1、Introduction,Operations Analysis and Improvement 2009 Spring Dr. Tai-Yue Wang Industrial and Information Management Department National Cheng Kung University,Presentation,Throughput or lead time are directly affected by the where and how the processing and storage resources are located in the factor
2、y. Plant layout is an activity that all companies are forced to deal with sooner or later. It is important to be familiar with the methodologies used to carry out these tasks.,Presentation,Cellular layouts - where labor and machines are grouped in cells - will be explained in depth in the following
3、chapter.,Production Systems Design,Introduction,Factory layout improvements typically occur more than one time during the factorys life. The study of plant layouts seeks the optimal location for all of the production resources. Tries to ensure that the economic impact of the project on the enterpris
4、e will be as positive as possible. New plant layout must be as safe as possible and satisfactory for the employees. It seems obvious that the optimal solution will be unreachable or change routinely. Commitment between all the aspects is achieved.,Signs and reasons for a new layout,Location change.
5、Reasons to suggest a change of location of the factory. Location has become inadequate or antiquated. Factory expansion is impossible.,Signs and reasons for a new layout,Location change. Layout can be different if the company chooses a new location by constructing a new building, versus utilizing an
6、 existing facility. New building construction can allow for an ideal layout because building functionality is the principle focus of the building design. Use of the factory floor space should be better utilized.,Signs and reasons for a new layout,Purchase new equipment New needs as well as technolog
7、y improvements form the basis of machinery purchase Finding the best location for the purchased equipment can become a critical issue in making a “system” perform as intended.,Signs and reasons for a new layout,Purchase new equipment Newly purchased incremental equipment is generally placed in free
8、space available. In some cases it is necessary to move machines to create space. In other cases the new machine is located in a place that promotes system efficiency.,Signs and reasons for a new layout,Equipment set up is typically done once, while the materials flow is a continuing process. The ana
9、lysis of this material flow can in most cases be economically formulated.,Signs and reasons for a new layout,Problems with materials flow This problem is generally derived from a problem previously solved. Placing new equipment in available space in the plant The initial set-up costs decrease, but o
10、ther problems arise. Materials flow can be adversely affected by introducing additional equipment.,Signs and reasons for a new layout,High work-in-process (WIP). A good policy or layout in a given period of time may not always produce good results forever. A measure of change in the company is the a
11、mount of partially completed products (work-in-process). This should not be confused with a temporary situation caused by a momentary increase in demand or stock outages and/or surges.,Signs and reasons for a new layout,Slow changes in product variability can hide the negative effects of the excessi
12、ve work-in-process (WIP).,One-piece flow,Before we begin exploring layout analysis tools, it is important to clarify the definition of production and transfer batch even though both sizes are normally the same.,One-piece flow,Production batch. Number of products included in the customer order. Trans
13、fer batch (unit load). Amount of units that flows from one machine to the next.,One-piece flow,Work-in-process decreases with a reduction in the transfer batch size.,One-piece flow,Advantages of reducing the transfer batch Production feedback is faster. Lead time decreases. A reduction in the transf
14、er batch increases the material handling between sections.,One-piece flow,The ideal transfer lot size is called continuous one-piece flow. Normally, a container size is considered unit load flow. For example, a “1000-screws flow”, can be used as “unit load flow”.,One-piece flow,One-piece-flow elimin
15、ates most of the causes and effects outlined in the previous section. It is one of the Just-in-time tools. To come closer to an ideal one-piece-flow, the material flow has to be minimized or eliminated. If this is not possible, then the machines should be located as close together as possible.,One-p
16、iece flow,In order to improve the material flow, it is typically necessary to analyze and change the companys layout.,Main types of industrial companies,In an open-market, there exists a multitude of different products. food, cars, computers, bricks, cement, ships,. Each product has a specific manuf
17、acturing process. Analysis is conducted based on similarities Cars and washing machines? yogurt and soap?,Main types of industrial companies,The grouping is based on the type of production facilities that the companies uses. Industrial companies can be grouped into four sectors. Primary, Secondary,
18、Tertiary and Service Sector. Secondary Sector (Process Industry and Consumption Industry). Tertiary Sector (Production and Assembly factories).,Process industry,Process focused industries The manufacture of the product dictates the equipment and product flow. Paper, wood, cement, painting and fabric
19、s manufacturers,.,Process industry,Consumer goods will also be grouped into this type Quality or purity measures will be much higher. Yogurts, ice creams, drinks, Pharmaceutical and cleaning products.,Process industry,Four main steps Raw materials preparation Received in bulk and storage in large wa
20、rehouses or silos. Product mixing is carried out in hoppers or in smaller drums. Treatment filter, dry, separate,.,Process industry,Finishing Restore some properties (Metals). Superficial treatments. Polishing or painting. Bottling or packaging Bottling or packing lines.,Assembly companies,Companies
