StandardforAcceptanceTestsofElectric
Equipmentof1000kVSystemElectric
EquipmentInstallationEngineering
GB/T50832-2013
ChiefDevelopmentDepartment:ChinaElectricityCouncil
ApprovalDepartment:MinistryofHousingandUrbanRuraDevelopment
-
ofthePeoplesRepublicofChina
ImplementationDate:May1,2013专用
人人文库
ChinaPlanningPress
Beijing2020
ChineseeditionfirstpublishedinthePeoplesRepublicofChinain2013
EnglisheditionfirstpublishedinthePeoplesRepublicofChinain2020专用
byChinaPlanningPress
rd
3Floor,CTower,GuohongBuilding
No.A11,Muxidi-Beili,XichengDistrict
Beijing,100038
PrintedinChinabyBeijingJingyintangGraphicPrintingCenter
©2013byChinaElectricityCouncil
Allrightsreserved.Nopartofthispublicationmaybereproducedortransmittedinanyformor
byanymeans人人文库,graphic,electronic,ormechanical,includingphotocopying,recording,
oranyinformationstorageandretrievalsystems,withoutwrittenpermissionofthepublisher.
Thisbookissoldsubjecttotheconditionthatitshallnot,bywayoftradeorotherwise,belent,
resold,hiredoutorotherwisecirculatedwithoutthepublisherspriorconsentinanyformof
blindingorcoverotherthanthatinwhichthisispublishedandwithoutasimilarcondition
includingthisconditionbeingimposedonthesubsequentpurchaser.
ISBN978-7-5182-1141-8
中华人民共和国住房和城乡建设部公告
2019年第338号
住房和城乡建设部关于发布《电气装置安装工程
接地装置施工及验收规范》
等10项工程建设标准英文版的公告
现批准《电气装置安装工程接地装置施工及验收规范》(GB50169—2016)、《±800kV
直流换流站设计规范》(GB/T50789—2012)、《1000kV系统电气装置安装工程电气设备交
接试验标准》(GB/T50832—2013)、《光伏发电站施工规范》(GB/T专用50794—2012)、《光伏发电
站设计规范》(GB/T50797—2012)、《光伏发电工程验收规范》(GB/T50796—2012)、《电气装
置安装工程电气设备交接试验标准》(GB50150—2016)、《电力设施抗震设计规范》(GB
50260—2013)、《110kV~750kV架空输电线路施工及验收规范》(GB50233—2014)、《电气装
置安装工程串联电容器补偿装置施工及验收规范》(GB51049—2014)英文版。工程建设标
准英文版与中文版出现异议时,以中文版为准。
工程建设标准英文版由住房和城乡建设部组织中国计划出版社出版发行。
中华人民共和国住房和城乡建设部
2019年12月11日
人人文库
AnnouncementoftheMinistryofHousingandUrban-Rural
DevelopmentofthePeoplesRepublicofChina
No.1591
AnnouncementoftheMinistryofHousingandUrbanRuralDevelopmenton
-
PublishingtheNationalStandardofStandardforAcceptanceTestsofElectric
Equipmentof1000kVSystemElectricEquipmentInstallationEngineering
TheStandardforAcceptanceTestsofElectricEquipmentof1000kVSystemElectricEquipment
InstallationEngineeringhasbeenapprovedasanationalstandardwithaserialnumberofGB/T
50832-2013,andshallbeimplementedfromMay1,2013.
AuthorizedbytheResearchInstituteofStandardsandNorms,MinistryofhousingandUrban
-
RuralDevelopmentofP.R.China,thisstandardispublishedanddistributed专用byChinaPlanningPress.
MinistryofHousingandUrbanRuralDevelopmentofthePeoplesRepublicofChina
-
December25,2012
人人文库
Foreword
AccordingtotherequirementsofDocumentJIANBIAO〔2007〕No.126issuedbytheformer
MinistryofConstruction(nowknownastheMinistryofHousingandUrbanRuralDevelopmentofthe
-
PeoplesRepublicofChina)NoticeonPrintingtheDevelopmentandRevisionPlanofEngineering
-
ConstructionStandardin2007(Package2),thisstandardisjointlydevelopedbyStateGrid
CorporationofChina(SGCC)andotherrelativeinstitutes.
