416002002预制构件钢筋
1.钢筋种类、规格:8t4.25203065.3513033.8713010416002003预制构件钢筋
1.钢筋种类、规格:10t0.55702785.351551.4414010416002004预制构件钢筋
1.钢筋种类、规格:14t4.11702925.4312044.0015010416002005预制构件钢筋
1.钢筋种类、规格:12t4.15202909.6812080.9916010416002006预制构件钢筋
1.钢筋种类、规格:16t3.81702724.9610401.1717010416002007预制构件钢筋
1.钢筋种类、规格:18t1.22902709.123329.5118010416002008预制构件钢筋
1.钢筋种类、规格:20t2.81502670.907518.5819010410001001矩形梁
1.梁类型:400*400
2.混凝土强度等级:C25m38.4880195.371658.3020010410001002矩形梁
1.梁类型:300*250
2.混凝土强度等级:C25m34.6800195.37914.3321010410003001过梁
1.混凝土强度等级:C30m325.3950195.374961.4222010410001003矩形梁
1.梁类型:400*450
2.混凝土强度等级:C25m35.8620195.371145.2623010410001004矩形梁
1.梁类型:400*250
2.混凝土强度等级:C25m32.5200195.37492.3324010410001005矩形梁
1.梁类型:350*240
2.混凝土强度等级:C25m319.4760195.373805.0325010403004001圈梁
1.断面:240*250
2.混凝土强度等级:C30m3547.2000219.71120225.3126010405001002有梁板
1.板厚:120
2.混凝土强度等级:C25m3657.5170199.17130957.6627010403004002圈梁
1.断面:240*250
2.混凝土强度等级:C30m3290.2920199.1757817.46续表3-1分部分项工程量清单计价表28010410001006矩形梁
1.梁类型:400*150
2.混凝土强度等级:C25m36.1320195.371198.0129010410001008矩形梁
1.梁类型:250*240m33.5880195.37700.9930010410001007矩形梁
1.梁类型:300*240m320.3040195.373966.79a.5砌筑工程0.00255688.2531010302001001实心砖墙
1.墙体类型:实心砖
2.墙体厚度:240
3.砖品种、规格:机制标准红砖
4.砂浆强度等级:混合M2.5m3863.4000162.28140112.5532010302001002实心砖墙
1.墙体类型:实心砖
2.墙体厚度:240
3.砖品种、规格:机制标准红砖
4.砂浆强度等级:混合M2.5m3589.9100162.2895730.6033010305002001石勒脚
1.砂浆强度等级:水泥M7.5m3112.58610.000.0034010405008001雨篷、阳台板
1.名称:阳台板
2.混凝土强度等级:C30m327.21602.4466.41a.7装饰0.00239045.8235垫层水泥防潮地面471.38401.48697.6536楼面阳台混凝土185.328010.671977.4537楼梯间59.9560135.838143.8238厨房、卫生间防水435.000015.756851.25本页小计579764.32579764.3239喷漆内墙9258.330021.25196739.5140顶棚装饰282.780021.736144.81合计1257711.161257711.16表3-2单位工程费用汇总表序号土方工程金额(元)1分部分项工程量清单计价合计12804.162措施项目清单计价合计0.003其它项目清单计价合计0.004规费615.884.1工程排污费33.294.2工程定额测定费12.804.3社会保障费332.914.4住房公积金25.614.5危险作业意外伤害保险19.214.6安全施工费192.065税金457.626合计:13877.66合计388029.8388029.80序号现浇混凝土基础金额(元)1分部分项工程量清单计价合计42626.662措施项目清单计价合计0.003其它项目清单计价合计0.004规费2050.344.1工程排污费110.834.2工程定额测定费42.634.3社会保障费1108.294.4住房公积金85.254.5危险作业意外伤害保险63.944.6安全施工费639.405税金1523.496合计:46200.49合计46200.4946200.49序号现浇混凝土主体结构金额(元)