21、 that exclusively assemble final products. Cars, televisions, microwaves. Their components are purchased from external companies.,Assembly companies,Some processing operations are also carried out internal to the factory. They are not profitable to subcontract. Sheet cutting. Welding. Plastic inject
22、ion molding. Painting.,Manufacturing companies,Companies that manufacture component parts do not belong to any of the previous groups Forges Plastic injection machines Presses CNC machines.,Manufacturing companies,Factory layout depends on the product type and volume to be manufactured Later this wi
23、ll be analyzed in more detail,Layout types,There are numerous classifications of industry according to their layout. We will use four basic layout groupings or classifications. The grouping is primarily the result of the material flow in the production plant Fixed position layout Process layout Prod
24、uct layout Cellular or combination layout,Fixed position layout,The product does not move throughout the production process, the needed resources do. Ships, buildings, trains, Products with short or immediate needs Milling center, presses,. Historically this layout was also used for custom car produ
25、ction,Process layout,Machines are grouped into departments or stations according to the operation that they perform. Presses - pressing department Lathes - lathes department,Process layout,Used in companies that manufacture by orders. Specialty parts or components. A small job shop that makes unique
26、 dies or fixtures Products that are made in very small batches,Process layout. Advantages,The flexibility of products (almost any part that fits within the volumetric boundaries of the machines) is possible. An in depth understanding of a specific process can be obtained. Some tooling and fixtures c
27、an be shared.,Process layout. Disadvantages,The spaghetti flow is difficult to manage and control. There is usually a lot of inventory in front of each machine.,Process layout. Disadvantages,Set up is usually expensive and time consuming. Material handling times are large. It is difficult to automat
28、e these types of systems.,Product layout,Machines are grouped according to the product manufacturing sequence. These layouts are called manufacturing or assembly lines. High volume component parts are normally produced using a product layout.,Product layout,Assembly companies normally use this type
29、of layout, especially in the automotive sector.,Product layout,The layout change carried out by Henry Ford drastically reduced the car production lead time. Some companies are able to manufacture an automobile every 40 seconds.,Product layout. Advantages,Large batches can be produced inexpensively M
30、aterial handling is minimal In-process materials are minimized It is easy to control these systems Automation is more achievable and justifiable,Product layout. Disadvantages,They are inflexible, in that only one or very few products can be produced on them. Set-up time for these systems is very lar
31、ge. Duplicate tooling is required to replace worn tooling so that maintenance can be minimized.,Cellular or combination layouts,Some companies can not be classified exclusively by one of the previous layout types. Large product manufacturing industries (airplanes or presses) have opted for modulariz
32、ation. Different modules are produced in different lines and assembled as subsets.,Cellular or combination layouts,Dismantling sections and creating manufacturing cells to accommodate demand. Special screws manufactures. Cellular layout. Share the critical resource. High cost of the resources. Combi
33、nation layout between product and process layouts.,Cellular or combination layouts,Common first phase and different assembly lines to elaborate the final product. Appliances manufactures. Plastic injection and presses sections, combined with assembly lines grouped by product families.,Characteristic
34、 of the traditional layouts,Layout design methodology,These next steps are applicable to most of the possible layout problems, they are oriented mainly for a general layout analysis. Step 1. Formulate the problem. Define what is the main objective of the study. Including a new machine? Modifying the
35、 existing building?,Layout design methodology,Step 2. Analysis of the problem. Can be carried out in a systematic way. Richard Muther in his now classic book Practical Plant Layout presented 8 factors to consider for facilities layout. These factors will be described in the tools section.,Layout des
36、ign methodology,Step 3. Search for alternatives. The analysis of the 8 Muthers factors enables engineers to define the problem and properly align the solution to the problem. It is important to take into account three practical principles. First the whole and then the details. First the ideal soluti
37、on and then the practical one. Brainstorming.,Layout design methodology,Step 3. Search for alternatives. First the whole and then the details. Giving priority to the general area or total space shared and then to each one of the specific areas. Layered planes are developed to characterize the situat
38、ion.,Layout design methodology,Step 3. Search for alternatives. First the ideal solution and then the practical one. The ideal solution is difficult to reach. The good solutions can be more easily developed. A more particle approach is more worthwhile so as not to waste time and effort analyzing thi
39、s problem in depth.,Layout design methodology,Step 3. Search for alternatives. Brainstorming. The “creation of ideas” with not a single solution being rejected. Consider all the ideas without criticizing them. Being critical at this point can hinder the creativity process. It would not be the first