Thisstandardcomprises17chaptersand1appendixintotal,withthemaincontentsasfollows:
generalprovisions,termsandsymbols,powertransformers,reactors,capacitorvoltagetransformers,
gasinsulatedmetalenclosedelectromagneticvoltagetransformers,bushingcurrenttransformers,gas
---
insulatedmetalenclosedswitchgears,groundingswitches,bushings,surgearresters,suspension
-
insulatorspostinsulatorsandcompositeinsulatorsinsulatingoilSFgassecondarycircuitsoverhead
,,,6,,
powertransmissionlinesandgroundingdevices.
TheMinistryofHousingandUrbanRuralDevelopmentofthePeoplesRepublicofChinais
-
responsibleforthemanagementofthisstandard,theChinaElectricityCouncilisresponsiblefor
thedailymanagementofthisstandard,andSGCCisresponsible专用fortheexplanationofspecific
technicalcontents.Allrelevantorganizationsarekindlyrequestedtocollectdataandsumpup
experienceinimplementationofthisstandard,andsendrelevantopinionsandsuggestionsto
SGCC(Address:No.86westChanganAvenue,XichengDistrict,Beijing,Postalcode:
100031),forfuturerevisionreference.
Thisstandardinvolvesthefollowingchiefdevelopmentorganization,participatingdevelopment
organizations,chiefdraftersandchiefreviewers:
ChiefDevelopmentOrganization:
StateGridCorporationofChina
ParticipatingDevelopmentOrganizations:
ChinaElectricPowerResearchInstitute
StateGridElectricPowerResearchInstitute
StateGridACEngineeringConstructionCompany
NorthChinaElectricPowerResearchInstituteCo.,Ltd.(nowknownasStateGrid
人人文库JibeiElectricPowerCompany)
ChiefDrafters:
HanXiancaiWuZhirongWangShaowuWangXiaoqiSunGang
WangBaoshanChenGuoqiangWuShipuWangXiaoning
ChenJiangboWangNinghuaNieDexinWuYihua
DengWantingHanJinhuaHuXiaocenXiuJian
ZhangGuoweiWangPeilongLiJianjian
ChiefReviewers:
LingMinFuXinianLiQishengWangChengyuWanDaGuNihong
LiuYongdongHuHuiranCuiJingchunWangMengyunLiuZhaolin
1··
LianJianhuaYanDongWangLiyingYangLinghuiJinTaoDengChun
ChiefTranslators:
GaoJieChengYangchunTianXiaoXiongYuXuJunGeZhanyu
PengGuozhengZhangXiaHeFei
专用
人人文库
·2·
Contents
1GeneralProvisions……………(1)
2TermsandSymbols……………(2)
2.1Terms…………………………(2)
2.2Symbols………………………(2)
3PowerTransformers……………(3)
4Reactors…………………………(9)
5CapacitorVoltageTransformers………………(13)
6GasinsulatedMetalenclosedElectromagneticVoltageTransformers………(16)
--
7BushingCurrentTransformers…………………(18)
8GasinsulatedMetalenclosedSwitchgears……………………(20)
--
9GroundingSwitches……………(26)
10Bushings………………………(27)
11SurgeArresters………………(29)
12SuspensionInsulators,PostInsulatorsandCompositeInsulators…………(30)
13InsulatingOil…………………专用(31)
14SFGas33
6………………………()
15SecondaryCircuits……………(34)
16OverheadPowerTransmissionLines…………(35)
17GroundingDevices……………(36)
AppendixATableofSpecialTestItems………(37)
ExplanationofWordinginThisStandard…………(38)
ListofQuotedStandards…………(39)
人人文库
1GeneralProvisions
Thisstandardisformulatedwithaviewtoimprovethelevelofacceptancetestofelectric
1.0.1
equipmentof1000kVsystemelectricequipmentinstallationengineeringandensurethatelectric
equipmentcanbeputintooperation.
