1、measures planned implementation of technical protection measures and security schemes, the problems should be promptly reported to the Manager. 37th: carbon supervisor leadership and head of the company should periodically check the anti-accident measures planned, security technology protection meas
2、ures planned in implementation of measures against accidents and guarantee schemes, security technology protection measures planned in implementation. Seventh article 38th of education and training: new factory (company) production staff (including internships, commissioned officer), must be approve
3、d by the factory (company), workshop and team level safety education upon passing the examination before entering production site. Tertiary-level education after card registration, by the companys production technology section recovery archive, and reported to the company trade unions, safety record
4、. Training and examinations including the safe work procedures as well as relevant safety regulations, work environment and jobs there are risk factors, preventive measures and emergency treatment, and so on. The 39th article: new producers must receive the following training and qualified posts: (a
5、) the operating personnel, scheduling, must pass through the field point, institutional learning, on-site training and classes practice; (B) the maintenance, including technical staff, must undergo maintenance, technical specifications for learning and class practice; (C) special operations personne
6、l, must pass the national professional training, after obtaining a special operations qualifications before they can post. 40th: on-the-job training of production personnel: (I) post production staff should regularly carry out targeted of technical questions and answers, an accident expected on site
7、 training and anti-accident; (B) from running post 1 month and above the main post on duty or leave transportation . Drive system and security studies, arranged by upper management or organization of the examination. The 42nd article: June of every year once regulatory and safety procedures of the c