续表3-2单位工程费用汇总表1分部分项工程量清单计价合计387802.452措施项目清单计价合计0.003其它项目清单计价合计0.004规费18653.294.1工程排污费1008.294.2工程定额测定费387.804.3社会保障费10082.864.4住房公积金775.604.5危险作业意外伤害保险581.704.6安全施工费5817.045税金13860.146合计:420315.88合计420315.88420315.88序号砌筑工程金额(元)1分部分项工程量清单计价合计235909.552措施项目清单计价合计0.003其它项目清单计价合计0.004规费11347.244.1工程排污费613.364.2工程定额测定费235.914.3社会保障费6133.654.4住房公积金471.824.5危险作业意外伤害保险353.864.6安全施工费3538.645税金8431.466合计:255688.25合计255688.25255688.25序号措施费项目金额(元)1分部分项工程量清单计价合计0.002措施项目清单计价合计0.003其它项目清单计价合计2.00
续表3-2单位工程费用汇总表4规费0.094.1工程排污费0.014.2工程定额测定费0.004.3社会保障费0.054.4住房公积金0.004.5危险作业意外伤害保险0.004.6安全施工费0.035税金0.076合计:2.16合计2.162.16序号装饰金额(元)1分部分项工程量清单计价合计220554.492措施项目清单计价合计0.003其它项目清单计价合计0.004规费10608.674.1工程排污费573.444.2工程定额测定费220.554.3社会保障费5734.424.4住房公积金441.114.5危险作业意外伤害保险330.834.6安全施工费3308.325税金7882.666合计:239045.82合计239045.82239045.82第4章工料分析表4-1工料分析表项目编码10101002001工程量2580.083综合单价1.28合价3302.51工程内容挖土方1.土壤类别:三类土2.挖土平均厚度:3m以内序号名称单位数量单价合价1人工费0433.451.1综合工日(土建)工日15.48128433.452材料费(含主材、设备)003机械费02865.693.1履带式推土机135kW台班4.1281694.192865.694管理费0234.795利润0141.91项目编码10101004001工程量609.84综合单价15.17合价9251.27工程内容冻土开挖1.冻土厚度:1m以内序号名称单位数量单价合价1人工费06847.281.1综合工日(土建)工日244.55286847.282材料费(含主材、设备)01685.662.1电雷管(即发)个378.10.85321.392.2硝胺炸药kg198.695.441080.852.3工具钢kg30.7362.3973.462.4胶质导线1.5mm2m327.360.38124.42.5胶质导线2.5mm2m147.220.4972.142.6胶质导线4.0mm2m22.0150.6113.433机械费0719.463.1履带式推土机105kW台班1.3416536.27719.464管理费0657.415利润0397.62项目编码10401001001工程量938.216综合单价381.59合价358013.8工程内容带形基础1.基础形式、材料种类:带型2.混凝土强度等级:C30序号名称单位数量单价合价1人工费056874.661.1综合工日(土建)工日2031.22856874.662材料费(含主材、设备)0299399.62.13:7灰土m3-947.628.55-27053.9
