版权说明:本文档由用户提供并上传,收益归属内容提供方,若内容存在侵权,请进行举报或认领
文档简介
1、Kaizen Events Workshop,Client Training Workshop,August 2003,CONFIDENTIAL,This report is solely for the use of client personnel. No part of it may be circulated, quoted, or reproduced for distribution outside the client organization without prior written approval from McKinsey it is not a complete re
2、cord of the discussion.,1,KAIZEN EVENTS TRAINING,Objectives Background they have the following elements:,A formal schedule includes kickoff and final presentation to management as well as daily team leader updates,The objectives are defined for a focused area to force the team to stretch beyond thei
3、r comfort zone (e.g., 25% productivity gain, 50% space reduction, 30% inventory reduction),A kaizen event is planned to last 3-4 days, plus time to complete follow-up items (30-day plan),Team members are full time for the duration of the kaizen event; they are not expected to perform their normal jo
4、bs during the event,5,WHAT IS A KAIZEN EVENT (CONTINUED),“Kaizen” is a Japanese term that means small, incremental, continuous improvement. A kaizen program, or continuous-improvement program, can involve multiple approaches to achieve improvements, including its namesake, the kaizen event. These ap
5、proaches systematically push an organization toward a state of Lean Production. A kaizen event is a rigid methodology to focus improvement activities by promoting ownership, incremental change, and problem-solving skills. It rapidly energizes a select group of employees, typically attacking a specif
6、ic problem within a compressed period of time. The specific problems to be tackled within a kaizen event are strategically chosen to support a companys business objectives. For best applicability of the kaizen event approach, the organization should define and prioritize the areas that need improvem
7、ent. You should identify small problems with significant short-term or long-term impact.,*Footnote Source:Source,6,OVERACHING THEMES OF KAIZEN EVENTS,Complete and thorough elimination of waste to reduce the timeline from order to delivery Create only what is needed, when it is needed, in the amount
8、needed Creativity before capital “Where there is no standard there can be no kaizen” Taiichi Ohno,*Footnote Source:Source,7,Announce event Identify team Set goals Document current process and performance Train kaizen participants,Pre-paration,Analysis,Brain-storming,Implementation,KAIZEN EVENT PHASE
9、S,Kaizen event,VP or GM introduces team Team leader presents kaizen activity worksheet VP or GM motivates team with closing comments,Learn process Time operations,Generate ideas Make change/ implement Standardize,Walk management through area Present kaizen learnings and implemen-tations (before vs.
10、after performance) Review 30-day follow-up plan,Measure performance Meet to assure completion of 30-day follow-up plan,8,TIMETABLE FOR AN EVENT,Monday,Tuesday,Wednesday,7:00 a.m. 3:00 p.m. 6:00, Team training Review agenda and logistics Review goals and objectives What is kaizen Lean manufacturing p
11、rinciples Kickoff Project area overview Walk the floor Review data Confirm current state of process and performance Quantify performance gap and savings potential Review standards and customer specs List concerns and improvement opportunities Create to dos for Tuesday Wrap up,Complete to do from pre
12、vious day Determine root causes and brainstorm countermeasures Develop trials: New layout New work methods Conduct trials Monitor results Summarize results and concerns Brainstorm and implement countermeasures Define performance measures for area and implement Team leader update to plant manager Tea
13、m continues activities Create to dos for Wednesday Wrap up Major layout changes Build tables, racks, workstation configuration,Prepare for the day Complete to dos from previous day Continue trials Summarize results and concerns Brainstorm and implement countermeasures Monitor results Quantify % perf
14、ormance gap obtained and annual savings Document standard work Team leader update to plant manager Create to dos for Thursday Wrap up,1:00 p.m. 3:00 3:30,7:00 a.m. 3:00 p.m. 6:00 Night,7:00 a.m. 10:00,Complete to dos Monitor results Prepare presentation Document remaining action items as 30-day foll
15、ow up Management presentation Q others to learn, implement, and promote improvements and process,Team leader,Facilitator,Kaizen team members,10,KAIZEN EVENT TRAINING,Objectives Background other employees want to become a part of the efforts Behavioral and cultural changes are more difficult to achie
16、ve than operational changes, but they make improvement sustainable,12,PRODUCTION SYSTEM ELEMENTS TO ACHIEVE IMPACT,Standardized operations Man/machine separation,SAFETY(People),Line stop and call Poka-yoke Root-cause problem solving Plant-floor problem solving TPM OEE,QUALITY(Jidoka),Continuous flow