Thisstandardisapplicabletotheacceptancetestofelectricequipmentof1000kVACelectric
1.0.2
equipmentinstallationengineering.
Acceptancetestdatashallbesubjectedtocomprehensiveanalysisandcomparison.Judgment
1.0.3
resultsshallbeobtainedthroughcomprehensiveanalysis,withreferencetomanufacturersroutinetest
resultsandbycomparingwiththetestdataofsimilarequipment.
For1000kVoilfilledelectricequipment,priortowithstandvoltagetest,standingfornotless
1.0.4-
than168hoursshallbecarriedoutaftervacuumoilfillingandhotoilcirculation.
Forvarioustestsrelatedtotemperatureandhumidity,thetemperatureoftestedobjectand
1.0.5
ambienttemperatureandhumidityshallbemeasuredsimultaneously.Duringthemeasurementof
transformeroiltemperature,attentionshallbepaidtotheimpactsofsunlightonthemeasuredvalues.
Duringcomparisonwithmanufacturersroutinetestdata,comparison专用amongthetestdataofsimilar
equipmentmaybecarriedout.
Theinsulationtestshallbecarriedoutinafineweatherontheconditionthattheambient
1.0.6
temperatureoftestedobjectandinstrumentsshallnotbelowerthan5℃andtherelativeairhumidity
shouldnotbehigherthan80%.
Forspecialtestitemswhichhavespecialrequirementsontestsystemsandarefeaturedwith
1.0.7
hightechnicaldifficultiesandhighrequirements,testsshallbecarriedoutinaccordancewithAppendix
Aofthisstandard.
Fortheacceptancetestofelectricequipmentof1000kVsystemelectricequipmentinstallation
1.0.8
engineering,notonlytherequirementsstipulatedinthisstandard,butalsothoseinthecurrentrelevant
standardsofthenationshallbecompliedwith.
人人文库
·1·
2TermsandSymbols
2.1Terms
Acceptancetest
2.1.1
Itreferstoinspectionandtestcarriedoutafteronsiteinstallationofnewelectricequipmentand
-
duringcommissioningofsuchequipment.Forsomeequipment,theacceptancetestitemshavebeen
carriedoutduringinstallationworks,andthereforeshallalsobecoveredintherangeofacceptancetest.
Maintransformer
2.1.2
Itreferstothebodypartofatransformer,providedthatthetransformerbodyandtheregulating
compensationtransformerofone1000kVtransformerarearrangedindifferenttanks.
Regulatingcompensationtransformer
2.1.3
Itreferstothevoltageregulatingandcompensatingpartofatransformerandisarrangedinatank
differentfromthatofmaintransformer.Acompensatorisusedtoreducethevoltagefluctuationofthe
thirdwindingofatransformerduringvoltageregulationatneutralpoints.
Testofmaintransformer
2.1.4
Itreferstotestcarriedoutindependentlyforamaintransformer.专用
Testofregulatingcompensationtransformer
2.1.5
Itreferstoatestcarriedoutindependentlyforaregulatingcompensationtransformer.
Integraltestoftransformer
2.1.6
Itreferstoatestcarriedoutupontheconnectionbetweenmaintransformerandregulating
compensationtransformer.
Voltagetap
2.1.7
Itreferstoaleadwirewhichiseasilysubjectedtoexternalconnectionfromabushing,insulated
fromflangesorotherfasteners,andconnectedwithanexternalconductinglayerofcondenserbushing.It
isusedtoprovideavoltagesourceduringoperationofthebushing.
Gasinsulatedmetalenclosedelectromagneticvoltagetransformer
2.1.8--
Itreferstoanelectromagneticvoltagetransformerusedingasinsulatedmetalenclosed
--
switchgearsGIS.SulfurhexafluorideSFisusedasaninsulatingmediumforsuchelectromagnetic
()(6)
voltagetransformers人人文库.
