版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、a,1,Basic Fire & Life Safetyfor Radiation Safety Professionals,Robert Emery, DrPH, CHP, CIH, CSP, RBP, CHMM, CPP, ARM Vice President for Safety, Health, Environment, Risk Management & Quality Assurance The University of Texas Health Science Center at Houston Associate Professor of Occupational Healt
2、h The University of Texas School of Public Health,a,Why do we need fire and life safety codes?,According to the NFPA, in 2007 there were 530,500 structure fires one every minute 3,000 civilian deaths one every 2.5 hours 15,350 civilianinjuries one every 30 minutes $10,600,000,000 in property damage
3、A fire department responded to a fire every 20 seconds,a,Objectives,Introduce the codes that drive fire and life safety compliance Overview of fire detection and suppression Provide tools to conduct a basic fire and life safety assessment,a,Fire Regulations and Codes,Safety and Health Regulations OS
4、HA (29 CFR 1910 & 1926) Fire and Life Safety Codes International Building Code (IBC) National Fire Protection Association (NFPA) Municipal Requirements,IBC,OSHA,NFPA,NIOSH,a,Additional Requirements,All codes are minimum requirements Insurance company requirements Company policies The Joint Commissio
5、n State and/or City requirements,a,How are These Codes Enforced,Codes are adopted by reference by ordinance. Plans for remodeling or a new construction must be approved by the authority having jurisdiction (AHJ) prior to starting work. State Fire Marshals Office Local Fire Department or City Code Of
6、ficials Designated Local AHJ Take Home Message Know what code(s) apply to your operation,a,Which do I follow?,Remodeling or new construction plans must be approved by authority having jurisdiction (AHJ) prior to starting work State Fire Marshals Office Local Fire Department or City Code Officials De
7、signated Local AHJ,a,Features of Building Fire and Life Safety,Alarms Sprinklers Rated Corridors Exit Access Number of Required Exits Egress Widths Occupant Loads Elevator Recall Fire Rated Doors & Frames,Smoke Control Rated Stairwells Fireproofing Requirements Electrical Safety Construction Combust
8、ibility Fire and Smoke Dampers Emergency Power Roof Assemblies,a,Fire Alarm Systems,Play an Essential Role in Protecting Property and Lives From Fire. Protection Goals Governs System Selection Building Occupant Safety Satisfy Building Codes or AHJ Requirements Property Protection First Responder Saf
9、ety Environmental Protection Combination,a,Fire Alarm Systems,IBC references NFPA 72 for installation and maintenance NFPA 72 National Fire Alarm Code Basic Components Panel Detection Manual Alarm Notification Off-Premises Connection for Supervision,a,Fire Alarm Systems,Fire Alarm System Will Provid
10、e Three Types of Signals Alarm Trouble indicates a fault in a monitoring circuit or component of the fire alarm system Bad smoke detector Ground fault Supervisory indicates a problem with other fire protection systems being monitored by the fire alarm system Water valve to sprinkler system closed Cl
11、ean agent system problem,Alarm,Supervisory,Trouble,a,Off-Premises Connection for Supervision,a,Common Fire Detection,Smoke Detector Ionization Photoelectric Heat Detectors Fixed Temperature Rate-of-Rise,a,Manual Pull Stations,Manual pull devices will be located on the wall Activated by pulling on a
12、handle Sends signal to buildings fire alarm system which places the building into alarm,a,Notification Appliances,Audible alarms (How loud is loud enough?) Public SPL must be 5 dB above any ambient noise that lasts 60 sec. or more, or 15 dB above the 24-hr average, whichever is greater Sleeping quar
13、ters Minimum of 75 dBA,a,Notification Appliances,Voice Communication Better to have a larger number of lower SPL units vs. a few very loud units Intelligibility can be a problem,a,Notification Appliances,Visual alarms Primarily intended to augment audible alarms Common Locations of Visual Alarms Cor
14、ridors Meeting rooms Restrooms Enclosed elevator lobbies,a,Fire Alarm System Interfaces,Heating Ventilation and Air Conditioning Duct detectors AHU shut-down Sprinkler water flow alarms Magnetic lock release mechanisms Door unlocking devices Elevator recall Stairwell pressurization,a,System Reliabil
15、ity,Based on Four Elements Design Equipment Underwriters Laboratories Factory Mutual Global Installation Maintenance Inspection, Testing, and Maintenance are crucial Unfortunately, some problems may be identified after the previous three have been completed,a,Fire Suppression,Water Based Suppression