17、 Takt time Line balance Cell design Quick changeover Pull systems Level scheduling,DELIVERY (JIT Manufacturing),5S - workplace organization 8 types of waste Visual management,COST (MUDA),13,PRODUCTION SYSTEM ELEMENTS TO ACHIEVE IMPACT (CONTINUED),Element Standardized operations Man/machine separatio
18、n Line stop and call Poka-yoke Root-cause problem solving TPM OEE Continuous flow Takt time Line balance Cell design Quick changeover Pull systems Level scheduling 5S 8 types of waste Visual management,Focus of kaizen Consistency and repeatability Work element times Operator response time Fool proof
19、ing Structured approach Scheduled maintenance Machine downtime Product/operator movement Pace of customer demand Operator work content Work area layout Changeover times Linking demand to production Smoothing production Workplace organization Non-value added operations Information clarity,Primary res
20、ult Documented procedures Reduced operator wait time Reduced scrap Improved product quality Recommendations Minimized machine failures Improved machine utilization Eliminated interruptions Just-in-time production Reduced lead time Optimized motions Higher machine utilization Less inventory On-time d
21、elivery Disciplined workforce Reduced cost Performance charts, labels,14,POINTS TO REMEMBER,Success enabling factors for events Thoughtful approach to project-area selection (e.g., high impact, narrow scope) Team selection performed well in advance and limited to a small number of cross-functional p
22、articipants (4-7) Expectations for team members clearly stated (e.g., level) Choose proper KPI to analyze potential/performance during experimentation Teams should be made up of as many different participants as possible. Deployment of improvement spirit is as important as the individual events Good
23、 prior planning for team logistics (e.g., lunches, night-shift requirements) Follow-up items need to be tracked and structured follow-up meetings scheduled Measurement systems for key performance indicators should be in place after each event Discrete changes (i.e., mechanical fixes or settings, new
24、 equipment) are quickly completed; however, behavioral changes (i.e., procedures, best practices) are extremely difficult to implement. It is the behavioral/cultural changes that make improvement sustainable.,15,SELECTING THE PROJECT AREA,Kaizen event area needs to be strategic and important to the
25、overall transformation process Start with core processes Choose operating problems, not management problems Consider advantages in terms of cost, quality, productivity and delivery response Get input about the project area from: Area director and managers Associates Internal customers and suppliers
26、Make sure management understands what is required in terms of time, resources and impact,16,SELECTING A FACILITATOR CRITERIA FOR SUCCESS,The most essential area of this criteria is problem-solving skills These skills need to be accompanied with a disciplined third-party approach,17,WEEKLY OBJECTIVES
27、 FOR FACILITATORS,Event week Facilitate event Work with team leader on facilitation and problem solving Schedule review-week meeting Follow-up week Work with team leader to get any required standard operating procedures written Schedule training meetings, as required Ensure all-line, all-shift rollo
28、ut Ensure planning for next event is finalized with process owner Review data and create baseline for next event Review this week/next week meeting Cover all follow-up items Identify successes and short comings Consolidate all event histories into 1 book and include a 1-page summaryfor each Audit co
29、mpliance Ensure measurement system in place,18,SELECTING TEAM MEMBERS,Typical team makeup Event facilitator Cross-functional team: Operator(s) from the area (1 day shift and 1 night shift is preferred) 1 maintenance representative 1 supervisor 1 of the following categories: Administration Management
30、 Best practice representative (other plants),Team member attributes Mix of high and low performers Do not load teams with low performers in hopes of raising their performance level High-motivation level Free from other duties Half of the team should be hourly associates Some team members should come
31、 from outside the project area At least 1 team member should be from the project area,Team members for all events should be selected in advance of the start of the first event and notified of where and when to meet for the first day of the project Different team members should be selected for each e