2.2Symbols
——ratedvoltageofelectricequipment
Ur;
——ratedcurrentofelectricequipment
Ir;
——maximumworkingvoltageofelectricequipment
Um;
tanδ——dielectriclossfactor.
·2·
3PowerTransformers
Theacceptancetestsof1000kVtransformersshallbecarriedoutinaccordancewithtestson
3.0.1
maintransformers,testsonregulatingcompensationtransformersandintegraltests,andshallinclude
thefollowingcontents:
Thetestitemsofmaintransformersshallincludethefollowingcontents:
1
)Leakagetest;
1
)MeasurementofDCresistanceofwindingwithbushing;
2
)Measurementofvoltageratio;
3
)Inspectionofpolarityofoutgoingline;
4
)Measurementofinsulationresistance,absorptionratioandpolarizationindexofwindingwith
5
bushing;
)Measurementofdielectriclossfactor(tanδ)andcapacitanceofwindingwithbushing;
6
)Measurementofinsulationresistanceofcoreandclamp;
7
)Bushingtest;
8
)Bushingcurrenttransformertest;专用
9
)Testofinsulatingoil;
10
)Analysisofdissolvedgasesinoil;
11
)Noloadtestonlowvoltage;
12-
)Powerfrequencywithstandvoltagetestofwindingwithbushing;
13-
)Longdurationinducedvoltagetestwithpartialdischargemeasurementofwindingtogether
14--
withbushing;
)Frequencyresponseanalysisofwinding;
15
)Measurementofshortcircuitimpedanceatsmallcurrent.
16-
Thetestitemsofregulatingcompensationtransformersshallincludethefollowingcontents:
2
)Leakagetest;
1
)MeasurementofDCresistanceofwindingwithbushing;
2
)Measurementofvoltageratioofalltappings;
3
)Polarityinspectionforoutgoinglineoftransformer;
4
)Measurementofinsulationresistance,absorptionratioandpolarizationindexofwindingwith
5人人文库
bushing;
)Measurementofdielectriclossfactor(tanδ)andcapacitanceofwindingwithbushing;
6
)Measurementofinsulationresistanceofcoreandclamp;
7
)Bushingtest;
8
)Bushingcurrenttransformertest;
9
)Testofinsulatingoil;
10
)Analysisofdissolvedgasesinoil;
11
)Noloadtestonlowvoltage;
12-
)Powerfrequencywithstandvoltagetestofwindingwithbushing;
13-
·3·
)Longdurationinducedvoltagetestwithpartialdischargemeasurementwindingtogether
14--
withbushing;
)Frequencyresponseanalysisofwinding;
15
)Measurementofshortcircuitimpedanceatsmallcurrent.
16-
Theintegraltestitemsshallincludethefollowingcontents:
3
)Measurementofvoltageratioofalltappings;
1
)Inspectionofpolarityandphaserelationofoutgoingline;
2-
)Impactclosingtestonratedvoltage;
3
)Soundlevelmeasurement.
4
Duringleakagetest,0.03MPastaticpressureshallbeappliedtotheoillevelofconservator,and
3.0.2
thetestdurationshallbe24hours.Neitherleakagenordamageshallbeallowedduringthisperiod.
DCresistancemeasurementofwindingwithbushingshallmeetthefollowingrequirements:
3.0.3
Measurementshallbecarriedoutatalltappings.Thetestcurrentshouldnotexceed2.5Afor
1
1000kVwinding,notexceed5Afor500kVwinding,andnotexceed20Afor110kVwinding.Duringthe
measurementofDCresistanceofregulatingcompensationtransformer,atleastoneterminalofother
unmeasuredwindingsshallbedisconnectedfromothercircuits.
FortheDCresistanceofmaintransformerandregulatingcompensationtransformer,the
2
differenceamongthemeasuredvaluesofeachphaseshallbelessthan2%oftheaveragevalueofthe
threephases.专用
AftertheDCresistancemeasurementsofthemaintransformerandregulatingcompensation
3
transformer,theresultsshallbecomparedtotheroutinetestdataofproductsobtainedatthesame
temperature,andcorrespondingdifferenceinDCresistanceshallnotexceed2%.