续表4-1工料分析表2.2石灰t230.2772.3216652.872.3水m3797.341.71355.482.4黏土m31089.79.2510080.082.5黄砂(过筛中砂)m31415.63853794.552.6草袋m2455.971.47670.282.7C55现浇砼碎石<31.5m3-952.3241.37-2298542.8普通硅酸盐水泥62.5MPat395.2480189698.32.9碎石20-40m3894.230.3627148.043机械费01741.093.1电动夯实机20-62Nm台班41.28224.04992.413.2砼振捣器(平板式)台班15.01212.61189.33.3砼振捣器(插入式)台班53.47810.46559.384管理费025419.095利润015394.25项目编码10402001001工程量9.842综合单价206.99合价2037.2工程内容矩形柱1.柱种类、断面:450*4502.混凝土强度等级:C301人工费05281.1综合工日(土建)工日18.857285282材料费(含主材、设备)01500.332.1C25现浇砼碎石<40m3-9.84149.22-1468.622.2普通硅酸盐水泥32.5MPat3.8605276.641067.972.3黄砂(过筛中砂)m33.567738135.572.4碎石20-40m39.576330.36290.742.5水m32.71151.74.612.6水泥砂浆1:2m3-0.15194.46-28.72.7草袋m20.98421.471.453机械费08.873.1灰浆搅拌机200L台班0.039450.031.973.2砼振捣器(插入式)台班0.659410.466.94管理费0144.645利润087.59项目编码10403001001工程量8.488综合单价189.29合价1606.69工程内容基础梁1.断面:400*4002.混凝土强度等级:C30序号名称单位数量单价合价1人工费0257.871.1综合工日(土建)工日9.209528257.872材料费(含主材、设备)01342.92
续表4-1工料分析表2.1C25现浇砼碎石<31.5m3-8.62154.68-1332.612.2普通硅酸盐水泥32.5MPat3.4978276.64967.632.3黄砂(过筛中砂)m33.041338115.572.4碎石20-40m38.124330.36246.652.5水m33.25811.75.542.6草袋m25.11831.477.523机械费05.953.1砼振捣器(插入式)台班0.568710.465.954管理费0114.085利润069.09项目编码10403001002工程量2.566综合单价189.29合价485.72项目编码10403001003工程量5.862综合单价217.01合价1272.11工程内容基础梁1.断面:400*4502.混凝土强度等级:C30序号名称单位数量单价合价1人工费0337.791.1综合工日(土建)工日12.06428337.792材料费(含主材、设备)0926.142.1C25现浇砼碎石<31.5m3-5.98154.68-924.862.2普通硅酸盐水泥32.5MPat2.4276276.64671.572.3黄砂(过筛中砂)m32.11073880.212.4碎石20-40m35.638430.36171.182.5水m31.86891.73.183机械费08.223.1砼振捣器(插入式)台班0.785510.468.224管理费090.325利润054.7项目编码10405001001工程量109.586综合单价213.08合价23350.59工程内容有梁板1.板厚:4002.混凝土强度等级:C30序号名称单位数量单价合价1人工费02982.491.1综合工日(土建)工日106.52282982.492材料费(含主材、设备)020279.972.1草袋m2115.171.47169.312.2水m360.2721.7102.462.3C30现浇砼碎石<20m3-111.2180.22-20045.82.4普通硅酸盐水泥32.5MPat54.837276.6415170.052.5黄砂(过筛中砂)m338.486381462.452.6碎石15m398.21734.373375.7
续表4-1工料分析表3机械费088.483.1砼振捣器(插入式)台班3.835510.4640.123.2砼振捣器(平板式)台班3.835512.6148.374管理费01657.935利润01004.03项目编码10416002001工程量4.715综合单价2841.4合价13397.34工程内容预制构件钢筋1.