8、ompany system of examinations, examination the failed again, still not eligible waiting list study. Article 43rd: every year in June the work ticket issuer, assignee, licensee of work training, after passing the examination, as a formal announcement are eligible to work as ticket issuer, head of ins
9、pection, work permits and the right to a separate high-pressure equipment list, and reported to the Management Department. Failing the exam may not serve as a two person, stop classes, examinations before they can post. 44th: for breach of discipline system caused the accident, a kind of disorder an
10、d attempted serious responsibility for the accident, in addition to the relevant provisions dealing with should also be tasked to learn about a point system, and after passing the exam, before they can post. Article 45th: units of the company using the security video, slide projector, television, co
11、mputer, multimedia, radio, Billboard, artifacts, photo exhibitions, as well as security knowledge exam, lectures, contests, and other forms of advocacy, popularize the knowledge of security technology, targeted, Visual training, enhancing workers safety awareness and self-protection ability. Article
12、 46th工程量清单设备及安装工程量报价汇总表序号项 目 名 称综合单价总价备注135kV开关柜2综合自动化系统设备3控制电缆4非金属12芯光缆(1600)5变电所设备室防火门(3套)6全站室内墙面粉刷(1500平米)7站前水泥道路敷设(30米)8站前护坡及绿化(30米)9施工准备工程10设备试验及调试11安全文明生产技术措施补助费12安全保证金合计项目编号项目名称及内容计量单位工程量综合单价总价备 注135kV开关柜(1)35kV G1高压进线隔离柜面11250A,31.5kA(2)35kV G2高压计量柜面11250A,31.5kA(3)35kV G3高压PT柜面11250A,31.5kA
13、(4)35kV G4高压出线柜面11250A,31.5kA2综合自动化系统设备(1)公用测控及远动柜面1(2)主变测控保护柜套1(3)10kV保护测控单元套1(4)10kV电容器保护测控单元套1(5)UPS不间断供电电源套1(6)运行维护工作站套1(7)与电站监控系统接口软件及网络附件(包括光电转换等设备)套1电气设备采购、安装工程分项报价表项目编号项目名称及内容计量单位数量综合单价总价(元)生产厂家/型号135kV G1高压进线隔离柜(1)高压避雷器(2)带电指示器(3)指示灯(4)按钮(5)套管(6)小型断路器(7)小型断路器(8)高压连接片(9)电表支架(10)联合接线盒(11)温湿度控
14、制器(12)加热板(13)电磁锁(14)铜排(15)壳体(16)接地转置(17)隔离手车(18)触头盒(19)静触头(20)热缩套管(21)导线(22)导线(23)保险端子(24)端子(如有补充请自行补充,形成一个完整系统所必须元器件请分项报价)电气设备采购、安装工程分项报价表项目编号项目名称及内容计量单位数量综合单价总价(元)生产厂家/型号 235kV G2高压计量柜(1)高压电压互感器(2)电流互感器(3)高压熔断器(4)指示灯(5)旋钮(6)套管(7)小型断路器(8)小型断路器(9)高压连接片(10)电表支架(11)联合接线盒(12)温湿度控制器(13)加热板(14)电磁锁(15)铜排(