TheDCresistancemeasurementoftransformerwithoffcircuittapchangershallbecarriedout
4-
afterthelockingoftapchanger.
Thetemperatureshallbetheaverageoiltemperature.Resistancevaluesmeasuredatdifferent
5
temperaturesshallbeconvertedaccordingtothefollowingformula:
=×(+)/(+)3.0.3
R2R1Tt2Tt1()
Where——resistanceΩmeasuredattemperaturesandrespectively
,R1,R2()t1t2;
T——temperaturecoefficientofresistance,takenas235forcopperconductor;
——differentmeasurementtemperatures°C.
t1,t2()
Thevoltageratiomeasurementshallmeetthefollowingrequirements:
3.0.4
Thevoltageratioateachtappingshallcomplywiththevoltageratiorulesindicatedon
1
nameplate,andshall人人文库notbeobviouslydifferentfromthedataonnameplate.Thevoltageratioof
regulatingcompensationtransformershallnotbeobviouslydifferentfrommanufacturersroutinetest
results.
Theallowabledeviationshallbe±0.5%fortheratedtappingvoltageratio,and±1%for
2
othertappingvoltageratio.
Inspectionshallbecarriedoutforpolarityandphaserelationofoutgoingline.Thepolarityof
3.0.5-
outgoinglineshallbeconsistentwiththesymbolsonthetransformernameplateandthemarksonoil
tank.Thethreephasephaserelationshallmeetthedesignrequirements.
--
Themeasurementofinsulationresistance,absorptionratioandpolarizationindexofwinding
3.0.6
withbushingshallmeetthefollowingrequirements:
·4·
5000Vmegametershallbeused.
1
Theinsulationresistanceshouldnotbelessthan70%ofroutinetestvalue.
2
Thetemperatureshallbetheaverageoiltemperature,andthemeasurementshallbecarriedout
3
atatemperaturebetween10°C-40°C.Incaseofanydifferencebetweenmeasurementtemperatureand
routinetesttemperature,conversiontoinsulationresistanceatthesametemperaturemaybecarriedout
forcomparison.Notemperatureconversionisrequiredforabsorptionratioandpolarizationindex.Incase
ofanydifferenceintesttemperatures,insulationresistanceshallbeconvertedaccordingtothefollowing
formula:
(-)/10
=×1.5t1t23.0.6
R2R1()
Theabsorptionratioshallnotbelessthan1.3,orthepolarizationindexshallnotbelessthan
4
1.5.Theabsorptionratioorpolarizationindexshallnotbeobviouslydifferentfrommanufacturer's
routinetestvalue.
IftheinsulationresistanceRisgreaterthan10000MΩ,witharelativelylowabsorptionratio
560s
andpolarizationindex,comprehensivejudgmentshallbecarriedoutbasedonthedielectriclossfactorof
windingwithbushing.
Themeasurementofdielectriclossfactor(tanδ)andcapacitanceofwindingwithbushingshall
3.0.7
meetthefollowingrequirements:
Duringthemeasurement,untestedwindingsshallbesubjectedtoshortcircuitgrounding,and
1-
windingstestedshallbeinshortcircuitconnectionwithtestinstrument专用.Thetestvoltageshouldbe
-
10kVAC.
Thedielectriclossfactor(tanδ)ofwindingwithbushingshallnotbegreaterthan130%of
2
routinetestvalue,andthecapacitanceshallbeinsignificantlydifferentfromroutinetestvalues.
Thetemperatureshallbetheaverageoiltemperature,andmeasurementshallbecarriedoutata
3
temperaturebetween10℃-40℃.Incaseofanydifferencebetweenmeasurementtemperatureand
routinetesttemperature,conversiontotanδatthesametemperaturemaybecarriedoutforcomparison.