钢筋种类、规格:12序号名称单位数量单价合价1人工费01151.211.1综合工日(土建)工日41.115281151.212材料费(含主材、设备)011878.852.1电焊条E4303Ф3.2kg33.9485.85198.62.2镀锌钢丝22#kg21.7834.4596.942.3钢筋Ф12t4.78572420.1511582.112.4水m30.70731.71.23机械费0367.213.1单筒慢速电动卷扬机50kN台班0.97674.4872.693.2对焊机75kVA台班0.4055147.2959.733.3钢筋切断机40台班0.311239.6612.343.4钢筋弯曲机40台班0.895922.8520.473.5交流电焊机30kVA台班1.7115118.01201.974管理费0951.25利润0576.083.3对焊机75kVA台班0.3571147.2952.63.4钢筋切断机40台班0.27439.6610.873.5钢筋弯曲机40台班0.788922.8518.033.6交流电焊机30kVA台班1.5072118.01177.864管理费0857.765利润0519.5项目编码10416002008工程量2.815综合单价2670.9合价7518.58工程内容预制构件钢筋1.钢筋种类、规格:20序号名称单位数量单价合价1人工费0413.811.1综合工日(土建)工日14.77928413.812材料费(含主材、设备)06922.582.1电焊条E4303Ф3.2kg27.0245.85158.092.2镀锌钢丝22#kg4.70114.4520.922.3钢筋Ф20t2.857223606742.992.4水m30.33781.70.573机械费0182.14
续表4-1工料分析表3.1单筒慢速电动卷扬机50kN台班0.30474.4822.643.2对焊机75kVA台班0.1886147.2927.783.3钢筋切断机40台班0.163339.666.483.4钢筋弯曲机40台班0.349122.857.983.5交流电焊机30kVA台班0.9937118.01117.274管理费0533.815利润0323.3项目编码10410001001工程量8.488综合单价195.37合价1658.3工程内容矩形梁1.梁类型:400*4002.混凝土强度等级:C25序号名称单位数量单价合价1人工费0309.441.1综合工日(土建)工日11.05128309.442材料费(含主材、设备)01342.962.1C25现浇砼碎石<31.5m3-8.62154.68-1332.612.2普通硅酸盐水泥32.5MPat3.4978276.64967.632.3黄砂(过筛中砂)m33.041338115.572.4碎石20-40m38.124330.36246.652.5水m33.3431.75.682.6草袋m25.05041.477.423机械费05.953.1砼振捣器(插入式)台班0.568710.465.954管理费0117.755利润071.31项目编码10410001002工程量4.68综合单价195.37合价914.33工程内容矩形梁1.梁类型:300*2502.混凝土强度等级:C25序号名称单位数量单价合价1人工费0170.621.1综合工日(土建)工日6.093428170.622材料费(含主材、设备)0740.472.1C25现浇砼碎石<31.5m3-4.75154.68-734.762.2普通硅酸盐水泥32.5MPat1.9286276.64533.532.3黄砂(过筛中砂)m31.67683863.722.4碎石20-40m34.479530.361362.5水m31.84321.73.132.6草袋m22.78461.474.093机械费03.283.1砼振捣器(插入式)台班0.313610.463.284管理费064.92
续表4-1工料分析表5利润039.32项目编码10410003001工程量25.395综合单价195.37合价4961.42工程内容过梁1.混凝土强度等级:C30序号名称单位数量单价合价1人工费0925.81.1综合工日(土建)工日33.06428925.82材料费(含主材、设备)04017.972.1C25现浇砼碎石<31.5m3-25.78154.68-3987.022.2普通硅酸盐水泥32.5MPat10.465276.642895.042.3黄砂(过筛中砂)m39.09938345.762.4碎石20-40m324.30730.36737.952.5水m310.0021.7172.6草袋m215.111.4722.213机械费017.83.1砼振捣器(插入式)台班1.701510.4617.84管理费0352.285利润0213.34项目编码10410001003工程量5.862综合单价195.37合价1145.26工程内容矩形梁1.梁类型:400*4502.