1、NPI PROGRAM MANAGEMENT 新产品导入程序管理,INDEX,Introduction for NPI,The Focus for NPI,What is customers most concern during NPI process?,NPI Process,NPI is becoming more and more important in most manufacturing companies. It is the first step to win customer confidence on both production capability and busi
2、ness management.,Introduction,Full Name of NPI: New Product Introduction,CONTENT,NPI locates between design and mass production and it is a verifying process to product design and production.,How to get profit from the NPI business;,The Focus for NPI,Standing as manufacturing service provider, we ne
3、ed focus on followings:,How to manage the NPI business;,How to come out a proper NPI report to customer to get customer approval;,How to transfer the NPI to factory to implement mass production smoothly;,For the supplier: a Quality b Capacity,What is customers most concern during NPI process?,For th
4、e product: a Enough training to operators and engineers b Product requirement are clear and implemented solidly c Process setup adequately d Process evaluation is ready,-The practice and lesson learnt in NPI phase are most important as customer is prefer to solve all problems which are related to de
5、sign and system fault at this phase, not mass production phase.,Pre-study Phase,NPI Process,Planning Phase,Execution Phase,Trial-run Phase,Ramp-up Phase,Transfer Phase,Pre-study Phase,-Sales manager will call related people to review the sales offer, forecast, project budget and agreement.At the sam
6、e time,product engineers need to ask for the informations such as product specifics and production requirement from PM or customer to know the prouct in advance.,Planning Phase,-This phase is very important to whole program. PM should have a detailed list to review one by one to ensure all informati
7、on are ready and all plan have responsible people and deadline.,a Project milestone(Schedule) b Project organization(Team) -Process Engineer/SMT Engineer/Diagnostic Engineer/Quality Engineer/Program Manager / Sales/Buyer/Planner/PDM(product document manager)/Finance etc. c Investment plan -PM or hig
8、her hierarchy to define the investment. The investment includes equipment cost, tooling & jig & fixture cost, training cost and renovation cost. Most cost has been put into quotation and now we need control it by items.,d Facility plan. PM should call production manager, WH manager, facility manager
9、 to define the location: -which SMT line can be adequate use? -where to allocate the production line? -where to store the finished goods ?,e Material management plan. -We need Material Manager to discuss the purchasing plan and delivery plan if consigned material there is. -This plan is very serious
10、 to make sure there is no material shortage. -Shortage is very easy occurred on three cases: single source DOS (days of supply) too long bad BOM usage For this case, we can use safe stock to control.,f Quality plan. -Quality dept. should provide quality control plan, sub-supplier management plan, FM
11、EA, environment report (if applicable).,g Manufacturing plan: -Production manager should report the manpower allocation and make the training plan to operators. -IE should finished the layout plan and standard time calculation, based on the volume, shift arrangement, operator quantity, line layout,
12、tooling & equipment balance, technical people support. -Test engineer should also feedback the running status to PM. h Risk management plan: -Not all potential problems would occur, but if occur, some plan and work may going to “death”.,i ECR/ECO plan: -PDM and product engineer should control this p
13、lan. PM have to concern about once the engineering change would cause cost change. So, to define an ECR/ECO handling procedure and cost control process are necessary.,j CPM analysis and back-up solution consideration: -CPM:Critical Path Method -When all plans were ready, PM should have a review to a
14、ll these activities as a by-stage come-out. We title the review meeting as “planning review” or “start-up review”. The purpose is to make sure all activities are under control and running as what we expected.,-Following here are some Items which are critical and need high attention in the review mee
