版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、NPB 840 Introduction,840 Introduction,Introductions Agenda Program Background Ventilator overview Installation Installation instructions Workshop User interface Interface overview User interface instruction Workshop,Agenda day 1,840 Introduction,Dissemble system components from cart Remove the inspi
2、ratory and expiratory modules from the BDU Pneumatic Theory BDU, Inspiration Module Written Test,Agenda day 1,840 Introduction,Review Test Pneumatic Theory Continued BDU Inspiration Module Patient Circuit BDU, Exhalation Module Optional Compressor,Agenda Day 2,840 Introduction,Electronic Theory Grap
3、hical User Interface Breath Delivery Unit Backup Power Supply Reassemble and Test Written Test,Agenda Day 2,840 Introduction,Review Test PTS 2000 and Performance Verification Introduction PTS 2000 operation Workshop Written Test,Agenda Day 3,840 Introduction,Review test Conceptual Troubleshooting Er
4、ror codes Symptoms Troubleshooting Written Test,Agenda Day 4,840 Introduction,Review Test Service Documentation Rap Up,Agenda Day 5,840 Introduction,Rest rooms Smoking policy Attire Environment Breaks Lunch Study room,General,840 Introduction,Electronically Controlled Pneumatically Powered Main Comp
5、onents Graphical User Interface (GUI) Breath Delivery Unit (BDU) Backup Power Source (BPS) Optional Components Compressor Unit (CU) Cart or Shelf Mount Patient Circuit (PC),Operator Interface Operator selections Patient and ventilator performance Alarms Monitors BDU Communications Can be Mounted Sep
6、arately Optional 3 Meter Cable,840 IntroductionGraphical User Interface (GUI),840 IntroductionBreath Delivery Unit (BDU),Ventilator Core Pneumatics Electrical Electronic Alarms Distributes Power Communicates with and/or Monitors GUI PC monitor only CU BPS,Automatically switches on and off and powers
7、 system for at least 30 minutes (full battery charge) if AC power is lost or very low Battery is automatically charged when ventilator connected to power Does not supply humidifier or compressor,840 IntroductionBackup Power Supply (BPS),Starts when ventilator is turned on Stops when AC power is low
8、or Backup Power Supply (BPS) is in use Charges accumulator/heat exchanger at startup and maintains charge Receives electrical power from BDU and has two-way communications with BDU,840 IntroductionOptional Compressor Module,Mounting of system components Mounting of accessories Cart makes system mobile Shelf mount eliminates need for floor space for ventilator,840 IntroductionOptional Cart or Shelf Mount,Conditions and conducts gas to and from the patient Adult or pediatric circuits, accessories, an
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 车辆钣金喷装施工方案
- 单次冲击下轻钢泡沫混凝土复合楼板的破坏行为和影响因素研究
- 2025年江苏民法专升本真题及答案
- 低郁密度条件下果园轮式机器人行间运行控制方法研究
- 2026年农村医疗卫生信息化方案
- 面向SiC晶圆减薄气浮主轴稳定特性分析与实验研究
- 雨课堂学堂在线学堂云《音乐微格教学(浙江音乐学院)》单元测试考核答案
- 统编版初中语文七年级下册第一单元第1课《邓稼先》全息教学方案
- 检测中心物料需求预测调度方案
- 小学二年级语文下册《寓言二则》第一课时《亡羊补牢》教学设计
- 消防安装工程各项调试方案
- 沉浸式文旅景区演绎规划方案【旅游】【沉浸式演艺空间】
- 中医师承关系协议书
- 数据挖掘与机器学习全套教学课件
- 2024-2025年上海中考英语真题及答案解析
- 举一反三奥数解题技巧大全100讲
- 产品合格证标准模板
- 用excel绘制热网水压图
- 山西省建设工程计价依据
- 制药空调净化系统基础培训
- GB/T 42001-2022高压输变电工程外绝缘放电电压海拔校正方法
评论
0/150
提交评论