15、16)壳体(17)接地转置(18)PT手车(19)触头盒(20)静触头(21)热缩套管(22)导线(23)导线(24)保险端子(25)端子(如有补充请自行补充,形成一个完整系统所必须元器件请分项报价)电气设备采购、安装工程分项报价表项目编号项目名称及内容计量单位数量综合单价总价(元)生产厂家/型号335kV G3高压PT柜(1)高压电压互感器(2)熔断器(3)电压表(4)高压避雷器(5)指示灯(6)带电指示器(7)旋钮(8)按钮(9)套管(10)小型断路器(11)加热板(12)铜排(13)铜排(14)电磁锁(15)壳体(16)PT手车(17)接地转置(18)触头盒(19)静触头(20)热缩套管
16、(21)导线(22)保险端子(23)端子(如有补充请自行补充,形成一个完整系统所必须元器件请分项报价)电气设备采购、安装工程分项报价表项目编号项目名称及内容计量单位数量综合单价总价(元)生产厂家/型号435kV G4高压出线柜(1)高压避雷器(2)真空断路器 (3)电流互感器(4)微机保护(5)电流表(6)转换开关(7)指示灯(8)旋钮(9)套管(10)小型断路器(11)高压连接片(12)加热板(13)电磁锁(14)铜排(15)壳体(16)接地转置(17)接地刀(18)触头盒(19)静触头(20)热缩套管(21)导线(22)导线(23)保险端子(24)端子(如有补充请自行补充,形成一个完整系统
17、所必须元器件请分项报价)电气设备采购、安装工程分项报价表项目编号项目名称及内容计量单位数量综合单价总价(元)生产厂家/型号5综合自动化系统设备(1)公用测控及远动柜工控机通讯管理机交换机光电转换器网线通讯电缆网卡公用测控设备(2)主变测控保护柜主变高后备保护测控装置主变差动保护测控装置主变低后备保护测控装置主变温度表通讯防雷器电源防雷器屏体及附件温度变送器非电量保护操作箱(3)10kV保护测控单元(4)10kV电容器保护测控单元(5)UPS不间断供电电源电气设备采购、安装工程分项报价表项目编号项目名称及内容计量单位数量综合单价总价(元)生产厂家/型号5综合自动化系统设备(6)运行维护工作站监控
18、主机液晶显示器A4激光打印机有源报警音箱监控系统开发软件监控系统运行软件操作系统通讯管理机交换机网线通讯电缆光电转换器光纤光纤盒电脑桌椅后台监控系统(7)网络附件注:1远动通道上均应配置防雷器。210kV保护测控单元安装于10kV开关柜上。其中线路1台,电容器1台。(如有补充请自行补充,形成一个完整系统所必须元器件请分项报价)项目编号项目名称及内容计量单位数量综合单价总价(元)生产厂家/型号3控制电缆控制电缆4非金属12芯光缆(1600) 光缆敷设套管5变电所设备室防火门(3套)单开门(3套)变电所设备室防火门拆除(3套)防火门安装辅料(如有补充请自行补充,形成一个完整系统所必须元器件请分项报
19、价)项目35KV变电所技改招标文件 技术专用规范公司35KV变电所技改电气一次设备 技术文件 目次1 标准技术参数2 项目需求部分2.1 货物需求及供货范围一览表2.2 必备的备品备件、专用工具和仪器仪表供货表2.3 图纸资料提交单位2.4 工程概况2.5 使用条件2.6 项目单位可选技术参数表2.7 项目单位技术差异表2.8 一次、二次及土建接口要求(适用于扩建工程)3 投标人响应部分3.1 投标人技术偏差表3.2 投标产品的销售及运行业绩表3.3 投标人需提供的设备图纸及资料3.4 主要组部件材料3.5 推荐的备品备件、专用工具和仪器仪表供货表1 标准技术参数投标人应认真逐项填写技术参数响
20、应表中投标人保证值,不能空格,也不能以“响应”两字代替,不允许改动标准参数值。“投标人保证值”应与型式试验报告相符。如有偏差,请填写技术偏差表。表1 标准技术参数表(投标人填写)序号名 称单位标准参数值投标人保证值一开关柜共用参数1结构型式小车式(投标人填写)2额定电压kV40.5(投标人填写)3额定电流电缆出线A1250(投标人填写)电容器出线1250(投标人填写)接地变出线1250(投标人填写)母线设备1250(投标人填写)4温升电流A1.1Ir(投标人填写)5额定工频1min耐受电压(相对地)kV118/(95)(投标人填写)6额定雷电冲击耐受电压峰值(1.250ms)(相对地)kV21