16、 Clean Agent Systems Fire Extinguishers,a,Water Based Suppression,Wet-Pipe System contains water under pressure at all times Series of closed sprinkler heads Heat activates sprinkler head Water is discharged immediately * Not recommended if system could be exposed to temperatures below 40F,a,Wet-Pip
17、e System,Main valve Alarm check valve Fire department check valve Fire department connection Water motor alarm Sprinkler head Inspectors test valve,a,Wet-Pipe System,Only the sprinkler heads heated by the fire activate Fire sprinklers spray 18 gallons of water per minute,Sprinkler head,As temperatur
18、e rises the bulb will shatter,Water is released and deflected in a spray pattern,a,Sprinkler Color Codes and Ratings,a,Field Method for Temporary Stoppage of Sprinkler Head,a,Dry-Pipe System,System contains air under pressure Compressor on system keeps pressure up Sprinkler heads hold the pressure A
19、 dry-pipe valve holds back the water supply Valve opens when pressure falls below a predetermined level Sprinkler head activation pressure drop valve opens water sent to all heads water discharged from activated sprinkler head(s) * Recommended for areas that could experience freezing temperatures,a,
20、How do Dry-Pipe Systems Work?,Heat Activated,Pressure Drop,Water Discharges from activated head,Water sent to all sprinkler heads,Valve Opens,a,Dry-Pipe System,Supply check valve Main valve Dry pipe valve Fire department check valve Fire department connection Water motor alarm Sprinkler head Inspect
21、ors test valve,a,Pre-action System,System contains air under pressure Compressor on system keeps pressure up Water held back by pre-action valve System equipped with supplemental detection Operation of detection system allows pre-action valve to open and water fills the system Water not discharged u
22、ntil fire has generated sufficient heat to activate a sprinkler head * Typically found in computer rooms and museums,a,How do Pre-Action Systems Work?,Smoke Detected,Water Discharges from activated head,Water sent to all sprinkler heads,Valve Opens,a,Pre-action System,Supply check valve Main valve W
23、ater control or deluge valve Fire department check valve Fire department connection Water motor alarm Sprinkler head (closed) Detector Electrical bell Manual release station Control panel Inspectors test valve,a,Fire Pumps,Fire pumps are utilized when the hydraulic demand exceeds public supply capac
24、ity Components Pump and motor Controllers Jockey pump Water tank,a,Water Supply,Standpipe System Class I 2 inch hose connection intended for fire department use Class II 1 inch hose connections intended for first-aid fire fighting Class III Provided with both 2 inch and 1 inch hose connections Fire
25、Department Connection,a,Suppression Without Water,Halon NFPA 12A Being phased out per 1987 Montreal Protocol Carbon Dioxide NFPA 12 Clean Agent NFPA 2001 Inert gas formulation * These systems are often not recognized as allowable substitute for water suppression,a,Fire Extinguishers,NFPA 10 standard
26、 for portable fire extinguishers Select appropriate extinguisher for area Class A, B, C, D, and K Identify hazard occupancy Light Hazard Offices, schools, assembly halls Ordinary Hazard Mercantile storage, parking garages High Hazard Woodworking area, warehouses,a,Conducting a Basic Assessment,Deter
27、mine Your Building Occupancy Type First IBC Occupancy Classifications Assembly: Group A-1, A-2, A-3, A-4 and A-5 Business: Group B Educational: Group E Factory and Industrial: Groups F-1 and F-2 High Hazard: Groups H-1, H-2, H-3, H-4, and H-5 Institutional: Group I-1, I-2, I-3 and I-4 Mercantile: Gr
28、oup M Residential: Groups R-1, R-2, R-3 and R-4 Storage: Groups S-1 and S-2 Utility and Miscellaneous: Group U,a,Conducting a Basic Assessment,Additional Detailed Requirements Based on Use and Occupancy Covered Mall Buildings High-Rise Buildings Atriums Underground Buildings Motor-Vehicle-Related Occupancies Motion Picture Proj
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026贵州元豪铝业有限公司社会公开招聘4人笔试备考题库及答案详解
- 2026贵州贵阳观山湖人力资源服务有限公司派遣制人员招聘26人(观山湖区外国语实验小学)考试模拟试题及答案详解
- 2025年广东省佛山市街道办人员招聘考试试题及答案详解
- 2026年伊春市带岭区中小学教师招聘考试参考题库及答案详解
- 2026年福州市鼓楼区街道办人员招聘考试参考试题及答案详解
- 2025年武汉市江夏区街道办人员招聘笔试试题及答案详解
- 2026年汕头市金平区街道办人员招聘考试参考试题及答案详解
- 2026年双鸭山市宝山区街道办人员招聘笔试参考试题及答案详解
- 2026广西钦州市卫生学校招聘地理等学科专任教师2人考试模拟试题及答案详解
- 2026年物联网平台在仪器仪表中的应用案例
- 2026广东广州市海珠区科学技术协会招聘雇员1人考试备考题库及答案详解
- 2025年邢台市水务发展集团有限公司招聘真题
- 2026年湖北省综合评标评审专家库专家考试在线题库及答案
- 设备购买意向性合同
- 正确刷牙方法指导
- 2026年科技局事业单位招聘考试试题及答案
- 铁路信号工考试题库(附答案)
- 林带养护施工方案(3篇)
- 2026年《中华人民共和国保守秘密法》培训课件
- 中国宗法制度论
- 血透室消毒隔离制度
评论
0/150
提交评论