32、vent except for where key process knowledge is needed,1 member takes the role as team leader and owns the event,19,ROLES AND RESPONSIBILITIES,Facilitator Plan event logistics (meeting rooms, meals, etc.) Train and mentor team leaders Document all kaizen activities Assist in preparing and training al
33、l new processes and procedures Coordinate closely with team leaders to ensure the scope and objectives of each event fit the criteria outlined in the training manual Ensure team members are selected in advance and in accordance with the pre-event criteria Ensure supervisor participation in rollout a
34、nd training Maintain third-party outlook on issues and lead team through objective fact-based approach Participate in follow-up meetings, keeping track of complete and outstanding action items Team Leaders Support process with enthusiasm Assure team goals are met Update to-do list Keep everyone invo
35、lved Update management daily on teams progress Learn facilitation and problem solving skills Coordinate team presentation Track event follow-up items and assure completion,20,ROLES AND RESPONSIBILITIES (CONTINUED),Team members Full-time responsibility; must be with the kaizen team during the entire
36、project Participate in the follow-up process as an action taker Management Full support of the improvement effort Kick off the program with plant communication meetings. Kick off each event explaining why the effort is important and how it will impact the business Wrap up each event by receiving rep
37、ort from the kaizen team, soliciting feedback from the teams on the process and reiterating the impact on the business Follow up in a structured manner holding team members accountable for finalizing implementation and brining the correct support to bear on issues out of their control. Set dates, as
38、sign names,21,BASIC STEPS FOR CAPTURING WORK KAIZEN OPPORTUNITIES,Identify kaizen purpose Analyze the current situation Generate alternative ideas Create kaizen plan Implement the kaizen plan with kaizen events Confirm the results,Work kaizen events should not be haphazard or pursued independently b
39、y shop-floor associates. They must serve the overall business strategy and positively impact all of the organization. A kaizen program ensures that opportunities for improvement are identified and captured in the following manner:,22,STEP 1 IDENTIFY KAIZEN PURPOSE,* non-processing time includes stor
40、age time, inspection time, conveyance time,Be dissatisfied Complacency with the current state will hinder efforts to identify opportunities Drive to find better ways of doing things and have the courage to embrace change Actively search for improvement opportunities Question the purpose of each acti
41、vity Strive to identify sources of waste Consider the production lead time production lead time = processing time + non-processing time* Ask for suggestions From supervisors and associates From managers struggling to hit their targets Choose a problem, clearly define it, and get started,23,STEP 2 AN
42、ALYZE THE CURRENT SITUATION,Get the facts Gather information at the source Personally observe the machinery and/or activities involved with the problem Observe during an occurrence of the problem Use available techniques for work analysis Process and flow analysis Understand the sequence of operatio
43、ns and physical routing Work element analysis Understand the detailed steps of the job Motion analysis Break the job down into basic motions (find, grasp, position, assemble) Time analysis Build on the work element analysis by timing each step Standardized operations* Show the current and future sta
44、te using standardization forms (below),Combination table,Operation capacity,Analysis sheet,Operation instructions,* Refer to separate training module titled Standardized Operations for details,24,STEP 3 GENERATE ALTERNATIVE IDEAS,Use idea generation methods 5 Why analysis Brainstorming Review the ru
45、les for work simplification Rules for body motion Rules for the workplace (organization, layout, environment) Rules for the design of parts, tools, and equipment Discuss and adhere to rules for generating ideas Do not criticize Speak freely as you think Strive for quantity initially (the more the be
46、tter) Think about issue from different angles Piggyback other ideas and integrate ideas,25,STEP 4 CREATE KAIZEN PLAN,Establish kaizen objectives Set a quantifiable/measurable targets for improving safety, quality, cost, and/or delivery for the kaizen target area Stress total plant efficiency over ef
47、ficiency improvements of single processes Focus on work kaizen rather than machine kaizen Avoid large capital expenditures Choose the most effective way to deploy resources Train supervisors and let them implement in their area(s) Form a dedicated kaizen team and hold a kaizen event* Create detailed