21、5/(185)(投标人填写)7额定短路开断电流kA25(投标人填写)8额定短路关合电流kA63(投标人填写)9额定短时耐受电流及持续时间kA/s25/4(投标人填写)10额定峰值耐受电流kA63(投标人填写)11辅助和控制回路短时工频耐受电压kV2(投标人填写)12局部放电试验电压kV1.140.5/(投标人填写)单个绝缘件pC3(投标人填写)电压互感器、电流互感器10(投标人填写)13供电电源控制回路VDC220 / DC 110参考表6相应项填写辅助回路VAC 380/ AC 220参考表6相应项填写14燃弧持续时间S0.30.5参考表6相应项填写15使用寿命年30(投标人填写)16设备尺
22、寸单台开关柜整体尺寸(长宽高)mm(280014002600)/(280012002600)参考表6相应项填写设备的最大运输尺寸(长宽高)(投标人提供)(投标人填写)17防护等级柜体外壳IP4X(投标人填写)隔室间IP2X(投标人填写)18爬电距离瓷质材料(对地)mm729(投标人填写)有机材料(对地)810(投标人填写)表1(续)序号名 称单位标准参数值投标人保证值19相间及相对地净距(裸导体)mm300(投标人填写)20丧失运行连续性类别LSC2(投标人填写)二断路器参数1型号投标人提供(投标人填写)2灭弧室类型真空(投标人填写)3额定电流A1250(投标人填写)4主回路电阻(投标人提供)
23、(投标人填写)5温升试验电流A1.1Ir(投标人填写)6额定工频1min耐受电压断口kV118/(95)(投标人填写)对地95(投标人填写)额定雷电冲击耐受电压峰值(1.250ms)断口kV215/(185)(投标人填写)对地185(投标人填写)7额定短路开断电流交流分量有效值kA25(投标人填写)时间常数ms45(投标人填写)开断次数次30(投标人填写)首相开断系数1.5(投标人填写)8额定短路关合电流kA63(投标人填写)9额定短时耐受电流及持续时间kA/s25/4(投标人填写)10额定峰值耐受电流kA63(投标人填写)11开断时间ms60(投标人填写)12合分时间ms60(投标人填写)1
24、3分闸时间ms(投标人提供)(投标人填写)14合闸时间ms(投标人提供)(投标人填写)15重合闸无电流间隙时间ms300(投标人填写)16分、合闸平均速度分闸速度ms(投标人提供)(投标人填写)合闸速度(投标人提供)(投标人填写)17分闸不同期性ms2(投标人填写)18合闸不同期性ms2(投标人填写)19机械稳定性次真空断路器10000(投标人填写)20额定操作顺序O0.3sCO180sCO(投标人填写)21现场开合空载变压器能力空载变压器容量MVA10/20/31.5参考表6相应项填写空载励磁电流A0.515参考表6相应项填写试验电压kV40.5(投标人填写)操作顺序10O和10(CO)(投
25、标人填写)表1(续)序号名 称单位标准参数值投标人保证值22异相接地故障开断试验试验电流kA21.7(投标人填写)试验电压kV40.5(投标人填写)操作顺序O0.3sCO180sCO(投标人填写)23容性电流开合试验(试验室)试验电流A电缆:50;电容器组:400(投标人填写)试验电压kV1.440.5/(投标人填写)C1级:CC1:24O; CC2:24CO;BC1:24O;BC2:24COC1级/C2级参考表6相应项填写C2级: CC1:48O;CC2:24O和24CO;BC1:24O;BC2:80CO24操动机构型式或型号弹簧(投标人填写)操作方式三相机械联动(投标人填写)电动机电压VA
26、C 380/220参考表6相应项填写合闸操作电源额定操作电压VDC220/DC110参考表6相应项填写操作电压允许范围85%110%,30%不得动作(投标人填写)每相线圈数量只1(投标人填写)每只线圈涌流A(投标人提供)(投标人填写)每只线圈稳态电流ADC220V、2.5A或DC110V、5A参考表6相应项填写分闸操作电源额定操作电压VDC220/DC110参考表6相应项填写操作电压允许范围65%110%,30%不得动作(投标人填写)每相线圈数量只1(投标人填写)每只线圈涌电流A(投标人提供)(投标人填写)每只线圈稳态电流ADC220V、2.5A或DC110V、5A参考表6相应项填写保护类线圈
27、数量只(项目单位提供)参考表6相应项填写备用辅助触点数量对10动合,10动断(投标人填写)开断能力DC220V、2.5A或DC110V、5A参考表6相应项填写使用寿命年20(投标人填写)弹簧机构储能时间s20(投标人填写)表1(续)序号名 称单位标准参数值投标人保证值三接地开关参数1额定短时耐受电流及持续时间kA/s25/4(投标人填写)2额定峰值耐受电流kA63(投标人填写)3额定短路关合电流kA63(投标人填写)4额定短路电流关合次数次2(投标人填写)5机械稳定性次3000(投标人填写)6操动机构型式或型号电动并可手动/手动参考表6相应项填写电动机电压VAC 380/220参考表6相应项填