40、time that, from a seemingly crazy idea, brilliant solutions are obtained. It is also important to remember that factories have a third poorly used dimension. The height or overhead space.,Layout design methodology,Step 4. Choose the right solution. Choose the solution that fits best among the soluti
41、ons that have been proposed in the previous step. Each one of the solutions should be evaluated according to a specific set of criteria. Ranking each alternative from 0 to 10 according to the established criteria.,Layout design methodology,Evaluate each alternative from an economical standpoint. The
42、 simplest solution (between those which have received good ranking) will always be the best choice.,Layout design methodology,Step 5. Specification of the solution. The accepted solution will need to be fully developed. Take care of safety measures in order to avoid possible future industrial accide
43、nts. Occupational Health and Safety Administration (OHSA) regulations and the Labor Risks Prevention Law.,Layout design methodology,Itemize all details for the plan, budgets and schedule for the implementation of the solution. Demonstrate quantitatively that the outlined solution will provide benefi
44、ts when compared to the current situation.,Layout design methodology,Step 6. Design cycle. Includes planning for modifications that arise due to problems that appear while adopting a solution. Budget deviations, problems in the plant installations. At the end of the design process, the plant should
45、work more efficiently. It is always worthwhile to check to see if the adopted solution works as expected.,Tools for layout study. Muthers 8 factors,By analyzing the following 8 factors, it is possible to determine the main layout restrictions and requirements. Choose the best layout from a set of pr
46、oposed solutions.,Tools for layout study. Muthers 8 factors,Muthers 8 factors. Material factor. Machinery factor. Labor factor. Movement factor. Wait factor. Service factor. Building factor. Change factor.,Muthers 8 factors. Material factor,This factor does not cover the study of the materials that
47、are utilized to manufacture the product. The purpose of this factor is to become familiar with the different production steps that are needed to manufacture the article. Analyze how the material is transformed from raw material to a final product. Should be studied without considering the relative l
48、ocation of each process in the factory.,Muthers 8 factors. Material factor,This factor helps to understand the company technology and to know the company range of products.,Muthers 8 factors. Material factor,The machine types and the existing number of machines on the factory floor. Their principle
49、dimensions in case this becomes a critical constraint.,Muthers 8 factors. Material factor,Analyze the operating conditions so as to avoid putting incompatible machines together. Vibrations, temperature, etc. A heavy sheet metal press and a precision coordinate measurement machine are not very compat
50、ible.,The staff related with the production department should be counted. Covering machine operators to division heads. Material handling and maintenance operator input is important.,Muthers 8 factors. Labor factor,It is recommended to use worker-machine diagrams (a tool that will be explained in a
51、subsequent chapter). Discovery of the operations that the worker carries out on the machine and the relative disposition of the elements in the working area to simplify the worker tasks.,Muthers 8 factors. Labor factor,Muthers 8 factors. Movement factor,Analyzes the materials flow between working ce
52、nters. This flow does not add value to the product. As much handling as possible should be eliminated. Completely eliminating movement is an Utopian. There are mainly two tools to analyze the movement between machines. The flow process chart. Transfer matrix.,Flow process chart. Represents, in a gra
53、phic way, the path and the actions carried out on the product. Five standard symbols are used. It is possible to combine two or more of these actions.,Muthers 8 factors. Movement factor,Circle - Operation. Arrow - Transport. Reversed triangle - storage. Letter D - a wait or delay. Square - Inspectio
54、n.,Muthers 8 factors. Movement factor,Flow process chart. Using these symbols as tools, movement improvements can be envisaged and advantages quantified.,Muthers 8 factors. Movement factor,Transfer matrix A matrix representation of the work flow Shows the fraction of works that flows from a section
55、to all the others including the RM and FP warehouses. Considers the total amount of products that enter in a work center The fraction moving to other work centers is calculated. This is distributed fractionally between the other sections.,Muthers 8 factors. Movement factor,Transfer matrix. Shows the
56、 volume of different products that flows between working centers. It does not indicate how heavy they are, or the size of the products.,Muthers 8 factors. Movement factor,It is possible to use the same matrix concept but with a different perspective. Factors such as the transferred weight or the num
57、ber of routes executed. These matrixes will help to make the decision of the relative location of the departments in the factory plant,Muthers 8 factors. Movement factor,Muthers 8 factors. Wait factor,This factor covers the study of the three main warehouses Raw materials, work-in-process and final
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- 2026年地方碳排放总量和强度指标分解落实方案模板
- 2026届湖北省马坪镇中学心中学高中毕业班阶段性测试(四)化学试题含解析
- 2026年AI医疗数据安全隐私合规授权机制建设
- 2026年大湾区多层次轨道交通互联互通与便捷换乘一体化设计指南
- 2026年煤炭应急储备基地建设与运营管理模式创新方案
- 服务热线服务质量评估体系
- 京东分拣系统升级与效率提高
- 金融风控模型构建关键因素剖析
- 银行风险管理部工作计划及执行方案
- 红星美凯龙家居顾问面试要点与策略
- TCPA 005-2024 星级品质 婴儿纸尿裤
- 桩基承载力优化设计研究
- DJ公主岗位职责
- 多联机安装全过程经典技术指导手册
- 龙虎山正一日诵早晚课
- 排球基础理论 【核心知识精讲精析】 高一上学期体育与健康人教版必修第一册
- 医院课件:《规范医疗服务收费行为培训》
- YY/T 1836-2021呼吸道病毒多重核酸检测试剂盒
- GB/T 32291-2015高压超高压安全阀离线校验与评定
- 煤矿掘进顶板管理
- 邹申写作教程Units-课件
评论
0/150
提交评论