48、 kaizen plan describing focus of activities Reduce lead time by eliminating wait time, walk time, unnecessary steps Improve layout of parts, materials, tools Sequence and combine operations differently to balance work and create flow Seek and eliminate quality scrap and rework problems Create, docum
49、ent, and train employees on new standardized work Implement workplace organization and visual performance management,* Refer to separate training module titled Kaizen Events for details,26,STEP 5 IMPLEMENT THE KAIZEN PLAN,Communicate Inform related departments likely to be affected by changes Brief
50、shop floor employees on kaizen objectives before the activity begins Discuss changes with shop floor employees, not only what and how but also why Ask for management help when needed to remove barriers to implementation Update management daily on progress Create an atmosphere conducive to change Lea
51、d by example (remain positive, supportive, and work hard) Train employees by working with them at their work station Remember that it is unpleasant for employees to perform unfamiliar tasks Congratulate employees on their successes Be willing to alter the plan Remind team members that failed trials
52、may occur and are an important part of the improvement process Communicate changes to the plan Overcome hurdles rather than extending the implementation timeline,27,STEP 6 CONFIRM AND COMMUNICATE RESULTS,Confirm implementation status of each action item Confirm actual results quantitatively Improvem
53、ents should be consistently repeatable Compare actual results to expected results and perform a gap analysis Some problems do not surface until after implementation Verify adherence to new work procedures regardless of results Present results Provide an opportunity for the team to present their resu
54、lts (20 minutes) Discuss kaizen results compared to plan Allow for questions and answers Standardize the results Document new work procedures Use new documentation as training aids Maintain visual performance management and review sessions Meet periodically to review performance If performance slips
55、, assign additional action items to rectify Celebrate success once goals are consistently met Seek further improvements,As part of the kaizen activity, the kaizen teams or supervisors must also:,28,ANNOUNCING EVENT KAIZEN ACTIVITY SHEET,Distribute 1-2 weeks before event Copy the team members supervi
56、sors,29,STARTING KAIZEN TEAM OBSERVATIONS,Look for variation and understand its cause,Where are the parts? Does the operator have to: Turn? Reach? Wait? Unpack? Move? Are the parts arranged in the order used? Are parts moved twice? Is the box too large?,Is the work cycle consistent ? Why is there va
57、riation? Is it logical? Do employees help each other? Is there wait time? Are two hands used or one? Do people build ahead?,Tooling What is its purpose? Does it serve this purpose? Can it be combined with others? How can it be better? Can tools be reached without having to look? Do parts auto eject
58、from machines?,Movement Is there excessive travel? Is the flow smooth or erratic?,Visual management Is the area cluttered? Are areas/ locations of items marked? Are shelves labeled? Are all the items required in the area?,30,STARTING KAIZEN TEAM OBSERVATIONS (CONTINUED),Defects Do they occur? What i
59、s the problem? Is there feedback? Is the line disrupted to fix the issue? How often do they occur? Is the specification present and clear? Are limit samples displayed “good/ bad”?,Work cycle What is the work content? What are the lowest repeatable times (measure 10-15 cycles to establish)? What is the takt time? Is the line balanced? Which tasks can be moved around to balance the line?,Material handling Is there a material handler? Is there a routine cycle? How much wait time is in it? How much is value added? How l
温馨提示
- 1. 本站所有资源如无特殊说明,都需要本地电脑安装OFFICE2007和PDF阅读器。图纸软件为CAD,CAXA,PROE,UG,SolidWorks等.压缩文件请下载最新的WinRAR软件解压。
- 2. 本站的文档不包含任何第三方提供的附件图纸等,如果需要附件,请联系上传者。文件的所有权益归上传用户所有。
- 3. 本站RAR压缩包中若带图纸,网页内容里面会有图纸预览,若没有图纸预览就没有图纸。
- 4. 未经权益所有人同意不得将文件中的内容挪作商业或盈利用途。
- 5. 人人文库网仅提供信息存储空间,仅对用户上传内容的表现方式做保护处理,对用户上传分享的文档内容本身不做任何修改或编辑,并不能对任何下载内容负责。
- 6. 下载文件中如有侵权或不适当内容,请与我们联系,我们立即纠正。
- 7. 本站不保证下载资源的准确性、安全性和完整性, 同时也不承担用户因使用这些下载资源对自己和他人造成任何形式的伤害或损失。
最新文档
- T/SXJP 063-2023桃红葡萄酒
- T/SZAA 002-2024车身域控制器通用功率驱动装置测试规程
- T/DZJN 434-2025分布式调相机型式试验导则
- T/CI 1254-2025纯钛保温壶杯
- T/BZJK 27-2024疗养式养老服务基本规范
- T/COEMA 109S-2021LED显示屏 术语和定义
- AI在社会学中的应用
- 2025~2026学年安徽毫州市利辛县北师大版三年级下册数册末试卷【附答案】
- 2026学年山西省朔州市四年级语文期末提升素养提升题(附答案)详细答案和解析
- PHP开发工程师笔试真题(含详细答案)
- DB11T 2543-2026花坛花境植物景观营造与养护技术规程
- 2026年杭州市实业投资集团有限公司人员招聘考试参考试题及答案详解
- 2026杭州水务集团笔试题库及答案
- 桩间挡土板墙工程专项施工方案
- 第9课《谈骨气》课件
- 日语N5语法练习加详解
- 成本实操-印制电路板(PCB)行业成本核算报表实例
- 2026智能制造成熟度评估与辅导方案
- 2026广东江门市广悦化工股份有限公司招聘5人考试备考试题及答案解析
- 2026年工程管理高级工程师职称答辩真题及答案
- 艾灸护理创新技术应用
评论
0/150
提交评论