28、写控制电压VAC220(投标人填写)允许电压变化范围85%110%(投标人填写)备用辅助触点数量对8动合,8动断(投标人填写)开断能力DC220V、2.5A或DC110V、5A参考表6相应项填写四电流互感器参数1型式或型号电磁式(投标人填写)2绕组1额定电流比(项目单位提供)参考表6相应项填写额定负荷(项目单位提供)参考表6相应项填写准确级(项目单位提供)参考表6相应项填写绕组2额定电流比(项目单位提供)参考表6相应项填写额定负荷(项目单位提供)参考表6相应项填写准确级(项目单位提供)参考表6相应项填写绕组3额定电流比(项目单位提供)参考表6相应项填写额定负荷(项目单位提供)参考表6相应项填写
29、准确级(项目单位提供)参考表6相应项填写绕组4额定电流比(项目单位提供)参考表6相应项填写额定负荷(项目单位提供)参考表6相应项填写准确级(项目单位提供)参考表6相应项填写五电压互感器参数1型式或型号电磁式(投标人填写)2额定电压比35/:0.1/:0.1/:0.1/3(投标人填写)3准确级0.2/0.5/3P(投标人填写)4接线级别Yn/yn/yn/(投标人填写)5额定容量VA(项目单位提供)参考表6相应项填写6三相不平衡度V1(投标人填写)表1(续)序号名 称单位标准参数值投标人保证值7低压绕组1min工频耐压kV3(投标人填写)8额定电压因数1.2倍连续,1.9倍8h(投标人填写)六熔断
30、器参数1熔断器型式(项目单位提供)参考表6相应项填写2熔断器的额定电流A(项目单位提供)参考表6相应项填写3熔断器的额定短路开断电流kA(项目单位提供)参考表6相应项填写七避雷器参数1型式复合绝缘金属氧化物避雷器(投标人填写)2额定电压kV51(投标人填写)3持续运行电压kV40.8(投标人填写)4标称放电电流kA5(峰值)(投标人填写)5陡波冲击电流下残压峰值(5kA,1/3ms)kV154(投标人填写)6雷电冲击电流下残压峰值(5kA,8/20ms)kV134(投标人填写)7操作冲击电流下残压峰值(250A,30/60ms)kV114(投标人填写)8直流1mA参考电压kV73(投标人填写)
31、975%直流1mA参考电压下的泄漏电流A(投标人提供)(投标人填写)10工频参考电压(有效值)kV(投标人提供)(投标人填写)11工频参考电流(峰值)mA(投标人提供)(投标人填写)12持续电流全电流mA(投标人提供)(投标人填写)阻性电流A(投标人提供)(投标人填写)13长持续时间冲击耐受电流A400(峰值)(投标人填写)144/10s大冲击耐受电流kA65(峰值)(投标人填写)15动作负载(投标人提供)(投标人填写)16工频电压耐受时间特性(投标人提供)(投标人填写)17千伏额定电压吸收能力kJ/kV(投标人提供)(投标人填写)18压力释放能力kA/s25/0.2(投标人填写)八母线参数1
32、材质铝/铜(投标人填写)2额定电流A1250(投标人填写)3额定短时耐受电流及持续时间kA/s25/4(投标人填写)4额定峰值耐受电流kA63(投标人填写)5导体截面mm2与开关柜型式试验报告中产品的导体截面、材质一致(投标人填写)表1(续)序号名 称单位标准参数值投标人保证值九母线桥参数1材质铝/铜(投标人填写)2额定电流A(项目单位提供)参考表6相应项填写3额定短时耐受电流及持续时间kA/s25/4(投标人填写)4额定峰值耐受电流kA63(投标人填写)5导体截面mm2与开关柜型式试验报告中产品的导体截面、材质一致(投标人填写)2 项目需求部分2.1 货物需求及供货范围一览表表2 货物需求及
33、供货范围一览表序号项目单位要求投标人响应开关柜型式主要参数单位数量开关柜型号主要参数单位数量1出线柜KYN61-40.5 台12进线柜KYN61-40.5 台13母联柜4分段柜5电压互感器及避雷器柜KYN61-40.5 台16母线桥7电容器柜表2(续)序号项目单位要求投标人响应开关柜型式主要参数单位数量开关柜型号主要参数单位数量8站用变压器柜9其他35kV计量柜台1注 1. 由项目单位提供一次设备接线图。2. 由项目单位提供一次设备布置图。3. 由项目单位提供一次设备盘面布置图。2.2 必备的备品备件、专用工具和仪器仪表供货表表3 必备的备品备件、专用工具和仪器仪表供货表序号名 称项目单位要求
34、投标人响应规 格单位数量规 格单位数量12342.3 图纸资料提交单位表4 卖方提交的图纸资料及其接收单位提交图纸资料名称接收图纸单位名称、地址、邮编、电话提交份数提交时间图纸类(设计单位)邮编:电话:10合同后10天安装使用说明书试验报告其他资料图纸类(项目单位)10合同后10天安装使用说明书试验报告其他资料2.4 工程概况2.4.1 项目名称: 35kV变电站改造工程2.4.2 项目单位:变电站2.4.3 工程规模:35kV开关柜更换2.4.4 工程地址:变电站2.4.5 交通、运输:公路2.4.6 工程布置:户内布置2.4.7 电气主接线:35kV单母线2.4.8 电力系统情况:1)系统