混凝土强度等级:C25序号名称单位数量单价合价1人工费0213.71.1综合工日(土建)工日7.632328213.72材料费(含主材、设备)0927.492.1C25现浇砼碎石<31.5m3-5.95154.68-920.332.2普通硅酸盐水泥32.5MPat2.4157276.64668.282.3黄砂(过筛中砂)m32.10043879.822.4碎石20-40m35.610830.36170.342.5水m32.30881.73.922.6草袋m23.48791.475.133机械费04.113.1砼振捣器(插入式)台班0.392810.464.114管理费081.325利润049.25项目编码10410001004工程量2.52综合单价195.37合价492.33工程内容矩形梁1.梁类型:400*2502.混凝土强度等级:C25序号名称单位数量单价合价
续表4-1工料分析表1人工费091.871.1综合工日(土建)工日3.2812891.872材料费(含主材、设备)0398.722.1C25现浇砼碎石<31.5m3-2.56154.68-395.642.2普通硅酸盐水泥32.5MPat1.0385276.64287.292.3黄砂(过筛中砂)m30.90293834.312.4碎石20-40m32.41230.3673.232.5水m30.99251.71.692.6草袋m21.49941.472.23机械费01.773.1砼振捣器(插入式)台班0.168810.461.774管理费034.965利润021.17项目编码10410001005工程量19.476综合单价195.37合价3805.03工程内容矩形梁1.梁类型:350*2402.混凝土强度等级:C25序号名称单位数量单价合价1人工费0710.021.1综合工日(土建)工日25.35828710.022材料费(含主材、设备)03081.492.1C25现浇砼碎石<31.5m3-19.77154.68-3057.732.2普通硅酸盐水泥32.5MPat8.0259276.642220.282.3黄砂(过筛中砂)m36.978338265.182.4碎石20-40m318.64230.36565.962.5水m37.67061.713.042.6草袋m211.5881.4717.033机械费013.653.1砼振捣器(插入式)台班1.304910.4613.654管理费0270.175利润0163.62项目编码10403004001工程量547.2综合单价219.71合价120225.3工程内容圈梁1.断面:240*2502.混凝土强度等级:C30序号名称单位数量单价合价1人工费033109.981.1综合工日(土建)工日1182.52833109.982材料费(含主材、设备)086731.752.1C25现浇砼碎石<31.5m3-555.4154.68-85910.52.2普通硅酸盐水泥32.5MPat225.5276.6462381.12.3黄砂(过筛中砂)m3196.06387450.35
续表4-1工料分析表2.4碎石20-40m3523.7530.3615901.132.5水m3196.911.7334.752.6草袋m2451.991.47664.423机械费0383.493.1砼振捣器(插入式)台班36.66210.46383.494管理费08535.775利润05169.4项目编码10405001002工程量657.517综合单价199.17合价130957.7工程内容有梁板1.板厚:1202.混凝土强度等级:C25序号名称单位数量单价合价1人工费019662.391.1综合工日(土建)工日702.232819662.392材料费(含主材、设备)0110760.22.1C25现浇砼碎石<20m3-667.4163.8-1093172.2普通硅酸盐水泥32.5MPat285.64276.6479019.032.3黄砂(过筛中砂)m3239.59389104.522.4碎石15m3609.9934.3720965.192.5水m3358.351.7609.192.6草袋m2722.611.471062.243机械费0530.913.1砼振捣器(插入式)台班23.01310.46240.723.2砼振捣器(平板式)台班23.01312.61290.24管理费09297.955利润05630.98项目编码10403004002工程量290.292综合单价199.17合价57817.46工程内容圈梁1.断面:240*2502.混凝土强度等级:C30序号名称单位数量单价合价1人工费08680.891.1综合工日(土建)工日310.03288680.892材料费(含主材、设备)048900.342.1C25现浇砼碎石<20m3-294.7163.8-48263.12.2普通硅酸盐水泥32.5MPat126.11276.6434886.712.3黄砂(过筛中砂)m3105.78384019.622.4碎石15m3269.3134.379256.072.5水m3158.211.7268.962.6草袋m2319.031.47468.983机械费0234.4