Conversionshallbecarriedoutaccordingtothefollowingformula:
(-)/10
tan=tan×1.3t2t13.0.7
δ2δ1()
Wheretanandtandielectriclossfactorsattemperaturesandrespectively.
,δ1δ2——t1t2
Themeasurementofinsulationresistanceofcoreandclampshallmeetthefollowing
3.0.8
requirements:
2500Vmegametershallbeused,andthedurationshallbe1min.Noabnormitiesshallbefound
1
duringthisperiod.
Measuretheinsulationresistancebetweencoreandoiltank,andtheresultsshallnotbe
2人人文库
obviouslydifferentfromtheresultsofroutinetest.
Measuretheinsulationresistancebetweenclampandoiltankandtheinsulationresistance
3
betweencoreandclamp,andtheresultsshallnotbeobviouslydifferentfromtheresultsofroutinetest.
ThebushingtestshallbecarriedoutinaccordancewithChapter10ofthisstandard.
3.0.9
TheBushingcurrenttransformertestshallbecarriedoutinaccordancewithChapter7ofthis
3.0.10
standard.
TheinsulatingoiltestshallbecarriedoutinaccordancewithChapter13ofthisstandard.
3.0.11
Theanalysisofdissolvedgasesinoilshallmeetthefollowingrequirements:
3.0.12
Analysisshallbecarriedoutoncerespectively:beforefilling,after24hoursofstanding,
1
·5·
24hoursafterpartialdischargetestandACwithstandvoltagetest,afterimpactclosingandafter
24hoursand168hoursofoperationonratedvoltage.
TestshallbecarriedoutinaccordancewiththecurrentnationalstandardGuidetotheAnalysis
2
andtheDiagnosisofGasesDissolvedinTransformerOilGB/T7252.
Thegasdissolvedinoilshallnotcontainacetylene.Moreover,thetotalhydrocarbonshallbe
3
lessthanorequalto20μL/L,andthehydrogenshallbelessthanorequalto10μL/L.
Thedatameasuredeachtimeshouldbeofnoobviousdifference.Incaseofincreasingtendency
4
ingascontent,comprehensiveanalysisandjudgmentmaybecarriedoutincombinationwithrelativegas
generationrate,andtracinganalysis,wherenecessary,shallbecarriedoutbyshorteningthesampling
periodofchromatographicanalysis.
Noloadtestonlowvoltageshallmeetthefollowingrequirements:
3.0.13-
ThenoloadlossandnoloadcurrentoftransformershouldbemeasuredonAC380V,andthe
1--
NoloadtestonlowvoltageshouldbecarriedoutbeforetheDCresistancetest.
-
ThenoloadlossandthenoloadcurrentoftransformeronAC380Vshallnotbeobviously
2--
differentfromroutinetestvaluesmeasuredonthesamevoltage.
Thenoloadlossandthenoloadcurrentamongthreephasesmeasuredonavoltageof380V
3--
shallhavenoobviousdifference.
Thepowerfrequencywithstandvoltagetestofwindingwithbushingshallmeetthefollowing
3.0.14-
requirements:专用
ACwithstandvoltagetestshallbecarriedoutfortransformerneutralpointand110kVwinding,
1
andthepartialdischargeduringthetestperiodshallbemonitored.
Thetestvoltageshallbe80%ofroutinetestvoltage.Thevoltageofappliedwithstandvoltage
2
testshallbeinaccordancewiththosespecifiedinTable3.0.14,andthedurationofwithstandvoltage
testshallbe1min.
Table3.0.14Voltage(kV)ofappliedwithstandvoltagetest
VoltageapplicationpositionRoutinetestvoltageAcceptancetestvoltage
Neutralpoint140112
110kVwinding275220
Testvoltageshall,wherepossible,beclosetosinusoidalwaveform,andshallbeobtainedby
3
dividingthepeakofmeasuredvoltageby.
Duringtest,transformershallbefreefromabnormities.