35、标称电压:35kV。2)系统最高电压:40.5kV。3)系统额定频率:50 Hz。4)安装地点:户内。2.5 使用条件表5 使 用 条 件 表序号名 称单位标准参数值投标人保证值1周围空气温度最高气温+40(投标人填写)最低气温-25(投标人填写)最大日温差K25(投标人填写)2海拔m1000(投标人填写)3湿度日相对湿度平均值%95(投标人填写)月相对湿度平均值90(投标人填写)4耐受地震能力(水平加速度)g0.2(投标人填写)5由于主回路中的开合操作在辅助和控制回路上所感应的共模电压的幅值kV1.6(投标人填写)注 表中“标准参数值”为正常使用条件,项目单位可根据工程实际使用条件进行修改。
36、2.6 项目单位可选技术参数表项目单位应根据实际工程情况认真填写相应的技术参数响应表。表6 项目单位可选技术参数表(项目单位填写)序号名 称单位标准参数值项目单位要求值一开关柜共用参数1供电电源控制回路VDC220 / DC110DC220辅助回路VAC380/ AC220AC2202燃弧持续时间S0.30.50.30.53设备尺寸单台开关柜整体尺寸(长宽高)mm(280014002600)/(280012002600)(280012002600)二断路器参数1现场开合空载变压器能力空载变压器容量MVA10/20/31.531.5空载励磁电流A0.5150.5152容性电流开合试验(试验室)C
37、1级: CC1:24O;CC2:24CO;BC1:24O;BC2:24COC1级/C2级C2级表6(续)序号名 称单位标准参数值项目单位要求值2容性电流开合试验(试验室)C2级: CC1:48O;CC2:24O和24CO;BC1:24O;BC2:80COC1级/C2级C2级3电动机电压VAC 380/220AC 220合闸操作电源额定操作电压VDC220/DC110DC220每只线圈稳态电流ADC220V、2.5A或DC110V、5ADC220V、2.5A分闸操作电源额定操作电压VDC220/DC110DC220每只线圈稳态电流ADC220V、2.5A或DC110V、5ADC220V、2.5A
38、保护类线圈数量只(项目单位提供)3备用辅助触点开断能力DC220V、2.5A或DC110V、5ADC220V、2.5A三接地开关参数1操动机构型式或型号电动并可手动/手动电动并可手动电动机电压VAC 380/220AC220备用辅助触点开断能力DC220V、2.5A或DC110V、5ADC220V、2.5A四电流互感器参数1绕组1额定电流比2001250/1(5)200/5额定负荷VA15/20/3030准确级10P10/10P2010P20绕组2额定电流比2001250/1(5)200/5额定负荷VA15/20/3030准确级10P10/10P2010P20绕组4额定电流比2001250/1(5)200/5额定负荷VA15/20/3030准确级0.50.5绕组5额定电流比2001250/1(5)200/5额定负荷VA15/20/3030准确级0.2S0.2S表6(续)序号名 称单位标准参数值项目单位要求值五电压互感器参数1额定容量VA35/0.1/0.1KV 100VA六熔断器参数1熔断器型式RN2-35 0.5A2熔断器的额定电流A0.5A3熔断器的额定短路开断电流kA25KA七母线桥参数1额定电流A(项目单位提供)八电容器柜参数1投切电容器组容
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 江苏省常州市天宁区正衡中学2026届中考语文试题冲刺卷(一)含解析
- 四川中江县春季联考2026年初三下学期第十四次周考数学试题(B)试卷含解析
- 产品经理用户增长与运营策略
- 企业绩效评估及考核工具箱
- 产品质量功能达标及服务承诺书范文9篇
- 药品质量与安全保障承诺书(7篇)
- 个人成长与承诺书(5篇)
- 财务报告自动化模板
- 汽车维修技师汽车电路诊断速查手册
- 内容营销经理SEO流量管理方案
- 2025年内蒙古党校在职研究生招生考试(政治理论)历年参考题库含答案详解(5套)
- 人教版(2024)七年级下册Unit2 No RulesNo Order 单元检测卷(含答案)
- 医院食堂装修报价方案(3篇)
- 2025政府采购评审专家考试试题库(含答案)
- 医卫单招考试题库及答案
- 农艺工培训:植物与植物生理
- 血透患者低血压护理查房
- CJ/T 407-2012城市轨道交通基于通信的列车自动控制系统技术要求
- TCACM1315-2019中医内科临床诊疗指南阿尔茨海默病
- 农田转租合同协议书范本
- TSG Z7002-2022特种设备检测机构核准规则
评论
0/150
提交评论