续表4-1工料分析表3.1砼振捣器(插入式)台班10.1610.46106.283.2砼振捣器(平板式)台班10.1612.61128.124管理费04105.025利润02486.06项目编码10410001006工程量6.132综合单价195.37合价1198.01工程内容矩形梁1.梁类型:400*1502.混凝土强度等级:C25序号名称单位数量单价合价1人工费0223.551.1综合工日(土建)工日7.983928223.552材料费(含主材、设备)0970.192.1C25现浇砼碎石<31.5m3-6.22154.68-962.732.2普通硅酸盐水泥32.5MPat2.5269276.64699.042.3黄砂(过筛中砂)m32.19713883.492.4碎石20-40m35.869230.36178.192.5水m32.41511.74.112.6草袋m23.64851.475.363机械费04.33.1砼振捣器(插入式)台班0.410810.464.34管理费085.065利润051.52项目编码10410001008工程量3.588综合单价195.37合价700.99工程内容矩形梁1.梁类型:250*240序号名称单位数量单价合价1人工费0130.81.1综合工日(土建)工日4.671628130.82材料费(含主材、设备)0567.72.1C25现浇砼碎石<31.5m3-3.64154.68-563.312.2普通硅酸盐水泥32.5MPat1.4786276.64409.042.3黄砂(过筛中砂)m31.28563848.852.4碎石20-40m33.434330.36104.272.5水m31.41311.72.42.6草袋m22.13491.473.143机械费02.513.1砼振捣器(插入式)台班0.240410.462.514管理费049.775利润030.14项目编码10410001007工程量20.304综合单价195.37合价3966.79
续表4-1工料分析表工程内容矩形梁1.梁类型:300*240序号名称单位数量单价合价1人工费0740.21.1综合工日(土建)工日26.43628740.22材料费(含主材、设备)03212.492.1C25现浇砼碎石<31.5m3-20.61154.68-3187.742.2普通硅酸盐水泥32.5MPat8.3671276.642314.672.3黄砂(过筛中砂)m37.274938276.452.4碎石20-40m319.43430.36590.022.5水m37.99671.713.592.6草袋m212.0811.4717.763机械费014.233.1砼振捣器(插入式)台班1.360410.4614.234管理费0281.665利润0170.57项目编码10302001001工程量863.4综合单价162.28合价140112.6工程内容实心砖墙1.墙体类型:实心砖2.墙体厚度:2403.砖品种、规格:机制标准红砖4.砂浆强度等级:混合M2.5序号名称单位数量单价合价1人工费043636.241.1综合工日(土建)工日1558.42843636.242材料费(含主材、设备)095265.552.1M2.5混浆m3-194.392.78-18023.92.2普通硅酸盐水泥32.5MPat34.191276.649458.492.3黄砂(过筛中砂)m3197.18387492.972.4石灰t13.0272.32941.612.5水m3169.231.7287.682.6机制红砖240X115X53千块458.81168.0177084.83机械费01213.83.1灰浆搅拌机200L台班24.26250.031213.84管理费09948.15利润06024.81