4
Longdurationinducedvoltagetestwithpartialdischargemeasurementofwindingtogether
3.0.15-人人文库-
withbushingshallmeetthefollowingrequirements:
Longdurationinducedvoltagetestwithpartialdischargemeasurementofwindingtogether
1--
withbushingshallbecarriedoutformaintransformerandregulatingcompensationtransformer.
Remanenceimpactsshallbetakenintoaccountpriortotest.
TestandjudgmentmethodsshallcomplywiththecurrentnationalstandardPower
2
TransformersPart3:InsulationLevel,DielectricTestsandExternalClearancesinAirGB1094.3.
-
Duringpartialdischargetest,voltageshallbeappliedinaccordancewiththefollowing
3
procedures:
)Duringpartialdischargetestofmaintransformer,TheUis1100kV,andvoltagetoground
1m
·6·
shallbeasfollows:
U=1.5U/3(3.0.151)
1m-
U=1.3U/3(3.0.152)
2m-
Where——excitationvoltage
,U1;
——measuredvoltage.
U2
)Duringpartialdischargetestofregulatingcompensationtransformer,theUshallbe126kV,
2m
andvoltagetogroundshallbeasfollows:
U=1.7U/3(3.0.153)
1m-
U=1.5U/3(3.0.154)
2m-
)PowersupplyshallbeswitchedonunderavoltagenotgreaterthanU/3.
32
)Increasethevoltageto1.1Uandkeepfor5min.
4m
)IncreasethevoltagetoUandkeepfor5min.
52
)IncreasethevoltagetoU.Ifthetestpowerfrequencyisequaltoorlessthan2timesofrated
61
frequency,thetestdurationshallbe60s;andifthetestfrequencyexceeds2timesofrated
Rated'frequency
frequency,thetestdurationshallbecalculatedas120×,andshallnotbe
Test'frequency
lessthan15s.
)DecreasethevoltageuninterruptedlytoU,andkeepfor60minatleast,andmeasurethe
72专用
partialdischarge.
)Decreasethevoltageto1.1U,andkeepfor5min.
8m
)Switchoffthepowersupply,providedthatthevoltageisdecreasedtobebelowU/3.
92
Partialdischargeshallbeobservedandevaluatedinaccordancewiththecurrentnational
4
standardPartialDischargeMeasurementsGB/T7354,aswellasthefollowingrequirements:
)Measurementshallbecarriedoutatallwindingterminals,andforapairofautoconnected
1-
windings,simultaneousmeasurementshallbecarriedoutathighvoltageandlowvoltage
--
terminals.
)Forthemeasurementchannelconnectedtoeachterminal,repeatedpulseshallbeapplied
2
betweentheterminalandthegroundforcalibration.Incaseofanyabnormaldischargepulse
occurringduringpartialdischargemeasurement,ultrasonicmonitoringofpartialdischarge
shallbecarriedout,andcomprehensivejudgmentshallbecarriedout.
)Beforeandaftertheapplicationoftestvoltage,measurementshallbecarriedoutforthe
3
backgroundnoiselevelofallmeasurementchannels.
Duringvoltage人人文库risetoorvoltagedropfrompossiblepartialdischargeinceptionvoltage
)UU,
422
andextinctionvoltageshallberecorded.Apparentdischargeofpartialdischargeshallbe
measuredat1.1.
Um
)OnereadingshallberecordedatthefirststageofvoltageU.Norequirementonapparent
52
dischargeofthevoltageismadeatthisstage.
)OnereadingshallberecordedintheperiodofvoltageU.Norequirementonapparent
61
dischargeofthevoltageismadeinthisperiod.
)IntheentireperiodofthesecondstageofvoltageU,partialdischargelevelshallbeobserved
72
continuouslyandrecordedonceevery5min.
·7·
Ifthefollowingrequirementsaremet,thetestresultshallbequalified:
5
)Testvoltageshallsufferfromnosuddendrop.
