调试指导故障分析.ppt_第1页
调试指导故障分析.ppt_第2页
调试指导故障分析.ppt_第3页
调试指导故障分析.ppt_第4页
调试指导故障分析.ppt_第5页
已阅读5页,还剩58页未读 继续免费阅读

下载本文档

版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领

文档简介

1、Acs 800和600 commision guide and thouble shootingacs 800/600调试准则和错误分析,ABB北京传记传输系统有限公司,Content内容,1 .Drive units fault驱动器单元故障2.ff,Drive units fault驱动器单元故障,DC over voltage 1,possible reason deceleration time is too short。减速时间太短。action 1 set longer ramp time or use brake unit。设定较长的灯时间或使用制动单元。2 use coasti

2、ng stop to stop function(if applicable)。如果允许,请使用自由停车方法。3 resistance of the braking resistoris too high .制动电阻的电阻太高。DC over voltage 2,possible reason parameter 20.05 over voltage controller disabled and there is no brake unit or TSU/ISU。没有中断单元或tsu,action disable controller only when using brake unit o

3、r TSU/ISU。只有在使用制动单元或tsu/ISU时,才能关闭过电压控制器。DC over voltage 3,possible reason supply voltage is too high。电源供应电压太高。action check mains for static or transient over voltage。检查主电源供应设备的静态或瞬态过电压。DC over voltage 4,possible reason faulty braking chopper。制动斩波故障。action check braking chopper and braking resistors。

4、检查制动斩波和制动电阻。DC over voltage 5,possible reason internal fault。内部错误。Action Replace xINT-board。更换xINT主板。DC over voltage 6,possible reason earth fault in it(floating network)。浮动网络(it)接地错误。action check there is no earth fault in supply。确认电源供应器没有接地错误。DC over voltage 7,possible reason incorrect inverter ty

5、pe。变频器型号无效。将action compare the rating plate of the drive and configuration in the SW from CDP panel(drive)变速器单元的额定铭牌与软件的参数配置进行比较。DC over voltage 8,possible reason EMC boards are connected to IT network . EMC主板已连接到IT浮动网络。action disconnect common mode capacitors from the gnd。从gnd中卸下公共模式电容器。note : see

6、modifications to the RFI filtering when used in the it networks,DC under voltage 1,possible reason too low input voltage,possible reason too low input voltage验证输入保险丝和oesa是否已关闭。2 measure the input and DC voltage in the stop,start and running(with multimeter or from actual signals)。停止、启动和运行过程中的输入和直流电压

7、(3Check phase voltage of the supply)。确定电源供应设备的相位电压。DC under voltage 2,possible reason incorrect inverter type。反相器类型无效。将action compare the rating plate of the drive and configuration in the SW from CDP panel(drive)变速器单元的额定铭牌与软件的参数配置进行比较。note : see rmio configuration instructions,DC under voltage 3,po

8、ssible reason internal fault。内部故障。action 1 check cabling between AINP and rectifier bridges。检查ainp主板和整流桥之间的电缆连接。2 check the cable between DC-bus and AINT-board。检查aint主板和dc-bus之间的电缆连接。3Replace AINP-board。更换AINP主板。4Replace xINT-board。更换xINT主板。earth fault 1,possible reason motor cable or motor is damag

9、ed。马达电缆或马达损坏。action 1 megger the motor and motor cable。使用高电阻表或摇杆检测马达或马达电缆。2 disconnect motor cables and run the drive in scalar control if the drive does not trip,the drive is ok。断开电机电缆与变频器的连接,在标量模式下运行变频器。如果变频器不能跳闸,请参阅earth fault 2,possible reason long motor cables or high stray capacitance to the g

10、round。太长的电动机电缆或太高的接地离散容量。action 1 check earth fault trip level。检查接地故障跳闸级别。2Use output chokes。使用输出reactor。note : maximum motor cable length see ACS 600/ACS 800 du/dt filter selection guide and noch xxxx,aoch XXX du/dt filters instantance功率因数校正电容器或浪涌吸收器。action check there are no power factor correctio

11、n capacitor or surge absorbers in the motor cable。确保马达电缆没有功率因数修正电容器或浪涌吸收器。earthfault 4,possible reason internal fault。内部错误。action 1see ACS 600 earth fault protection service manual . 2 replace xINT-board。更换xint主板。3Replace Current Transducer。更换电流互感器。4Replace xPBU-board if used。更换xPBU主板。5 replace all

12、optic fibres between AINTs and APBU。更换aints和apbu之间的光纤。FLT (x _ x),possible reason (f1 _ 4).7)flash memory;闪存。(F2 _ x)处理器或内存。处理器或内存。action replace RMIO-board,inform support line。更换rmio板。I/O communication fault 1 (1),possible reason a communication error has occurred on the I/O link。I/o链路中出现通信错误。actio

13、n 1 check the connections of the fibre optic cables on the I/O link。在I/o链路上验证光纤连接。2 check a corresponden ce between parameter settings and HW configuration on the I/O link(所有I/O模块)。I/o链路上所有模块的硬件配置,I/O communication fault 1 (2),possible reason a communication error has occurred on the I/O link。I/o链路中

14、出现通信错误。action 3 check a correspondence between parameter settings and HW configuration、When pulse encoder module(ntac)is connected to当脉冲编码器介面模块(NTAC)连接到CH1时,验证硬件配置是否与参数设置相对应。(如果脉冲编码器介面模块连接至CH1,则应将参数70.03设置为4Mbits。I/o communication fault 2、possible reason electro magnetic interference。电磁干扰。action 1 c

15、heck for proper earthing of the equipment。验证设备是否正确接地。2 check for highly e missive components near by。确认附近是否有高辐射元素。I/o communication fault 3、possible reason internal fault。内部故障。Action 1Replace option module。更换可选模块。2 replace the fibre optic cables on the I/O link。在I/o链路上更换光纤。3Replace RDCO模块。更换RDCO模块。4

16、Replace AIMA-board。更换AIMA主板。5Replace RMIO-board。更换RMIO板。no communication (1.8) 1,possible reason(8)=panel link between rmio-board and control panel is faulty,actioncheck the panel link connections检查控制盘连接。no communication (1.8) 2,possible reason(4)=panel type is not compatible with the version of the

17、 drive application,actioncheck the panel type确定车轮模型和驱动应用节目版本。no communication (1.8) 3,possible reason(1-4)=internal fault。内部失败。Action 1Replace RMIO-board。更换RMIO板。2Replace CDP 312R Panel。更换CDP 312R滚轮。no communication (1.8) 4,possible reason(3)=internal fault。内部失败。action 1 check the external 24 VDC supply for voltage dips。检查外部24 VDC电源供应器的压力降。2 check setting of par . 16.09 ctrl bo

温馨提示

  • 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
  • 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
  • 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
  • 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
  • 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
  • 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
  • 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。

评论

0/150

提交评论