第2篇技术标书的编制第1章工程概况1.1建筑概况工程概况:****5#地块项目24#住宅楼设计单位:**建筑设计有限公司建设单位:****置业有限公司建设地点:**市东区六路以东,西五号路以南,西一路以南,西一路以西,荷泽路以北建筑类型、等级:居住建筑,二级工程建筑设计使用年限:50年防火分类:民用建筑,耐火等级为二级结构类型:砖混结构建筑面积:3783.75、基地面积为683.25建筑层数、高度:五层带储藏室和阁楼(19.819)安全目标:杜绝大小工伤事故的发生,施工现场文明规范,创“安全文明优秀工地”称号。1.2结构概况建筑结构的安全等级:二级建筑抗震设防类别:丙类地基基础设计等级:乙级砌体结构施工质量控制等级:B级基础类型:板筏基础1.3施工现场的自然条件1.3.1风荷载基本风压:W0=0.5KN/㎡地面粗糙度类别:B级1.3.2雪荷载基本雪压:S0=0.30.5KN/㎡1.3.3抗震设防有关参数抗震设计分组为二组,设计地震基本加速度为0.1g抗震设防裂度:7度本工程场地类别为Ⅲ类场地,混凝土环境为一类,地下室及室外为二(b)类出地标准冻深:0.65m1.4施工特点本工程采用比较先进的技术和设备,配合优秀的施工队伍,高质量,快速度的完成施工任务。
第2章施工组织与部署2.1工程管理目标及保证措施2.1.1质量管理目标及保证措施(1)质量标准及质量管理符合国家验评标准,确保优良工程。强化创优意识,重点突出进度服从质量。严格“检查上工序,保证本工序,服从下工序”的“三工序”管理制度。加强施工过程质量控制,成立工程质量管理领导小组,明确质量控制目标,制定创优措施,项目经理任质量管理领导小组组长,负责协调整个施工过程的质量控制。实行质量否决制,明确奖罚制度。配备专职质检员,负责施工过程中各道工序,分项、分部工程的质量检查验收。公司总经理(2)质量保证体系如下图:公司总经理总工总工施工处质量处施工处质量处项目经理项目经理项目总工项目总工项目副经理试验计量员技术资项目副经理试验计量员技术资料员材料负责人安全检查员质量检查员施工负责人图2-1(3)施工质量控制质量控制坚持“质量第一,预防为主”的方针和“计划、执行、检查、处理”循环的工作方法,改进施工过程控制。质量控制因素包括人、材料、机械、方法(工艺)、环境。质量控制实行样板制,施工过程按要求进行自检、互检和交接检。隐蔽工程、指定部位和分项工程未经检验,不得转入下道工序。分项工程完成后,报监理工程师检验和认可。质量控制程序如下图:技术员交底技术员交底质量员旁站操作层施工质量员旁站操作层施工项目质量初验项目质量初验工长验收工长验收质量员校核质量员校核交隐验或下工序交隐验或下工序图2-2严格工序质量控制,把影响工序质量的因素都纳入管理范围。及时检查和审核质量统计资料,抓住影响质量的关键问题进行处理和解决。定期召开质量分析会,对影响工程质量潜在原因,采取预防措施。对可能出现的不合格,制定防止再发生的纠正措施并组织实施2.1.2安全管理目标及保证措施(1)安全管理方针和目标管理方针:在施工管理中,始终如一地坚持“安全第一、预防为主”的安全管理方针,以安全促生产,以安全保目标。管理目标:杜绝重大人身伤亡事故和机械事故,一般工伤事故频率控制在1.0‰以下,确保安全生产。创安全无大小事故、施工现场文明规范“安全文明施工优秀工地”称号。(2)组织机构保证安全生产、采取有利措施成立完善的施工组织机构。项目部以项目经理为首,由项目副经理、安全负责人、技术负责人、各专业施工队等各个方面的管理人员组成本工程安全生产管理机构,设立专职安全员负责安全生产工作。现场管理经常对职工进行安全教育,牢固树立“安全第一”的思想,各工种操作人员必须持证上岗,熟知本工种安全技术操作规程,工作前应进行安全交底。加强安全管理使之标准化,坚持“五同时”,“三不放”制度;坚持安全工前交底、工后讲评活动;坚持安全周日活动,每周安排一个晚上开展班组安全活动;坚持定期检查制度。施工现场设置安全标牌,危险区设立明显安全警示标志。(3)安全检查安全检查贯彻执行建
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- GB/T 47825-2026风洞天平校准系统技术要求
- 八年级道德与法治上册道德判断选择题专项训练卷专项精练版
- 安全标识绘制技巧讲解
- 程序员职业规划测评
- 肺心病康复建议
- 幼儿大班健康宣教内容
- 2026年10月自考00164劳动经济学押题及答案(江苏)
- 防水卷材检测报告
- 法律职业资格客观题核心考点模拟题(带评分)
- 法律职业资格客观题模拟考试题(评分标准)
- 既有建筑结构安全监测技术标准
- 双眼视异常处理方法-双眼视异常的棱镜处方(双眼视检查)
- JB T 6086-2013数控龙门镗铣床精度检验
- 胜利油田采油工程信息化建设及应用工作交流
- 中医护理操作并发症预防及处理
- SMT品质培训课件
- 畜禽养殖场排查情况记录表
- 商品和服务税收分类编码(开票指引)
- 注塑模具开发流程和加工工艺
- 射箭动作图解
- 工程土石方作业安全教育培训课件
评论
0/150
提交评论