1
)DuringtestofU,thecontinuouspartialdischargelevelsshallnotbegreaterthan100pC,
22
200pCand300pCfor1000kV,500kVand110kVsidesofmaintransformerrespectively,and
shallnotbegreaterthan300pCfor110kVterminalofregulatingcompensationtransformer.
)ThepartialdischargeshallnottrendtoincreasecontinuouslyatU.Accidentalpulsewitha
32
relativelyhighamplitudeandobviousexternalcoronapulsemaybeexcluded.
)Thecontinuousapparentchargelevelshallnotbegreaterthan100pCat1.1U.
4m
Frequencyresponseanalysisofwindingshallmeetthefollowingrequirements:
3.0.16
Frequencyresponsetestshallbecarriedoutforeachtransformerwinding.
1
Thefrequencyresponsecurvesofcorrespondingwindingsoftransformersinthesamegroup
2
shallbebasicallythesame.
Themeasurementofshortcircuitimpedanceatsmallcurrentshallmeetthefollowing
3.0.17-
requirements:
Measurementshallbecarriedoutfortheshortcircuitimpedanceoftransformeratacurrentof5A.
1-
Theshortcircuitimpedanceoftransformermeasuredatacurrentof5Ashallnotbeobviously
2-
differentfromtheroutinetestvaluesmeasuredatthesamecurrent.
Impactclosingtestonratedvoltageshallmeetthefollowingrequirements:
3.0.18
Impactclosingtestoftransformershallbecarriedouton专用ratedvoltage.Duringtest,the
1
transformerneutralpointshallbegrounded,andthetapshouldbeatthesettingtappingposition.
Theoperatingtimeafterthe1stimpactclosingshallnotbelessthan30minandcouldbe
2.,
graduallyshortenedaftereachsubsequentclosing,butshallnotbelessthan5min.
Duringimpactclosing,noabnormalsoundandthelikeshallbeproduced,andprotectiondevice
3
shallnotact.
Inrushcurrentanditsattenuationtimemaybemeasuredduringimpactclosing.
4
Thesoundlevelmeasurementshallmeetthefollowingrequirements:
3.0.19
Ontheconditionthatallinservicecoolingdevicesarestarted,thesoundlevelsmeasuredatthe
1-
locations2mawayfromthereferencesoundemittingsurfaceofmaintransformerand0.3mawayfrom
thatofregulatingcompensationtransformershallmeetrequirements.
Measurementmethodsandcorrespondingrequirementsshallcomplywiththecurrentnational
2
standardPowerTransformerPart10:DeterminationofSoundLe
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 数学分析模拟试卷(2022考研清华大学·真题逐题精讲)
- 考研数学二冲刺试卷全套-2025(完整版)
- 2025数学一历年真题(名师编写)
- 电工的考试题目及答案
- 2024年全国统考数学一历年真题(内部资料)
- 2025考研数学三模拟试卷|完整版
- 2026年中职(软件测试)软件功能测试实务试题及答案
- 2026年中职第一学年(食品检测技术)食品农药残留检测试题及答案
- 小学生考试题大全及答案
- 采样员考试题及答案详解
- 2026年新高考I卷语文试卷(原卷+答案)
- 统编版2026新教材道德与法治五年级上册第一单元第一课开天辟地的大事变教学设计
- 2026年全国网络安全行业职业技能大赛(网络安全管理员赛项)考试题库(含答案)(附答案)
- 福建省福州市2027届高三上学期开学适应性练习英语试卷(含答案)
- GB/T 31880-2026检验检测机构诚信基本要求
- 2026 年夏季四防洪涝过后复工复产安全课件
- 第2课 探索中国革命道路 第1课时 课件(内嵌视频)2026-2027学年道德与法治五年级上册统编版
- 2026年秋季学期统编版小学语文五年级上册教学计划附教学进度表
- 2026年福建省公需课培训(专业技术人员继续教育)试题及答案
- 2026年云南昭通市检验检测院招聘城镇公益性岗位5人笔试试题及答案解析
- (正式版)DB11∕T 065-2022 《电气防火检测技术规范》
评论
0/150
提交评论