15、ting:,General Information: -customer milestone -capacity -volume -dedicated project personnel Supply Chain Management: -the focus is on procurement management and component coding (or BOM coding). Before the meeting, Material people should review the BOM and check out which ones are critical compone
16、nts. The critical component mainly means supplier-controlled market and/or high-value unique component.,Production Line Setting: -SMT package (Gerber, X-Y, PCN drawing) -assembly process -packing requirement (domestic and export) -traceability -testing software and hardware -tooling preparation -del
17、ivery method -cosmetic specification and checking method -plant layout -operator training and shift arrangement,Quality: -control plan and flow chart, -environment audit -process audit -GR&R -golden sample -trial run premises -process qualification requirement Other Problem: -finance -logistics -sec
18、urity,Execution phase,As soon as customer gives go signal, the NPI is promoted into “executive phase” and a checklist need to be made.,Production documents:,a Process Flow-chart b SOP (or MI/WI) c Test Instruction d Final Inspection Instruction e Packing Design and Instruction.,a PFMEA b Control Pla
19、n c GR&R d Capability Study e PQP Plan.,Production documents:,AVL(AML) and BOM:,Customer Specification & Golden Sample (if applicable):,a Make sure the latest quality and product specification was got, and renewal of test software. b Quality engineer should transfer the specification into internal f
20、ormat. c Testing engineer should have a software upgrade list. d Final Inspection Instruction. e Different document version may be applied to different product version.,CapEx: -Check that approved CapEx is available.,Trial-run Phase,-Customer released formal PO# and confirmed price, we start trial r
21、un. The output is trial run report from engineer team. The result is trial run sample approved by customer and give ramp-up signal. -The trial run report should cover the processes from SMT to packing and shipment. We should raise action plan for all critical problems and potentials necessarily. Aft
22、er trial run, sample would be sent to customer based on request.,-After trial run, sample would be sent to customer based on request. -In most cases, the whole NPI can be lengthened or shortened due to many factors, and it is also naturally have direct correlation to customer demand.,functionality,c
23、omplexity,requirement,predicted volume,There are 4 basic factors:,Ramp-up Phase,-The trial run sample was approved by customer and “go-signal” was released, it means we can move to “ramp-up phase” successfully. -This is the final phase for NPI. We must check what is lost or need further improvement
24、for factory production. -In fact, customer would give updated forecast and MRP plan now.Planner can make production schedule based on that.,Transfer Phase,-When customer approved the Ramp-up plan, NPI PM has to call a meeting with factory steering to transfer the project and report to customer about the transfer. -prepare a completed NPI report to factory members to make the transfer successful. - KPI (Key Performance Indicators) KPI
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026陕西西安市西北工业大学航天学院空天飞行技术研究所招聘1人参考题库及参考答案详解(完整版)
- 2026年甘肃省张掖市直事业单位引进高层次人才11人(第二批)参考题库附参考答案详解【突破训练】
- 2026安徽安庆市中医医院劳务派遣工作人员招聘1人模拟试卷附答案详解(考试直接用)
- 2026广西北海市不动产登记中心招聘临聘人员4人备考题库及完整答案详解(夺冠)
- 2026年聊城莘县第一中学招聘高中教师笔试题库含答案详解【综合题】
- 2026石家庄市永通企业管理咨询有限公司招聘3人备考题库及参考答案详解(考试直接用)
- 2026河南漯河市舞阳县章化镇人员调解委员会招聘专职人民调解员1人备考题库【学生专用】附答案详解
- 承接混凝土修补方案范本
- 四川绵阳安州高新技术产业园区2026年公开招聘园区产业发展服务专员(第二批)参考题库附参考答案详解【B卷】
- 2026云南国土学院后勤服务有限责任公司招聘7人备考题库附答案详解【基础题】
- 【新教材】统编版(2024)八年级下册历史期中复习:小论文 专项练习题(含答案解析)
- 雨课堂学堂在线学堂云《学术英语:研究论文写作与演讲(北京航空航天)》单元测试考核答案
- 娄底市2026国家电网招聘考试-电工类综合能力试题(含答案)
- 《油气输送管道工程地质灾害防治设计规范》SYT 7040-2021
- 2026年医保结算流程培训课件
- 雨课堂学堂在线学堂云《观影之道:影视艺术赏析(南昌)》单元测试考核答案
- 宁德时代shl测评题库
- 服装零售店店务管理手册(标准版)
- (2025年)福建辅导员面试试题真题及答案
- 户内GIS无尘化安装典型施工方法
- 小学科学实验器材清单及使用规范
评论
0/150
提交评论